Herling Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Dec 2025
- Last 24 months
- 2 permits filed
73 permits since 2000: 47 completed, 2 in progress, 19 never finaled, 5 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 5 completed, 1 never finaled. Typically 34 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2022 | Completed final sign-off Feb 2025 | 229 Bonview St | convert 575 sf of garage to conditioned space & replace int stair. replace foundation. demolish existing deck stair to upper deck. replace windows & doors @ rear. 3 new skylilghts. replace in-kind less than 50% of rear deck due to rot. replace in-kind front window due to dry-rotDetails
convert 575 sf of garage to conditioned space & replace int stair. replace foundation. demolish existing deck stair to upper deck. replace windows & doors @ rear. 3 new skylilghts. replace in-kind less than 50% of rear deck due to rot. replace in-kind front window due to dry-rot | $150,000 |
| Sep 4, 2015 | Never finaled issued Mar 2016, no final | 191 Moffitt St | (e) lower basement: provide (n) vestibule for stair to rear yard/(e)basement. (n) closet, (n) lower basement/(e) ground flr: (n) interior doors, move wall @ garage, expand (e) deck, (n) sliding glass door, (n) rear windows (e) second floor: remove wall @ livingdining rm, (n) rear sliding glass door.Details
(e) lower basement: provide (n) vestibule for stair to rear yard/(e)basement. (n) closet, (n) lower basement/(e) ground flr: (n) interior doors, move wall @ garage, expand (e) deck, (n) sliding glass door, (n) rear windows (e) second floor: remove wall @ livingdining rm, (n) rear sliding glass door. | $55,000 |
| Aug 13, 2015 | Completed final sign-off Jan 2020 | 177 08th Av | ground level: (n) family room, (n) bedroom, (n) bathroom, stair replacement. 2nd level: remodel kitchn, (n) rear deck, (n) powder room. 3rd level: remodel bedrooms & bathroom, (n) master bathroom, (n) laundry room, window replacements, infill (e) lightwells & add ground floor area below deck (515sf)Details
ground level: (n) family room, (n) bedroom, (n) bathroom, stair replacement. 2nd level: remodel kitchn, (n) rear deck, (n) powder room. 3rd level: remodel bedrooms & bathroom, (n) master bathroom, (n) laundry room, window replacements, infill (e) lightwells & add ground floor area below deck (515sf) | $285,000 |
| Jul 22, 2013 | Completed final sign-off Oct 2013 | 2834 Buchanan St | deck repair less than 50% repair in kind.Details
deck repair less than 50% repair in kind. | $6,000 |
| Aug 16, 2010 | Completed final sign-off Oct 2010 | 461 Collingwood St | dryrot repair to rear deck. replace 18 joist less than 50% 2x 8 same as existing. pressure treated.Details
dryrot repair to rear deck. replace 18 joist less than 50% 2x 8 same as existing. pressure treated. | $3,000 |
| Mar 19, 2007 | Completed final sign-off Sep 2007 | 764 Hampshire St | deck repair under 50% . repair in kind.Details
deck repair under 50% . repair in kind. | $1,000 |