Back to bathroom remodel contractors
Herling Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Dec 2025
- Last 24 months
- 2 permits filed
73 permits since 2000: 47 completed, 2 in progress, 19 never finaled, 5 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 5 completed, 1 in progress, 6 never finaled, 1 expired or cancelled. Typically 22 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2024 | In progress issued Sep 2024 | 1524 Guerrero St | revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count changeDetails
revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count change | |
| Feb 15, 2023 | Never finaled issued Mar 2023, no final | 1524 Guerrero St | interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f.Details
interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f. | $394,000 |
| Mar 5, 2020 | Never finaled issued Jul 2020, no final | 147 Baltimore Wy | kitchen & bathroom remodel w/window repair & skylight replacementsDetails
kitchen & bathroom remodel w/window repair & skylight replacements | $36,000 |
| Nov 30, 2017 | Completed final sign-off Aug 2019 | 638 Castro St | bathroom remodel, same size, no structural work. install new lighting in bathroom hallway, living room, dining room and family room.Details
bathroom remodel, same size, no structural work. install new lighting in bathroom hallway, living room, dining room and family room. | $18,000 |
| Jul 6, 2016 | Never finaled issued Jun 2017, no final | 566 Rhode Island St | revision to ref pa 201511203243: add 2nd flr bathroom. new skylightDetails
revision to ref pa 201511203243: add 2nd flr bathroom. new skylight | $10,000 |
| Aug 13, 2015 | Completed final sign-off Jan 2020 | 177 08th Av | ground level: (n) family room, (n) bedroom, (n) bathroom, stair replacement. 2nd level: remodel kitchn, (n) rear deck, (n) powder room. 3rd level: remodel bedrooms & bathroom, (n) master bathroom, (n) laundry room, window replacements, infill (e) lightwells & add ground floor area below deck (515sf)Details
ground level: (n) family room, (n) bedroom, (n) bathroom, stair replacement. 2nd level: remodel kitchn, (n) rear deck, (n) powder room. 3rd level: remodel bedrooms & bathroom, (n) master bathroom, (n) laundry room, window replacements, infill (e) lightwells & add ground floor area below deck (515sf) | $285,000 |
| Jun 30, 2015 | Never finaled issued Oct 2015, no final | 191 Moffitt St | remodel kitchen and new master bathroom to replace extg master bathroom.Details
remodel kitchen and new master bathroom to replace extg master bathroom. | $35,000 |
| Nov 17, 2014 | Completed final sign-off Sep 2015 | 167 Hancock St | remodel (e) bathroom & (e) kitchen @ (e) 1/f apartment. add laundry hookups, move water heater and furnace into existing closet, provide 1 hr. wall @ property line.Details
remodel (e) bathroom & (e) kitchen @ (e) 1/f apartment. add laundry hookups, move water heater and furnace into existing closet, provide 1 hr. wall @ property line. | $25,000 |
| Jul 16, 2014 | Never finaled issued May 2015, no final | 566 Rhode Island St | 18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors inDetails
18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors in | $200,000 |
| Apr 3, 2012 | Completed final sign-off Jul 2012 | 461 Collingwood St | one bathroom fixtures & tile replacement, no structural work to be performed, lighting to comply with cec 150 (k).Details
one bathroom fixtures & tile replacement, no structural work to be performed, lighting to comply with cec 150 (k). | $6,000 |
| Apr 7, 2010 | Completed final sign-off Jun 2010 | 1455 06th Av | revision to 200703287517. omit bathroom conversion work of e sunroom on 3rd fl. new bath in masterbedroom and add closetDetails
revision to 200703287517. omit bathroom conversion work of e sunroom on 3rd fl. new bath in masterbedroom and add closet | $7,500 |
| Nov 28, 2006 | Expired or cancelled expired Aug 2011 | 830 Alabama St | unit b - kitchen/bath renovation. removing non bearing walls.Details
unit b - kitchen/bath renovation. removing non bearing walls. | $25,000 |
| Jul 28, 2006 | Never finaled issued Jul 2006, no final | 70 Divisadero St | repair hot tub pump & access panel on 2nd floor unit only. in (e) existing bathroom. no other work for this permit.Details
repair hot tub pump & access panel on 2nd floor unit only. in (e) existing bathroom. no other work for this permit. | $400 |