168 permits since 2000: 110 completed, 37 in progress, 17 never finaled, 4 expired or cancelled.
Of the 17 never-finaled permits, 4 are 3 to 5 years old, 13 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 never finaled. Typically 96 days from filing to permit and 375 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2021 | Never finaled issued Dec 2021, no final | 885 Folsom St | rev to pa# 2020-1119-9331: vertical platfom lift deleted from scope of work, kitchenette relocated to level 01, configuring area located to level 02, offices relocated on levels 01 and 02 access to patio via sliding door, one step added between level 01 entry lobby and office areas, ramp elongatedDetails
rev to pa# 2020-1119-9331: vertical platfom lift deleted from scope of work, kitchenette relocated to level 01, configuring area located to level 02, offices relocated on levels 01 and 02 access to patio via sliding door, one step added between level 01 entry lobby and office areas, ramp elongated | |
| Oct 13, 2021 | Completed final sign-off Oct 2023 | 4101 Noriega St | full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordableDetails
full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordable | $6,670,000 |
| Jan 12, 2021 | Completed final sign-off Apr 2022 | 1950 Mission St | t.i. provide & install (n) demissing partition at vacant ground flr for bicycle repair shop. interior lighting, elec, & mech; kitchenetteDetails
t.i. provide & install (n) demissing partition at vacant ground flr for bicycle repair shop. interior lighting, elec, & mech; kitchenette | $32,000 |
| Dec 11, 2018 | Never finaled issued Jan 2019, no final | 2217 Mission St | mod, units 101, 103, 104, 201, 202, 203 & 204 - partial window r &r, kitchen and bath remodel, flooring & paint as needed, electrical wall heaters, hot waters heaters. unit 104 - installation of hvi (communication unit).Details
mod, units 101, 103, 104, 201, 202, 203 & 204 - partial window r &r, kitchen and bath remodel, flooring & paint as needed, electrical wall heaters, hot waters heaters. unit 104 - installation of hvi (communication unit). | $85,000 |
| Sep 27, 2016 | Completed final sign-off Jan 2017 | 326 Pierce St | conversion of (e) 1 bedroom unit into (2) bedroom unit, on 2nd floor (unit #1). demolition of (e) structural walls. new kitchen cabinets new plumbing fixtures. new lighting & electrical. new mechanical. no exterior work no fire alarm or sprinkler workDetails
conversion of (e) 1 bedroom unit into (2) bedroom unit, on 2nd floor (unit #1). demolition of (e) structural walls. new kitchen cabinets new plumbing fixtures. new lighting & electrical. new mechanical. no exterior work no fire alarm or sprinkler work | $10,000 |
| Sep 26, 2016 | Completed final sign-off Jun 2018 | 1049 Golden Gate Av | 11 units only to repair work: replace bathroom fixtures, flooring, replace kitchen cabinets and appliances, replace windows where needed, new paint interior, repair dry rot where seen at bay windows and adjacent walls, reframing at some bay dut to water damage.Details
11 units only to repair work: replace bathroom fixtures, flooring, replace kitchen cabinets and appliances, replace windows where needed, new paint interior, repair dry rot where seen at bay windows and adjacent walls, reframing at some bay dut to water damage. | $1,000,000 |