Guzman Construction Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Sep 2026
- Last 24 months
- 56 permits filed
168 permits since 2000: 110 completed, 37 in progress, 17 never finaled, 4 expired or cancelled.
Of the 17 never-finaled permits, 4 are 3 to 5 years old, 13 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 1 completed, 1 in progress, 1 never finaled. Typically 315 days from filing to permit and 47 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2023 | In progress issued Oct 2025 | 1055 Ellis St | alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator.Details
alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator. | $1,600,000 |
| Dec 9, 2021 | Completed final sign-off Feb 2022 | 885 Folsom St | new stair in e 2 story type vb building per approved permit 202011199331Details
new stair in e 2 story type vb building per approved permit 202011199331 | $15,000 |
| Jun 16, 2016 | Never finaled issued Apr 2017, no final | 333 Dolores St | sfbc ord. 3428.5 private sch seismic retrofit, all deficiencies corrected, interior ti to upgrade accessibility and life safety. installation of 2 interior exit access stairs dedicated to the 1st and 2nd fl only, misc egress and life safety upgrades to existing concrete framed buildingDetails
sfbc ord. 3428.5 private sch seismic retrofit, all deficiencies corrected, interior ti to upgrade accessibility and life safety. installation of 2 interior exit access stairs dedicated to the 1st and 2nd fl only, misc egress and life safety upgrades to existing concrete framed building |