Dec 2015 to Aug 2026
Last 24 months
26 permits filed

139 permits since 2000: 94 completed, 8 in progress, 28 never finaled, 9 expired or cancelled.

Of the 28 never-finaled permits, 3 are 3 to 5 years old, 25 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllDeck 1Stairs 5Kitchen remodel 77Bathroom remodel 56

56 bathroom remodel permits: 40 completed, 4 in progress, 11 never finaled, 1 expired or cancelled. Typically 14 days from filing to permit and 156 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 5, 2026In progress
issued Aug 2026
1040 Ashbury Stunit 6: remodel 2 bathrooms and 1 kitchen in kind like for like. no tub conversions. no removal of walls
Details
Permit
202608056085
Status
issued
Filed
Aug 5, 2026
Permit issued
Aug 5, 2026
Declared cost
$45,000
Address
1040 Ashbury St

unit 6: remodel 2 bathrooms and 1 kitchen in kind like for like. no tub conversions. no removal of walls

Open the permit page

$45,000
Jul 13, 2026In progress
issued Jul 2026
1250 Clay Stunit 203: remodel kitchen and bathroom like for like. new plumbing and electrical as needed.
Details
Permit
202607134944
Status
issued
Filed
Jul 13, 2026
Permit issued
Jul 14, 2026
Declared cost
$38,000
Address
1250 Clay St

unit 203: remodel kitchen and bathroom like for like. new plumbing and electrical as needed.

Open the permit page

$38,000
Apr 20, 2026Completed
final sign-off Aug 2026
1340 Stevenson Stunit 1340-b: remodel existing kitchen and bath. no change to layout. all work in kind. install new electrical panel, new lights.
Details
Permit
202604209751
Status
complete
Filed
Apr 20, 2026
Permit issued
Apr 20, 2026
Final sign-off
Aug 14, 2026
Declared cost
$25,000
Address
1340 Stevenson St

unit 1340-b: remodel existing kitchen and bath. no change to layout. all work in kind. install new electrical panel, new lights.

Open the permit page

$25,000
Apr 20, 2026Completed
final sign-off Jul 2026
1736 Gough Stbathroom remodel on third floor.
Details
Permit
202604209687
Status
complete
Filed
Apr 20, 2026
Permit issued
Apr 20, 2026
Final sign-off
Jul 10, 2026
Declared cost
$50,000
Address
1736 Gough St

bathroom remodel on third floor.

Open the permit page

$50,000
Mar 25, 2026In progress
issued Apr 2026
17 Ford Stchange 2 (e) windows, repair water damaged finishes/plumbing fixtures in bathroom @ basement strage. no electrical or mechanical scope.
Details
Permit
202603258243
Status
issued
Filed
Mar 25, 2026
Permit issued
Apr 13, 2026
Declared cost
$10,000
Address
17 Ford St

change 2 (e) windows, repair water damaged finishes/plumbing fixtures in bathroom @ basement strage. no electrical or mechanical scope.

Open the permit page

$10,000
Mar 4, 2026In progress
issued Mar 2026
2031 Castro Stunit #32 revision to this permit# 202510147317: this permit is to add a shower to an (e) bath.
Details
Permit
202603046921
Status
issued
Filed
Mar 4, 2026
Permit issued
Mar 4, 2026
Declared cost
$3,000
Address
2031 Castro St

unit #32 revision to this permit# 202510147317: this permit is to add a shower to an (e) bath.

Open the permit page

$3,000
Mar 3, 2026Completed
final sign-off Sep 2026
1101 Green Stunit 1702: kitchen & bathroom remodel: including new fixtures and cabinets, appliances, lighting & electrical.
Details
Permit
202603036824
Status
complete
Filed
Mar 3, 2026
Permit issued
Mar 3, 2026
Final sign-off
Sep 15, 2026
Declared cost
$50,000
Address
1101 Green St

unit 1702: kitchen & bathroom remodel: including new fixtures and cabinets, appliances, lighting & electrical.

Open the permit page

$50,000
Feb 2, 2026Completed
final sign-off Jul 2026
227 Laguna Stremodel (2) bathrooms demo and replace in kind. new plumbing fixtures, new lights.
Details
Permit
202602025034
Status
complete
Filed
Feb 2, 2026
Permit issued
Feb 2, 2026
Final sign-off
Jul 14, 2026
Declared cost
$35,000
Address
227 Laguna St

remodel (2) bathrooms demo and replace in kind. new plumbing fixtures, new lights.

Open the permit page

$35,000
Oct 15, 2025Completed
final sign-off Mar 2026
2037 Castro Stapt 21: new laundry, new bathroom & new closet. no change of use, exteriors, egress or unit area. no structural work.
Details
Permit
202510157435
Status
complete
Filed
Oct 15, 2025
Permit issued
Jan 9, 2026
Final sign-off
Mar 4, 2026
Declared cost
$20,000
Address
2037 Castro St

apt 21: new laundry, new bathroom & new closet. no change of use, exteriors, egress or unit area. no structural work.

Open the permit page

$20,000
Oct 14, 2025Completed
final sign-off May 2026
2035 Castro Stunit #32 interior renovation on 3rd fl. new laundry, closet & bathroom. no change to use, exteriors, egress or unit area. no structural.
Details
Permit
202510147317
Status
complete
Filed
Oct 14, 2025
Permit issued
Jan 12, 2026
Final sign-off
May 20, 2026
Declared cost
$5,000
Address
2035 Castro St

unit #32 interior renovation on 3rd fl. new laundry, closet & bathroom. no change to use, exteriors, egress or unit area. no structural.

Open the permit page

$5,000
Oct 2, 2025Completed
final sign-off Mar 2026
2031 Castro Stunit 22- 2nd floor remodel to include (n) laundry , bathroom, and closet. no change to use, exterior, egress or addtional square footage.
Details
Permit
202510026604
Status
complete
Filed
Oct 2, 2025
Permit issued
Dec 12, 2025
Final sign-off
Mar 2, 2026
Declared cost
$20,000
Address
2031 Castro St

unit 22- 2nd floor remodel to include (n) laundry , bathroom, and closet. no change to use, exterior, egress or addtional square footage.

Open the permit page

$20,000
Aug 8, 2025Completed
final sign-off Oct 2025
2127 Balboa Stbathroom remodel like for like new plumbing fixtures new lighting fixtures
Details
Permit
202508082612
Status
complete
Filed
Aug 8, 2025
Permit issued
Aug 8, 2025
Final sign-off
Oct 20, 2025
Declared cost
$20,000
Address
2127 Balboa St

bathroom remodel like for like new plumbing fixtures new lighting fixtures

Open the permit page

$20,000
Nov 6, 2023Completed
final sign-off Jan 2024
305 Castro Stunit #1: remodel (e) kitchen and bath no change on layout new light fixtures, new plumbing fixtures
Details
Permit
202311060196
Status
complete
Filed
Nov 6, 2023
Permit issued
Nov 6, 2023
Final sign-off
Jan 22, 2024
Declared cost
$25,000
Address
305 Castro St

unit #1: remodel (e) kitchen and bath no change on layout new light fixtures, new plumbing fixtures

Open the permit page

$25,000
Oct 12, 2023Completed
final sign-off Jan 2025
75 Caselli Avremodel of (e) kitchen and bathroom plus on new bath and one new 1/2 bath conversion of lower level crawl space to habitable space, no expansion of (e) building envelope new winows at street facade
Details
Permit
202310128561
Status
complete
Filed
Oct 12, 2023
Permit issued
Nov 10, 2023
Final sign-off
Jan 7, 2025
Declared cost
$475,000
Address
75 Caselli Av

remodel of (e) kitchen and bathroom plus on new bath and one new 1/2 bath conversion of lower level crawl space to habitable space, no expansion of (e) building envelope new winows at street facade

Open the permit page

$475,000
Jun 14, 2023Completed
final sign-off Jan 2024
1190 Geneva Avto comply w/nov# 202200668, 1st flr fire damage repair for stud walls and floor joists. upgrade commercial space, new ada bath and path of travel upgrade, new foundation upgrade, lower slab upgrade.
Details
Permit
202306140110
Status
complete
Filed
Jun 14, 2023
Permit issued
Jul 10, 2023
Final sign-off
Jan 29, 2024
Declared cost
$120,000
Address
1190 Geneva Av

to comply w/nov# 202200668, 1st flr fire damage repair for stud walls and floor joists. upgrade commercial space, new ada bath and path of travel upgrade, new foundation upgrade, lower slab upgrade.

Open the permit page

$120,000
Mar 27, 2023Completed
final sign-off Jan 2024
1192 Geneva Avto comply with nov# 202200668. fire related repairs, electrical, plumbing, framing, sheetrock, replace to like, no change in layout. repair siding and stairs at back. replace kitchen and bath at upper unit.
Details
Permit
202303274458
Status
complete
Filed
Mar 27, 2023
Permit issued
Mar 31, 2023
Final sign-off
Jan 29, 2024
Declared cost
$20,000
Address
1192 Geneva Av

to comply with nov# 202200668. fire related repairs, electrical, plumbing, framing, sheetrock, replace to like, no change in layout. repair siding and stairs at back. replace kitchen and bath at upper unit.

Open the permit page

$20,000
Feb 24, 2023Completed
final sign-off Feb 2025
969 Hayes Stunit 2: remodel existing (1) kitchen and (1) bath in kind, no change on layout, new bath fixtures, new appliances.
Details
Permit
202302242614
Status
complete
Filed
Feb 24, 2023
Permit issued
Feb 24, 2023
Final sign-off
Feb 5, 2025
Declared cost
$20,000
Address
969 Hayes St

unit 2: remodel existing (1) kitchen and (1) bath in kind, no change on layout, new bath fixtures, new appliances.

Open the permit page

$20,000
Jan 27, 2023Completed
final sign-off Apr 2023
305 Castro Stunit #300: remodel (2) (e) bathrooms. replace lights and plumbing fixtures with no chagne to (e) layout.
Details
Permit
202301270888
Status
complete
Filed
Jan 27, 2023
Permit issued
Jan 27, 2023
Final sign-off
Apr 11, 2023
Declared cost
$14,500
Address
305 Castro St

unit #300: remodel (2) (e) bathrooms. replace lights and plumbing fixtures with no chagne to (e) layout.

Open the permit page

$14,500
Jul 14, 2022Completed
final sign-off Dec 2022
530 Stockton Stunit's: 206, 405, 601: kitchen bathroom remodel like for like. no change on layouts: new light fixtures, plumbing fixtures for all units mentioned.
Details
Permit
202207148462
Status
complete
Filed
Jul 14, 2022
Permit issued
Jul 14, 2022
Final sign-off
Dec 21, 2022
Declared cost
$75,000
Address
530 Stockton St

unit's: 206, 405, 601: kitchen bathroom remodel like for like. no change on layouts: new light fixtures, plumbing fixtures for all units mentioned.

Open the permit page

$75,000
Jun 10, 2022Completed
final sign-off Sep 2022
2656 Van Ness Avunit #11: kitchen and bathroom remodel. no change on layout. new lighting, bath accessories.
Details
Permit
202206106046
Status
complete
Filed
Jun 10, 2022
Permit issued
Jun 10, 2022
Final sign-off
Sep 6, 2022
Declared cost
$25,000
Address
2656 Van Ness Av

unit #11: kitchen and bathroom remodel. no change on layout. new lighting, bath accessories.

Open the permit page

$25,000
Apr 19, 2022Never finaled
issued Apr 2022, no final
530 Stockton Stunit 609: remodel of (1)(e) kitchen and (1) bathroom, new plumbing fixtures, new cab,new lights, no change to layout
Details
Permit
202204192512
Status
issued
Filed
Apr 19, 2022
Permit issued
Apr 19, 2022
Declared cost
$30,000
Address
530 Stockton St

unit 609: remodel of (1)(e) kitchen and (1) bathroom, new plumbing fixtures, new cab,new lights, no change to layout

Open the permit page

$30,000
Mar 8, 2021Never finaled
issued May 2021, no final
555 Buena Vista West Avunit #304: convert studio to 1 bedroom. bathroom remodel. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work.
Details
Permit
202103086051
Status
issued
Filed
Mar 8, 2021
Permit issued
May 24, 2021
Declared cost
$65,000
Address
555 Buena Vista West Av

unit #304: convert studio to 1 bedroom. bathroom remodel. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work.

Open the permit page

$65,000
Feb 22, 2021Completed
final sign-off Jun 2021
600 Chestnut Strevissed estimated cost and scope for pa# 202101253226; remodel of existing kitchen no change to layout replace tile and 2 bath ( floor only) install ne floor/ no change to layout no fire alarm work
Details
Permit
202102225078
Status
complete
Filed
Feb 22, 2021
Permit issued
Feb 22, 2021
Final sign-off
Jun 28, 2021
Declared cost
$15,000
Address
600 Chestnut St

revissed estimated cost and scope for pa# 202101253226; remodel of existing kitchen no change to layout replace tile and 2 bath ( floor only) install ne floor/ no change to layout no fire alarm work

Open the permit page

$15,000
Jan 25, 2021Completed
final sign-off Jun 2021
600 Chestnut St(unit #204) kitchen & 2 bathrooms remodel in kind. replace cabinets. install new hardwood flooring.
Details
Permit
202101253226
Status
complete
Filed
Jan 25, 2021
Permit issued
Jan 25, 2021
Final sign-off
Jun 28, 2021
Declared cost
$15,000
Address
600 Chestnut St

(unit #204) kitchen & 2 bathrooms remodel in kind. replace cabinets. install new hardwood flooring.

Open the permit page

$15,000
Jan 15, 2021Never finaled
issued Mar 2021, no final
555 Buena Vista West Avapts 201 & 506: new bedrooms and bathrooms.new kitchen cainbets and plumbing fixtures.new washer/dryers & dishwashers.new lighting at (e) j-box locations.no change to mechanical. no exterior work.no fire alarm or sprinkler work. no structural work.
Details
Permit
202101152803
Status
issued
Filed
Jan 15, 2021
Permit issued
Mar 15, 2021
Declared cost
$130,000
Address
555 Buena Vista West Av

apts 201 & 506: new bedrooms and bathrooms.new kitchen cainbets and plumbing fixtures.new washer/dryers & dishwashers.new lighting at (e) j-box locations.no change to mechanical. no exterior work.no fire alarm or sprinkler work. no structural work.

Open the permit page

$130,000
Nov 6, 2020Completed
final sign-off May 2021
1635 Gough Stunit #502: new bedrooms and new bathrooms. new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting at existing j-boxes. no change to mechanical. no exterior work, fire alarm, or sprinkler. no structural work
Details
Permit
202011068412
Status
complete
Filed
Nov 6, 2020
Permit issued
Dec 11, 2020
Final sign-off
May 5, 2021
Declared cost
$65,000
Address
1635 Gough St

unit #502: new bedrooms and new bathrooms. new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting at existing j-boxes. no change to mechanical. no exterior work, fire alarm, or sprinkler. no structural work

Open the permit page

$65,000
Oct 15, 2020Completed
final sign-off Aug 2021
555 Buena Vista West Avunit #102 (1st floor) & #306 (3rd floor) renovation: new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer and dishwashers. (n) lighting.
Details
Permit
202010156606
Status
complete
Filed
Oct 15, 2020
Permit issued
Feb 26, 2021
Final sign-off
Aug 2, 2021
Declared cost
$65,000
Address
555 Buena Vista West Av

unit #102 (1st floor) & #306 (3rd floor) renovation: new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer and dishwashers. (n) lighting.

Open the permit page

$65,000
Aug 22, 2020Never finaled
issued Oct 2020, no final
1555 Chestnut Stunit 22-3/f: renovation. (n) media rm, office & bath. (n) kitchen cabs & plum fixtures. (n) washer dryer, dishwasher. (n) lights at (e) j-box. no exterior work. 1 fire alarm. no sprinkler work. structural calcs needed.
Details
Permit
202008222451
Status
issued
Filed
Aug 22, 2020
Permit issued
Oct 20, 2020
Declared cost
$65,000
Address
1555 Chestnut St

unit 22-3/f: renovation. (n) media rm, office & bath. (n) kitchen cabs & plum fixtures. (n) washer dryer, dishwasher. (n) lights at (e) j-box. no exterior work. 1 fire alarm. no sprinkler work. structural calcs needed.

Open the permit page

$65,000
Jun 15, 2020Expired or cancelled
expired Jan 2026
1935 Jefferson Stadding (2) two units on first level per ordinance 162-16. convert existing garage into new dwelling units within (e) existing envelope. five new bedrooms, three new bathrooms, two new dishwashers, four new washer/dryers. new windows facing street. fire alarm/sprinkler work under separate ppermt.
Details
Permit
202006158744
Status
expired
Filed
Jun 15, 2020
Permit issued
Oct 24, 2022
Declared cost
$175,000
Address
1935 Jefferson St

adding (2) two units on first level per ordinance 162-16. convert existing garage into new dwelling units within (e) existing envelope. five new bedrooms, three new bathrooms, two new dishwashers, four new washer/dryers. new windows facing street. fire alarm/sprinkler work under separate ppermt.

Open the permit page

$175,000
Mar 4, 2020Never finaled
issued Jun 2020, no final
1635 Gough Strenovate of 4 apt - 102, 402, 404 and 501 - new bedrooms and offices. no office for unit 102. new kitchen cabinets, plumbing fixtures & appliances. new washer/dryer & dishwashers. new plumbing fixtures in (e) baths & new plumbing fixtures in bathrms. (n) lighting at (e) j-box locations, (n) elec
Details
Permit
202003046158
Status
issued
Filed
Mar 4, 2020
Permit issued
Jun 15, 2020
Declared cost
$265,000
Address
1635 Gough St

renovate of 4 apt - 102, 402, 404 and 501 - new bedrooms and offices. no office for unit 102. new kitchen cabinets, plumbing fixtures & appliances. new washer/dryer & dishwashers. new plumbing fixtures in (e) baths & new plumbing fixtures in bathrms. (n) lighting at (e) j-box locations, (n) elec

Open the permit page

$265,000
Feb 19, 2020Completed
final sign-off Sep 2020
140 20th Avrenovation of 1 apt 106 on 2nd level, new bedroom and bath. new kitchen cabinets, plumb fix. new lighting a e jbox locations. no change to mech. no exterior work. no fire alarm sprinkler work. struc drawings calcs provided.
Details
Permit
202002194831
Status
complete
Filed
Feb 19, 2020
Permit issued
Jun 15, 2020
Final sign-off
Sep 9, 2020
Declared cost
$65,000
Address
140 20th Av

renovation of 1 apt 106 on 2nd level, new bedroom and bath. new kitchen cabinets, plumb fix. new lighting a e jbox locations. no change to mech. no exterior work. no fire alarm sprinkler work. struc drawings calcs provided.

Open the permit page

$65,000
Nov 20, 2019Never finaled
issued Feb 2020, no final
2390 Francisco Stunit 303, 4th fl - reno bedroom and bathroom. new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical, no exterior work, fire alarm or sprinkler work. structural work needed
Details
Permit
201911207747
Status
issued
Filed
Nov 20, 2019
Permit issued
Feb 11, 2020
Declared cost
$65,000
Address
2390 Francisco St

unit 303, 4th fl - reno bedroom and bathroom. new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical, no exterior work, fire alarm or sprinkler work. structural work needed

Open the permit page

$65,000
Nov 12, 2019Never finaled
issued Nov 2019, no final
140 20th Avunit 306: renovation of 1 apartment on 4th level, new bedroom & bathroom, new kitchen cabinets and plumbing fixtures, new washer/dryer, dishwasher, new lighting at (e) j-box locations, no change to mechanical, no exterior work, no fires alam or sprinkler work, structural drawings and calcs provided
Details
Permit
201911127029
Status
issued
Filed
Nov 12, 2019
Permit issued
Nov 27, 2019
Declared cost
$65,000
Address
140 20th Av

unit 306: renovation of 1 apartment on 4th level, new bedroom & bathroom, new kitchen cabinets and plumbing fixtures, new washer/dryer, dishwasher, new lighting at (e) j-box locations, no change to mechanical, no exterior work, no fires alam or sprinkler work, structural drawings and calcs provided

Open the permit page

$65,000
Sep 19, 2019Never finaled
issued Nov 2019, no final
975 Burnett Avrenovation of 2 units: unit 1 on 1st level and unit 9 on the 2nd level, new bedrooms and baths, new kitchen cabinets and plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j box locations, no change to mech, no exterior work, no fire alarm, sprinkler work or structural work.
Details
Permit
201909192100
Status
issued
Filed
Sep 19, 2019
Permit issued
Nov 7, 2019
Declared cost
$135,000
Address
975 Burnett Av

renovation of 2 units: unit 1 on 1st level and unit 9 on the 2nd level, new bedrooms and baths, new kitchen cabinets and plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j box locations, no change to mech, no exterior work, no fire alarm, sprinkler work or structural work.

Open the permit page

$135,000
Sep 5, 2019Never finaled
issued Sep 2019, no final
936 Scott Strenov unit 1, 1/f: 2bd/1ba to 3bd/2ba new bedroom & bathroom, kitchen cabinets, plmb fixtures, new w/d & d/w, lighting at (e) j-box locations, no change to mech, ext, fire alarm/sprinkler or structural
Details
Permit
201909050767
Status
issued
Filed
Sep 5, 2019
Permit issued
Sep 12, 2019
Declared cost
$65,000
Address
936 Scott St

renov unit 1, 1/f: 2bd/1ba to 3bd/2ba new bedroom & bathroom, kitchen cabinets, plmb fixtures, new w/d & d/w, lighting at (e) j-box locations, no change to mech, ext, fire alarm/sprinkler or structural

Open the permit page

$65,000
Aug 15, 2019Completed
final sign-off Feb 2020
1635 Gough Strenov unit 302, 4/f: new kitchen, bedrooms, bathrooms, d/w, w/d, plmb fixtures. no change to mech. no ext work. no fa/sprinkler/structural
Details
Permit
201908158913
Status
complete
Filed
Aug 15, 2019
Permit issued
Sep 12, 2019
Final sign-off
Feb 21, 2020
Declared cost
$65,000
Address
1635 Gough St

renov unit 302, 4/f: new kitchen, bedrooms, bathrooms, d/w, w/d, plmb fixtures. no change to mech. no ext work. no fa/sprinkler/structural

Open the permit page

$65,000
Mar 20, 2019Completed
final sign-off Oct 2019
1912 Mission St4th fl. unit 1918 renovation of unit 1918 new kitchen cabinets, new plumbing fixtures, new lighting at existing j-box locations, new washier dryer & dishwasher, one new bathroom, one new bedroom, no change to mech, no exterior work, no fisre alarm or sprinkler work, no structural
Details
Permit
201903205796
Status
complete
Filed
Mar 20, 2019
Permit issued
Apr 2, 2019
Final sign-off
Oct 15, 2019
Declared cost
$60,000
Address
1912 Mission St

4th fl. unit 1918 renovation of unit 1918 new kitchen cabinets, new plumbing fixtures, new lighting at existing j-box locations, new washier dryer & dishwasher, one new bathroom, one new bedroom, no change to mech, no exterior work, no fisre alarm or sprinkler work, no structural

Open the permit page

$60,000
Mar 5, 2019Completed
final sign-off May 2019
696 Valencia Stunit 1: all (n) lighting shall be high efficiency. remodel bathroom: (n) vanity w/ (n) sink fixture, (n) appiances. add (n) ventless combo washer/dryer in kithchen. add (n) dishwasher. remodel (e) closets @ bedrooms. bathroom 5x9 kitchen 10x10 with new organizer.
Details
Permit
201903054370
Status
complete
Filed
Mar 5, 2019
Permit issued
Mar 5, 2019
Final sign-off
May 17, 2019
Declared cost
$20,000
Address
696 Valencia St

unit 1: all (n) lighting shall be high efficiency. remodel bathroom: (n) vanity w/ (n) sink fixture, (n) appiances. add (n) ventless combo washer/dryer in kithchen. add (n) dishwasher. remodel (e) closets @ bedrooms. bathroom 5x9 kitchen 10x10 with new organizer.

Open the permit page

$20,000
Feb 13, 2019Never finaled
issued Mar 2019, no final
930 Post Stremodel of (5) units: #7 & 9 on 2/f; #18 on 3/f, #29 on 4/f & #34 on 5/f: add bedroom in each unit. add bathroom in #29. add washer/dryer & d/w in ea unit. (n) plumbing fuxtures,kitchen appliances, lighting & trim. no ext work. no strutural work. no f/a or f/s work. maher n/a.
Details
Permit
201902132861
Status
issued
Filed
Feb 13, 2019
Permit issued
Mar 28, 2019
Declared cost
$90,000
Address
930 Post St

remodel of (5) units: #7 & 9 on 2/f; #18 on 3/f, #29 on 4/f & #34 on 5/f: add bedroom in each unit. add bathroom in #29. add washer/dryer & d/w in ea unit. (n) plumbing fuxtures,kitchen appliances, lighting & trim. no ext work. no strutural work. no f/a or f/s work. maher n/a.

Open the permit page

$90,000
Jan 23, 2019Completed
final sign-off Mar 2019
65 Liberty Stunit # 407: remodel existing kitchen existing bathroom. no change to layout. upgrade electrical panel replace existing lighting. all work in unit 407 only.
Details
Permit
201901231025
Status
complete
Filed
Jan 23, 2019
Permit issued
Jan 23, 2019
Final sign-off
Mar 5, 2019
Declared cost
$36,000
Address
65 Liberty St

unit # 407: remodel existing kitchen existing bathroom. no change to layout. upgrade electrical panel replace existing lighting. all work in unit 407 only.

Open the permit page

$36,000
Jan 23, 2019Completed
final sign-off Mar 2019
300 Richland Avremodel existing kitchen existing bathroom. no change to layout. upgrade electrical panel existing laundry room.
Details
Permit
201901231026
Status
complete
Filed
Jan 23, 2019
Permit issued
Jan 23, 2019
Final sign-off
Mar 21, 2019
Declared cost
$44,000
Address
300 Richland Av

remodel existing kitchen existing bathroom. no change to layout. upgrade electrical panel existing laundry room.

Open the permit page

$44,000
Nov 1, 2018Completed
final sign-off Apr 2019
1342 Stevenson Stunit# 1342; renovation of appartment on 3rd fl. add dishwasher & washier/dryer, addition of (1) bedroom & (1) bathroom, new plumbing fixtures, new lighting, relocate of hot water heater, no change to mech. no exterior work, no fire alarm or sprinkler work, no structural work n/a maher
Details
Permit
201811014804
Status
complete
Filed
Nov 1, 2018
Permit issued
Nov 14, 2018
Final sign-off
Apr 30, 2019
Declared cost
$45,000
Address
1342 Stevenson St

unit# 1342; renovation of appartment on 3rd fl. add dishwasher & washier/dryer, addition of (1) bedroom & (1) bathroom, new plumbing fixtures, new lighting, relocate of hot water heater, no change to mech. no exterior work, no fire alarm or sprinkler work, no structural work n/a maher

Open the permit page

$45,000
Sep 13, 2018Completed
final sign-off Mar 2019
408 Austin Stunit remodel. add one new bedroom to extg living area. remodel bathrooms and kitchen. no change to mechanical /plmg. no structural work. no extgerior work. no fire alarm or sprinkler work
Details
Permit
201809130073
Status
complete
Filed
Sep 13, 2018
Permit issued
Oct 11, 2018
Final sign-off
Mar 21, 2019
Declared cost
$25,000
Address
408 Austin St

unit remodel. add one new bedroom to extg living area. remodel bathrooms and kitchen. no change to mechanical /plmg. no structural work. no extgerior work. no fire alarm or sprinkler work

Open the permit page

$25,000
Aug 7, 2018Completed
final sign-off Dec 2018
1591 Page Stunit 301: renovate e kitchen and bath, new plumbing fixtures, new lighting e j boxes, washer dryer, no change mech, exterior work, fire alarm, or layout
Details
Permit
201808076668
Status
complete
Filed
Aug 7, 2018
Permit issued
Aug 7, 2018
Final sign-off
Dec 27, 2018
Declared cost
$45,000
Address
1591 Page St

unit 301: renovate e kitchen and bath, new plumbing fixtures, new lighting e j boxes, washer dryer, no change mech, exterior work, fire alarm, or layout

Open the permit page

$45,000
May 24, 2018Completed
final sign-off Mar 2019
1912 Mission St2nd flr, unit 1914.5 - remodel kitchen and bathroom, plmb fixtures, (n) lighting, dishwasher, add 1 new half bath. no change to mech. no exterior work. no fire alarm or sprinkler work. no structural work.
Details
Permit
201805240067
Status
complete
Filed
May 24, 2018
Permit issued
Jun 8, 2018
Final sign-off
Mar 21, 2019
Declared cost
$45,137
Address
1912 Mission St

2nd flr, unit 1914.5 - remodel kitchen and bathroom, plmb fixtures, (n) lighting, dishwasher, add 1 new half bath. no change to mech. no exterior work. no fire alarm or sprinkler work. no structural work.

Open the permit page

$45,137
May 3, 2018Completed
final sign-off Aug 2022
1555 Chestnut Staddition of 3 (n) adu units per ord# 162-16. convert (e) garage space to (n) dwelling units within (e) envelope, (n) kitchens, bedrms, baths structural, plumbing & electrical. add dishwashers & washer/dryers. fire alarm & sprinkler under separate permit.
Details
Permit
201805038149
Status
complete
Filed
May 3, 2018
Permit issued
Jan 15, 2020
Final sign-off
Aug 2, 2022
Declared cost
$700,000
Address
1555 Chestnut St

addition of 3 (n) adu units per ord# 162-16. convert (e) garage space to (n) dwelling units within (e) envelope, (n) kitchens, bedrms, baths structural, plumbing & electrical. add dishwashers & washer/dryers. fire alarm & sprinkler under separate permit.

Open the permit page

$700,000
Apr 9, 2018Completed
final sign-off Jul 2018
1801 California Stunit# 403: renovate existing kitchen & bath, new lighting at existing boxes, no change to mechanical, no exterior work, no fire alarm, add washer & dryer. maher n/a
Details
Permit
201804095832
Status
complete
Filed
Apr 9, 2018
Permit issued
Apr 18, 2018
Final sign-off
Jul 31, 2018
Declared cost
$45,000
Address
1801 California St

unit# 403: renovate existing kitchen & bath, new lighting at existing boxes, no change to mechanical, no exterior work, no fire alarm, add washer & dryer. maher n/a

Open the permit page

$45,000
Jan 25, 2018Completed
final sign-off Jun 2018
4005 California Strenovate 1 apt unit 1, 2nd fl: convert closet to full bath, toilet rm to washer dryer, reconfigure kitchen/lr, add 3rd bedroom. new dishwasher, cabinets, plumbing, lighting, no change mech, fire alarm, or sprinkler. no structural
Details
Permit
201801259560
Status
complete
Filed
Jan 25, 2018
Permit issued
Feb 13, 2018
Final sign-off
Jun 22, 2018
Declared cost
$65,000
Address
4005 California St

renovate 1 apt unit 1, 2nd fl: convert closet to full bath, toilet rm to washer dryer, reconfigure kitchen/lr, add 3rd bedroom. new dishwasher, cabinets, plumbing, lighting, no change mech, fire alarm, or sprinkler. no structural

Open the permit page

$65,000
Jan 25, 2018Never finaled
issued Mar 2018, no final
1801 California Strenovation of 1 apt 406 5th fl: reconfigure kitchen, dining rm, add bedroom, remodel bath. new kitchen cabinets new lighting, plumbing. no change mech, no exterior no fire alarm
Details
Permit
201801259566
Status
issued
Filed
Jan 25, 2018
Permit issued
Mar 1, 2018
Declared cost
$65,000
Address
1801 California St

renovation of 1 apt 406 5th fl: reconfigure kitchen, dining rm, add bedroom, remodel bath. new kitchen cabinets new lighting, plumbing. no change mech, no exterior no fire alarm

Open the permit page

$65,000
Dec 28, 2017Completed
final sign-off Sep 2018
1338 Stevenson Stinterior renovation of units #c & d. adding 1 (n) bathroom, 1 (n) bedroom. (n) washer & dryer, (n) appliances, (n) dishwasher, (n) plumbing fixtures, (n) fixtures, (n) finishes & (n) lighting. no change to mech. no ext work. fire alarm & sprinkler work under sep permit. maher na
Details
Permit
201712287583
Status
complete
Filed
Dec 28, 2017
Permit issued
Jan 12, 2018
Final sign-off
Sep 7, 2018
Declared cost
$100,000
Address
1338 Stevenson St

interior renovation of units #c & d. adding 1 (n) bathroom, 1 (n) bedroom. (n) washer & dryer, (n) appliances, (n) dishwasher, (n) plumbing fixtures, (n) fixtures, (n) finishes & (n) lighting. no change to mech. no ext work. fire alarm & sprinkler work under sep permit. maher na

Open the permit page

$100,000
Oct 13, 2017Completed
final sign-off Aug 2020
104 Guerrero Stconvert(e) basement space to new dwelling units 7, 8, 9 within e envelope. new kitchen, baths, entry doors no work visible from street, new windows rear facade. no structural work. sprinkler to nfpa 13, full manual fire alarm for entire building under sep permit
Details
Permit
201710131207
Status
complete
Filed
Oct 13, 2017
Permit issued
Oct 12, 2018
Final sign-off
Aug 26, 2020
Declared cost
$150,000
Address
104 Guerrero St

convert(e) basement space to new dwelling units 7, 8, 9 within e envelope. new kitchen, baths, entry doors no work visible from street, new windows rear facade. no structural work. sprinkler to nfpa 13, full manual fire alarm for entire building under sep permit

Open the permit page

$150,000
Sep 7, 2017Completed
final sign-off Aug 2018
179 Dolores Stunit #9 on 4th floor - relocate kitchen & bathroom. new kitchen cabinets, new plumbing fixtures, new lighting, electrical & mechanical. no exterior work, no fire alarm or sprinkler work. ---- relocate kitchen & bathroom ---
Details
Permit
201709077237
Status
complete
Filed
Sep 7, 2017
Permit issued
Oct 5, 2017
Final sign-off
Aug 16, 2018
Declared cost
$85,000
Address
179 Dolores St

unit #9 on 4th floor - relocate kitchen & bathroom. new kitchen cabinets, new plumbing fixtures, new lighting, electrical & mechanical. no exterior work, no fire alarm or sprinkler work. ---- relocate kitchen & bathroom ---

Open the permit page

$85,000
Jun 22, 2017Completed
final sign-off Sep 2020
625 Guerrero Stconvert (e) basement space to (n) dwelling units per ord 162-16, within (e) envelope. (n) kitchen, baths & entry doors. (n) windows visible from street. no structural work- under separate permit. sprinkler & fire alarm under seperate app.
Details
Permit
201706220138
Status
complete
Filed
Jun 22, 2017
Permit issued
Oct 18, 2018
Final sign-off
Sep 21, 2020
Declared cost
$75,000
Address
625 Guerrero St

convert (e) basement space to (n) dwelling units per ord 162-16, within (e) envelope. (n) kitchen, baths & entry doors. (n) windows visible from street. no structural work- under separate permit. sprinkler & fire alarm under seperate app.

Open the permit page

$75,000
Apr 6, 2017Completed
final sign-off Oct 2017
1985 Fulton Stunits 102 and 103 renovations on 2nd flr. change layout from living room to new bedrooms. new kit appliances and cabinets, plm fixtures, lighting. addl new bath in unit 102, new washer and dryer in both units. no change to mech or exterior. fire and life safety under separate permits. maher na
Details
Permit
201704063388
Status
complete
Filed
Apr 6, 2017
Permit issued
Apr 13, 2017
Final sign-off
Oct 12, 2017
Declared cost
$95,000
Address
1985 Fulton St

units 102 and 103 renovations on 2nd flr. change layout from living room to new bedrooms. new kit appliances and cabinets, plm fixtures, lighting. addl new bath in unit 102, new washer and dryer in both units. no change to mech or exterior. fire and life safety under separate permits. maher na

Open the permit page

$95,000
Mar 30, 2017Completed
final sign-off Nov 2017
1916 Mission Stunit 1916.5, 3rd floor - work includes new finishes in kitchen, bathroom, bedrooms & common area . additional half bathroom. new washer dryer in unit. no mechanical or structural work.
Details
Permit
201703302842
Status
complete
Filed
Mar 30, 2017
Permit issued
Apr 13, 2017
Final sign-off
Nov 10, 2017
Declared cost
$60,000
Address
1916 Mission St

unit 1916.5, 3rd floor - work includes new finishes in kitchen, bathroom, bedrooms & common area . additional half bathroom. new washer dryer in unit. no mechanical or structural work.

Open the permit page

$60,000
Jan 11, 2017Completed
final sign-off Apr 2017
3350 21st Stremodel (e) bathroom & (e) kitchen. like for like. no changes to wall locations. no new walls.
Details
Permit
201701116989
Status
complete
Filed
Jan 11, 2017
Permit issued
Jan 11, 2017
Final sign-off
Apr 10, 2017
Declared cost
$30,000
Address
3350 21st St

remodel (e) bathroom & (e) kitchen. like for like. no changes to wall locations. no new walls.

Open the permit page

$30,000