Green Planet Construction
- Based in
- Alameda
- On San Francisco permits
- Aug 2016 to Sep 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 5 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2017 | Completed final sign-off Dec 2017 | 221 25th Av | fill in 2 windows in closet, convert 1st story storage to family rm, bath, spiral stair. connect upstairs and lower level with spiral stair. replace 3 windows in converted area w/min 0.32 vinyl windows. demolish non bearing walls 1st fl, remove elec baseboard heat and provide new gas furnaceDetails
fill in 2 windows in closet, convert 1st story storage to family rm, bath, spiral stair. connect upstairs and lower level with spiral stair. replace 3 windows in converted area w/min 0.32 vinyl windows. demolish non bearing walls 1st fl, remove elec baseboard heat and provide new gas furnace | $20,000 |