Back to kitchen remodel contractors
Green Planet Construction
- Based in
- Alameda
- On San Francisco permits
- Aug 2016 to Sep 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 1733 Page St | rev to 2017 0827 5433 - add kitchen remodel; no removal of walls.Details
rev to 2017 0827 5433 - add kitchen remodel; no removal of walls. | $15,000 |
| Aug 18, 2017 | Completed final sign-off Oct 2017 | 2063 20th Av | remodel bathroom per plan, kitchen remodel layout change relocation of plumbing, gas and electric.Details
remodel bathroom per plan, kitchen remodel layout change relocation of plumbing, gas and electric. | $18,000 |
| Jun 8, 2017 | Completed final sign-off Dec 2017 | 221 25th Av | replace 8 windows, relocate laundry, remodel bathroom, toilet rm, and kitchen. convert sunroom to closet & study. demo of non bearing walls & construction of non bearing interior partitions. window in kind replacement min u-factor .40Details
replace 8 windows, relocate laundry, remodel bathroom, toilet rm, and kitchen. convert sunroom to closet & study. demo of non bearing walls & construction of non bearing interior partitions. window in kind replacement min u-factor .40 | $25,000 |
| Apr 27, 2017 | Completed final sign-off Jul 2017 | 29 Cuvier St | kitchen and bathroom remodel, like for like. replace light fixtures, fan, appliances, install tiles.Details
kitchen and bathroom remodel, like for like. replace light fixtures, fan, appliances, install tiles. | $30,000 |
| Oct 14, 2016 | Completed final sign-off Jan 2017 | 1970 Sacramento St | apt #301: kitchen remodeling (like for like); bathroom remodeling (like for like).Details
apt #301: kitchen remodeling (like for like); bathroom remodeling (like for like). | $15,000 |
| Aug 29, 2016 | Completed final sign-off Nov 2016 | 361 Dellbrook Av | kitchen remodel - layout stays the same, adding 5 recessed lights in kitchen, 9 lights in living room, upgrade plumbing in working area. install cabinets. no change on wall.Details
kitchen remodel - layout stays the same, adding 5 recessed lights in kitchen, 9 lights in living room, upgrade plumbing in working area. install cabinets. no change on wall. | $15,000 |
| Aug 16, 2016 | Completed final sign-off Jul 2017 | 986 Somerset St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $20,000 |