Back to bathroom remodel contractors
Green Planet Construction
- Based in
- Alameda
- On San Francisco permits
- Aug 2016 to Sep 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2017 | Completed final sign-off Dec 2017 | 80 Henry St | 2 bathroom remodel. 1 is like for like, 2nd convert tub to shower, create shower pan, move elec plumbingDetails
2 bathroom remodel. 1 is like for like, 2nd convert tub to shower, create shower pan, move elec plumbing | $34,000 |
| Aug 18, 2017 | Completed final sign-off Oct 2017 | 2063 20th Av | remodel bathroom per plan, kitchen remodel layout change relocation of plumbing, gas and electric.Details
remodel bathroom per plan, kitchen remodel layout change relocation of plumbing, gas and electric. | $18,000 |
| Jul 25, 2017 | Completed final sign-off Jul 2018 | 82 Stanford Heights Av | remodel master bathroom. extend the bathroom by building a wall. install new shower pan, new tub, new vanity, one light, fan and tiles.Details
remodel master bathroom. extend the bathroom by building a wall. install new shower pan, new tub, new vanity, one light, fan and tiles. | $8,000 |
| Jul 14, 2017 | Completed final sign-off Aug 2017 | 2016 Pacific Av | replace tub fixtures, replace wall tile and floor tile, paint; bathroom remodelDetails
replace tub fixtures, replace wall tile and floor tile, paint; bathroom remodel | $9,000 |
| Jun 26, 2017 | Completed final sign-off Aug 2017 | 924 Corbett Av | bathroom remodel like for like in-kind at 2nd fl. no change to walls, doors or openings.Details
bathroom remodel like for like in-kind at 2nd fl. no change to walls, doors or openings. | $12,000 |
| Jun 22, 2017 | Completed final sign-off Dec 2017 | 221 25th Av | fill in 2 windows in closet, convert 1st story storage to family rm, bath, spiral stair. connect upstairs and lower level with spiral stair. replace 3 windows in converted area w/min 0.32 vinyl windows. demolish non bearing walls 1st fl, remove elec baseboard heat and provide new gas furnaceDetails
fill in 2 windows in closet, convert 1st story storage to family rm, bath, spiral stair. connect upstairs and lower level with spiral stair. replace 3 windows in converted area w/min 0.32 vinyl windows. demolish non bearing walls 1st fl, remove elec baseboard heat and provide new gas furnace | $20,000 |
| Jun 8, 2017 | Completed final sign-off Dec 2017 | 221 25th Av | replace 8 windows, relocate laundry, remodel bathroom, toilet rm, and kitchen. convert sunroom to closet & study. demo of non bearing walls & construction of non bearing interior partitions. window in kind replacement min u-factor .40Details
replace 8 windows, relocate laundry, remodel bathroom, toilet rm, and kitchen. convert sunroom to closet & study. demo of non bearing walls & construction of non bearing interior partitions. window in kind replacement min u-factor .40 | $25,000 |
| Apr 27, 2017 | Completed final sign-off Jul 2017 | 29 Cuvier St | kitchen and bathroom remodel, like for like. replace light fixtures, fan, appliances, install tiles.Details
kitchen and bathroom remodel, like for like. replace light fixtures, fan, appliances, install tiles. | $30,000 |
| Oct 14, 2016 | Completed final sign-off Jan 2017 | 1970 Sacramento St | apt #301: kitchen remodeling (like for like); bathroom remodeling (like for like).Details
apt #301: kitchen remodeling (like for like); bathroom remodeling (like for like). | $15,000 |
| Aug 16, 2016 | Completed final sign-off Jul 2017 | 986 Somerset St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $20,000 |