Green Planet Construction
- Based in
- Alameda
- On San Francisco permits
- Aug 2016 to Sep 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 expired or cancelled. Typically 16 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2017 | Expired or cancelled expired Nov 2023 | 347 Howth St | place new deck, door, dormer on backside of existing homeDetails
place new deck, door, dormer on backside of existing home | $20,000 |