Good Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Mar 2017
- Last 24 months
- 0 permits filed
49 permits since 2000: 40 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 2 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2013 | Completed final sign-off Jun 2015 | 319 Moultrie St | convert (e) attic to habitable space with a new bedroom, living room, two bathrooms & storage. expansion in dormers less than 8'x8' & less than 20% roof area. reconfigure (e) 1st & 2nd floors for new interior stair. reconfigure (e) kitchen, add new wet bar & laundry to first floor.Details
convert (e) attic to habitable space with a new bedroom, living room, two bathrooms & storage. expansion in dormers less than 8'x8' & less than 20% roof area. reconfigure (e) 1st & 2nd floors for new interior stair. reconfigure (e) kitchen, add new wet bar & laundry to first floor. | $123,000 |
| Jun 18, 2012 | Completed final sign-off Aug 2013 | 1685 Dolores St | reconfig. lower level and main level with relocated stair. convert existing unconditioned attic to new 3rd floor. new dormer, new family room space, balconies, baths and roof deck to thisDetails
reconfig. lower level and main level with relocated stair. convert existing unconditioned attic to new 3rd floor. new dormer, new family room space, balconies, baths and roof deck to this | $110,000 |
| Aug 8, 2011 | Completed final sign-off Feb 2012 | 200 Prentiss St | interior renovation: remodel 1 bathroom, add 1 bathroom, create a new bedroom @ 1st floor, replace all plumbing, electrical fixtures, remodel & relocate new kitchen. exterior work: add 2 new dormers w/windows @ attic, add 2 skylights, repair all dryrot at exterior stairs less than 50% in-kind.Details
interior renovation: remodel 1 bathroom, add 1 bathroom, create a new bedroom @ 1st floor, replace all plumbing, electrical fixtures, remodel & relocate new kitchen. exterior work: add 2 new dormers w/windows @ attic, add 2 skylights, repair all dryrot at exterior stairs less than 50% in-kind. | $75,000 |
| Aug 14, 2008 | Completed final sign-off Oct 2008 | 173 Parker Av | repair or replace 50% of back stairs. repair & replaces any dryrot or bad wood. in kind replacement.Details
repair or replace 50% of back stairs. repair & replaces any dryrot or bad wood. in kind replacement. | $8,000 |
| Aug 23, 2002 | Completed final sign-off Sep 2002 | 656 07th Av | to comply w/his n.o.v#200230329. repair of stairs at rear of bldg. about 20% of stair structure.Details
to comply w/his n.o.v#200230329. repair of stairs at rear of bldg. about 20% of stair structure. | $600 |