Back to kitchen remodel contractors
Good Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Mar 2017
- Last 24 months
- 0 permits filed
49 permits since 2000: 40 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 10 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2015 | Completed final sign-off Jan 2016 | 355 Valley St | kitchen remodel - new cabinets, counter, sink.Details
kitchen remodel - new cabinets, counter, sink. | $9,000 |
| Jan 6, 2015 | Expired or cancelled expired May 2019 | 4138 Fulton St | replacing kitchen cabinets @ 2 units wall cabinets only, no other work to be completed.Details
replacing kitchen cabinets @ 2 units wall cabinets only, no other work to be completed. | $10,000 |
| Jun 5, 2013 | Completed final sign-off Jun 2015 | 319 Moultrie St | convert (e) attic to habitable space with a new bedroom, living room, two bathrooms & storage. expansion in dormers less than 8'x8' & less than 20% roof area. reconfigure (e) 1st & 2nd floors for new interior stair. reconfigure (e) kitchen, add new wet bar & laundry to first floor.Details
convert (e) attic to habitable space with a new bedroom, living room, two bathrooms & storage. expansion in dormers less than 8'x8' & less than 20% roof area. reconfigure (e) 1st & 2nd floors for new interior stair. reconfigure (e) kitchen, add new wet bar & laundry to first floor. | $123,000 |
| Feb 13, 2013 | Completed final sign-off Jun 2013 | 566 Filbert St | interior remodel: reconfigure kitchen & powder room @ 1st floor, reconfigure bathroom, add washer/dryer @ 2nd floor, replace & reconfigure (e) rear exterior window in kind, no work visible from street.Details
interior remodel: reconfigure kitchen & powder room @ 1st floor, reconfigure bathroom, add washer/dryer @ 2nd floor, replace & reconfigure (e) rear exterior window in kind, no work visible from street. | $18,000 |
| Nov 13, 2012 | Completed final sign-off Jun 2013 | 1656 Sanchez St | interior remodel-adding lower level habitable space for entertainment area, re-configure 2nd fl kitchen, dining & powder room. 3rd fl-re-configure (e) bedrooms, baths & add new bath. new exterior deck, less than 10ft above grade included parapet with buildable areaDetails
interior remodel-adding lower level habitable space for entertainment area, re-configure 2nd fl kitchen, dining & powder room. 3rd fl-re-configure (e) bedrooms, baths & add new bath. new exterior deck, less than 10ft above grade included parapet with buildable area | $120,000 |
| Jun 27, 2012 | Completed final sign-off Aug 2013 | 1685 Dolores St | (1) kitchen and (2) baths remodelDetails
(1) kitchen and (2) baths remodel | $500 |
| Jan 31, 2012 | Never finaled issued Aug 2013, no final | 75 Rosenkranz St | comply with nov 201169854 dated 12/5/2011. remove kitchen and door into social room. add wetbar.Details
comply with nov 201169854 dated 12/5/2011. remove kitchen and door into social room. add wetbar. | $5,000 |
| Aug 8, 2011 | Completed final sign-off Feb 2012 | 200 Prentiss St | interior renovation: remodel 1 bathroom, add 1 bathroom, create a new bedroom @ 1st floor, replace all plumbing, electrical fixtures, remodel & relocate new kitchen. exterior work: add 2 new dormers w/windows @ attic, add 2 skylights, repair all dryrot at exterior stairs less than 50% in-kind.Details
interior renovation: remodel 1 bathroom, add 1 bathroom, create a new bedroom @ 1st floor, replace all plumbing, electrical fixtures, remodel & relocate new kitchen. exterior work: add 2 new dormers w/windows @ attic, add 2 skylights, repair all dryrot at exterior stairs less than 50% in-kind. | $75,000 |
| May 12, 2010 | Completed final sign-off Dec 2010 | 514 Russia Av | remodel bath and kitchen. move part of wall in kitchen and in closet.Details
remodel bath and kitchen. move part of wall in kitchen and in closet. | $30,000 |
| Apr 28, 2010 | Never finaled issued Apr 2010, no final | 130 Eureka St | unit #3: kitchen remodel, 8x7 room, new cabinets and counter top, new sink, use existing appliances, repl flooring, adding new outlets, new lighting, at least 50% high efficacy (by wattage)Details
unit #3: kitchen remodel, 8x7 room, new cabinets and counter top, new sink, use existing appliances, repl flooring, adding new outlets, new lighting, at least 50% high efficacy (by wattage) | $14,335 |
| Nov 12, 2009 | Completed final sign-off Jun 2010 | 130 Eureka St | replace 4 windows w/vinyl, repair dryrot @ deck wall & door to deck, replace kitchen cabinets, comply w/t-24 energy codes u-factor 0.67 max. all windows are @ back. (no front windows changed)Details
replace 4 windows w/vinyl, repair dryrot @ deck wall & door to deck, replace kitchen cabinets, comply w/t-24 energy codes u-factor 0.67 max. all windows are @ back. (no front windows changed) | $3,600 |
| Jun 3, 2008 | Completed final sign-off Jul 2008 | 49 Del Monte St | replace 11 windows w/ replacements vinyl double pane low e some at front (e), replace shower stall w/ fiberglass. remodel kitchen remodel. replace old plaster walls w/ 5/8 sheet rock in bthrm & some of kitchen. no structural.Details
replace 11 windows w/ replacements vinyl double pane low e some at front (e), replace shower stall w/ fiberglass. remodel kitchen remodel. replace old plaster walls w/ 5/8 sheet rock in bthrm & some of kitchen. no structural. | $12,000 |
| Nov 18, 2003 | Completed final sign-off May 2004 | 1362 42nd Av | demo 2 walls in kitchen,remove/install (e)cabinet.install 1 lambeam in place of wall.new sheetrockDetails
demo 2 walls in kitchen,remove/install (e)cabinet.install 1 lambeam in place of wall.new sheetrock | $4,980 |