Back to bathroom remodel contractors
Good Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Mar 2017
- Last 24 months
- 0 permits filed
49 permits since 2000: 40 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 15 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 4, 2013 | Completed final sign-off Jun 2014 | 801 Silver Av | handrail @ 6 bathrooms, 6 toilets, 6 shower to comply with ordinance 029-13 only.Details
handrail @ 6 bathrooms, 6 toilets, 6 shower to comply with ordinance 029-13 only. | $1,000 |
| Jun 5, 2013 | Completed final sign-off Jun 2015 | 319 Moultrie St | convert (e) attic to habitable space with a new bedroom, living room, two bathrooms & storage. expansion in dormers less than 8'x8' & less than 20% roof area. reconfigure (e) 1st & 2nd floors for new interior stair. reconfigure (e) kitchen, add new wet bar & laundry to first floor.Details
convert (e) attic to habitable space with a new bedroom, living room, two bathrooms & storage. expansion in dormers less than 8'x8' & less than 20% roof area. reconfigure (e) 1st & 2nd floors for new interior stair. reconfigure (e) kitchen, add new wet bar & laundry to first floor. | $123,000 |
| Feb 13, 2013 | Completed final sign-off Jun 2013 | 566 Filbert St | interior remodel: reconfigure kitchen & powder room @ 1st floor, reconfigure bathroom, add washer/dryer @ 2nd floor, replace & reconfigure (e) rear exterior window in kind, no work visible from street.Details
interior remodel: reconfigure kitchen & powder room @ 1st floor, reconfigure bathroom, add washer/dryer @ 2nd floor, replace & reconfigure (e) rear exterior window in kind, no work visible from street. | $18,000 |
| Nov 13, 2012 | Completed final sign-off Jun 2013 | 1656 Sanchez St | interior remodel-adding lower level habitable space for entertainment area, re-configure 2nd fl kitchen, dining & powder room. 3rd fl-re-configure (e) bedrooms, baths & add new bath. new exterior deck, less than 10ft above grade included parapet with buildable areaDetails
interior remodel-adding lower level habitable space for entertainment area, re-configure 2nd fl kitchen, dining & powder room. 3rd fl-re-configure (e) bedrooms, baths & add new bath. new exterior deck, less than 10ft above grade included parapet with buildable area | $120,000 |
| Jun 27, 2012 | Completed final sign-off Aug 2013 | 1685 Dolores St | (1) kitchen and (2) baths remodelDetails
(1) kitchen and (2) baths remodel | $500 |
| Jun 18, 2012 | Completed final sign-off Aug 2013 | 1685 Dolores St | reconfig. lower level and main level with relocated stair. convert existing unconditioned attic to new 3rd floor. new dormer, new family room space, balconies, baths and roof deck to thisDetails
reconfig. lower level and main level with relocated stair. convert existing unconditioned attic to new 3rd floor. new dormer, new family room space, balconies, baths and roof deck to this | $110,000 |
| Jan 27, 2012 | Completed final sign-off Jun 2012 | 20 Massasoit St | remove un-warranted unit @ ground floor & convert back to original use as a single fam. res. remodel bathroom @ ground floor; legalize construction, add (n) full bathroom @ second flr.Details
remove un-warranted unit @ ground floor & convert back to original use as a single fam. res. remodel bathroom @ ground floor; legalize construction, add (n) full bathroom @ second flr. | $35,000 |
| Dec 6, 2011 | Completed final sign-off Feb 2012 | 200 Prentiss St | rear structure -interior renovation of (e) accessary bldg, structure originally permitted as garage, current use is living space accessary to main house w/half bath. legalize use & replace all finishes & fixtures.Details
rear structure -interior renovation of (e) accessary bldg, structure originally permitted as garage, current use is living space accessary to main house w/half bath. legalize use & replace all finishes & fixtures. | $5,000 |
| Dec 2, 2011 | Completed final sign-off Feb 2012 | 200 Genebern Wy | add walls to create new full bath, gym rm, closet, foyer. add 5 interior doors, 1 exterior door, wet bar at gr floor denDetails
add walls to create new full bath, gym rm, closet, foyer. add 5 interior doors, 1 exterior door, wet bar at gr floor den | $15,000 |
| Aug 8, 2011 | Completed final sign-off Feb 2012 | 200 Prentiss St | interior renovation: remodel 1 bathroom, add 1 bathroom, create a new bedroom @ 1st floor, replace all plumbing, electrical fixtures, remodel & relocate new kitchen. exterior work: add 2 new dormers w/windows @ attic, add 2 skylights, repair all dryrot at exterior stairs less than 50% in-kind.Details
interior renovation: remodel 1 bathroom, add 1 bathroom, create a new bedroom @ 1st floor, replace all plumbing, electrical fixtures, remodel & relocate new kitchen. exterior work: add 2 new dormers w/windows @ attic, add 2 skylights, repair all dryrot at exterior stairs less than 50% in-kind. | $75,000 |
| Aug 31, 2010 | Completed final sign-off Nov 2010 | 40 Cortland Av | 2nd fl: remodel (e)bathroom, convert (e) closet to new powder rm, expand 3 existing closets at bedrooms. expand 2 doorways at dining area. garage arae: install new door to patio area, relocate door to storage areaDetails
2nd fl: remodel (e)bathroom, convert (e) closet to new powder rm, expand 3 existing closets at bedrooms. expand 2 doorways at dining area. garage arae: install new door to patio area, relocate door to storage area | $32,000 |
| May 12, 2010 | Completed final sign-off Dec 2010 | 514 Russia Av | remodel bath and kitchen. move part of wall in kitchen and in closet.Details
remodel bath and kitchen. move part of wall in kitchen and in closet. | $30,000 |
| May 5, 2010 | Expired or cancelled expired Apr 2016 | 130 Eureka St | unit #3:bath remodel 5x8. new floors, sink, toilet,tile, plmbg, electric, lighting. provide h.e. lightsDetails
unit #3:bath remodel 5x8. new floors, sink, toilet,tile, plmbg, electric, lighting. provide h.e. lights | $12,677 |
| Jan 29, 2010 | Completed final sign-off Jun 2010 | 130 Eureka St | bathroom remodel- upgrade elect. plumbing, insolation 5/8 x rated walls ( r 13) for exterior wall. no structural changes in unit #4 top floor. replace plmg fixtures and new lightingDetails
bathroom remodel- upgrade elect. plumbing, insolation 5/8 x rated walls ( r 13) for exterior wall. no structural changes in unit #4 top floor. replace plmg fixtures and new lighting | $5,000 |
| Jan 19, 2010 | Completed final sign-off Sep 2010 | 4336 17th St | first floor bathroom remodel. new plumbing and electrical upgrades. new studs, shower, toilet, sink, new firerated sheet rock 5/8 insulation, floor tile approx. 50 sqft.Details
first floor bathroom remodel. new plumbing and electrical upgrades. new studs, shower, toilet, sink, new firerated sheet rock 5/8 insulation, floor tile approx. 50 sqft. | $5,000 |
| Dec 22, 2009 | Completed final sign-off Jun 2010 | 130 Eureka St | remodel bathroom, repair dry rot, insulate, upgrade plumbing & electrical, provide high efficiancy lighting or manuel on occupancy sensor per t24.Details
remodel bathroom, repair dry rot, insulate, upgrade plumbing & electrical, provide high efficiancy lighting or manuel on occupancy sensor per t24. | $5,000 |