Good Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Mar 2017
- Last 24 months
- 0 permits filed
49 permits since 2000: 40 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 102 days from filing to permit and 320 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2012 | Completed final sign-off Aug 2013 | 1685 Dolores St | reconfig. lower level and main level with relocated stair. convert existing unconditioned attic to new 3rd floor. new dormer, new family room space, balconies, baths and roof deck to thisDetails
reconfig. lower level and main level with relocated stair. convert existing unconditioned attic to new 3rd floor. new dormer, new family room space, balconies, baths and roof deck to this | $110,000 |