Gleason & Tankard
- Based in
- Berkeley
- On San Francisco permits
- Jul 2004 to Sep 2017
- Last 24 months
- 0 permits filed
45 permits since 2000: 35 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 224 days from filing to permit and 894 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2013 | Completed final sign-off Jul 2017 | 1259 Bosworth St | kitchen & bath remodel throughout 3-story single family residence. enclose (e) 3rd fl roof deck. relocate (e) 3rd fl bath & modify roof @ location of (n) bath.Details
kitchen & bath remodel throughout 3-story single family residence. enclose (e) 3rd fl roof deck. relocate (e) 3rd fl bath & modify roof @ location of (n) bath. | $175,000 |
| Jan 6, 2011 | Completed final sign-off Oct 2012 | 3766 Clay St | garage level: remove & replace (e) wood siding & (e) garage doors. lower level: remove & replace (e) guardrail at front terrace & remove & replace (e) waterproof deck surfaceDetails
garage level: remove & replace (e) wood siding & (e) garage doors. lower level: remove & replace (e) guardrail at front terrace & remove & replace (e) waterproof deck surface | $50,000 |