Back to kitchen remodel contractors
Gleason & Tankard
- Based in
- Berkeley
- On San Francisco permits
- Jul 2004 to Sep 2017
- Last 24 months
- 0 permits filed
45 permits since 2000: 35 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 4 never finaled. Typically 8 days from filing to permit and 542 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2016 | Completed final sign-off Apr 2017 | 999 Green St | #1702: remodel kitchen and 3 baths, remove and relocate non load bearing partitions. enclose balcony with glass to match. no change in unit count or existing size.Details
#1702: remodel kitchen and 3 baths, remove and relocate non load bearing partitions. enclose balcony with glass to match. no change in unit count or existing size. | $300,000 |
| Dec 16, 2015 | Completed final sign-off Jun 2016 | 1543 Cole St | interior kitchen remodel. removal of one wall between kitchen and dining roomDetails
interior kitchen remodel. removal of one wall between kitchen and dining room | $75,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 999 Green St | remodel kitchen and 2 baths and relocate non load bearing partitions. enclosing the balcony with glass to matchDetails
remodel kitchen and 2 baths and relocate non load bearing partitions. enclosing the balcony with glass to match | $125,000 |
| Mar 5, 2013 | Completed final sign-off Jul 2017 | 1259 Bosworth St | kitchen & bath remodel throughout 3-story single family residence. enclose (e) 3rd fl roof deck. relocate (e) 3rd fl bath & modify roof @ location of (n) bath.Details
kitchen & bath remodel throughout 3-story single family residence. enclose (e) 3rd fl roof deck. relocate (e) 3rd fl bath & modify roof @ location of (n) bath. | $175,000 |
| Jun 21, 2012 | Never finaled issued Jan 2013, no final | 3660 Clay St | excavation of e garage for new garage space and stair access to residence. garage door to be widened and replaced. new railing at garage deck to match e entry rail. e kitchen to be demo and repalced in kind. replace e entry stair in kind. replace chain link fence with wood latticeDetails
excavation of e garage for new garage space and stair access to residence. garage door to be widened and replaced. new railing at garage deck to match e entry rail. e kitchen to be demo and repalced in kind. replace e entry stair in kind. replace chain link fence with wood lattice | $85,000 |
| Jan 18, 2011 | Completed final sign-off Mar 2013 | 490 Castenada Av | 3rd floor master bedroom addition. remodel (e) kitchen, dining, living & entry areas. replace & expand (e) stairwell. rear yard excavation.Details
3rd floor master bedroom addition. remodel (e) kitchen, dining, living & entry areas. replace & expand (e) stairwell. rear yard excavation. | $225,000 |
| Jun 23, 2010 | Completed final sign-off Jun 2013 | 15 18th Av | remove (e) elevator, add deck at 2nd floor, remodel front & rear elevation, add bay to front, renovate kitchen & bed room floors. add decking to roof in front.Details
remove (e) elevator, add deck at 2nd floor, remodel front & rear elevation, add bay to front, renovate kitchen & bed room floors. add decking to roof in front. | $400,000 |
| Jun 30, 2009 | Completed final sign-off Dec 2012 | 170 Pacific Av | unit 4 - replace existing kitchen cabinets, bath vanity, wet bar cabinet and counters.Details
unit 4 - replace existing kitchen cabinets, bath vanity, wet bar cabinet and counters. | $50,000 |
| Dec 20, 2007 | Completed final sign-off Aug 2008 | 1790 Vallejo St | unit #3- remodel of kitchen & two bathrooms, 5 new skylights, new direct vent gas fireplace. all work to be completed in unit 3 onlyDetails
unit #3- remodel of kitchen & two bathrooms, 5 new skylights, new direct vent gas fireplace. all work to be completed in unit 3 only | $200,000 |
| May 11, 2007 | Completed final sign-off Oct 2008 | 2208 Vallejo St | unit #3- revised structural design of opening between (e) kitchen and (e) family foom. revision to 200612089487. please correct 2006/12/08/9487 and any new permits: unit #3, lot #26Details
unit #3- revised structural design of opening between (e) kitchen and (e) family foom. revision to 200612089487. please correct 2006/12/08/9487 and any new permits: unit #3, lot #26 | |
| Apr 11, 2007 | Never finaled issued Apr 2007, no final | 2208 Vallejo St | additional toe kick heater at kitchenDetails
additional toe kick heater at kitchen | $1,500 |
| Mar 22, 2007 | Never finaled issued Mar 2007, no final | 2208 Vallejo St | additional electrical work as follows: underfloor electrical heat mats at master bath, master w.c., guest bath. addition of electrical heat at kitchen via toe kick/baseboard. (building permit for other work as already been issued.) work at unit #1Details
additional electrical work as follows: underfloor electrical heat mats at master bath, master w.c., guest bath. addition of electrical heat at kitchen via toe kick/baseboard. (building permit for other work as already been issued.) work at unit #1 | $5,000 |