Back to bathroom remodel contractors
Gleason & Tankard
- Based in
- Berkeley
- On San Francisco permits
- Jul 2004 to Sep 2017
- Last 24 months
- 0 permits filed
45 permits since 2000: 35 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 2 never finaled. Typically 6 days from filing to permit and 425 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2016 | Completed final sign-off Apr 2017 | 999 Green St | #1702: remodel kitchen and 3 baths, remove and relocate non load bearing partitions. enclose balcony with glass to match. no change in unit count or existing size.Details
#1702: remodel kitchen and 3 baths, remove and relocate non load bearing partitions. enclose balcony with glass to match. no change in unit count or existing size. | $300,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 999 Green St | remodel kitchen and 2 baths and relocate non load bearing partitions. enclosing the balcony with glass to matchDetails
remodel kitchen and 2 baths and relocate non load bearing partitions. enclosing the balcony with glass to match | $125,000 |
| Mar 5, 2013 | Completed final sign-off Jul 2017 | 1259 Bosworth St | kitchen & bath remodel throughout 3-story single family residence. enclose (e) 3rd fl roof deck. relocate (e) 3rd fl bath & modify roof @ location of (n) bath.Details
kitchen & bath remodel throughout 3-story single family residence. enclose (e) 3rd fl roof deck. relocate (e) 3rd fl bath & modify roof @ location of (n) bath. | $175,000 |
| Aug 1, 2011 | Completed final sign-off Oct 2012 | 3766 Clay St | new skylight at 1st fooor, convert basement storage into 1 bedroom & 1 bathroomDetails
new skylight at 1st fooor, convert basement storage into 1 bedroom & 1 bathroom | $50,000 |
| Jun 30, 2009 | Completed final sign-off Dec 2012 | 170 Pacific Av | unit 4 - replace existing kitchen cabinets, bath vanity, wet bar cabinet and counters.Details
unit 4 - replace existing kitchen cabinets, bath vanity, wet bar cabinet and counters. | $50,000 |
| Feb 20, 2008 | Completed final sign-off Oct 2010 | 40 Mclaren Av | 2nd floor. new bathroom & bedroom enlargement. entry level breakfast nook enlargement.Details
2nd floor. new bathroom & bedroom enlargement. entry level breakfast nook enlargement. | $1,100,000 |
| Jan 24, 2008 | Completed final sign-off Aug 2008 | 1790 Vallejo St | revision 200712200910, expand existing bathroom window in lightwell, not visible from the street. new window approx 18" x 5'-6".Details
revision 200712200910, expand existing bathroom window in lightwell, not visible from the street. new window approx 18" x 5'-6". | $2,500 |
| Dec 20, 2007 | Completed final sign-off Aug 2008 | 1790 Vallejo St | unit #3- remodel of kitchen & two bathrooms, 5 new skylights, new direct vent gas fireplace. all work to be completed in unit 3 onlyDetails
unit #3- remodel of kitchen & two bathrooms, 5 new skylights, new direct vent gas fireplace. all work to be completed in unit 3 only | $200,000 |
| Mar 22, 2007 | Never finaled issued Mar 2007, no final | 2208 Vallejo St | additional electrical work as follows: underfloor electrical heat mats at master bath, master w.c., guest bath. addition of electrical heat at kitchen via toe kick/baseboard. (building permit for other work as already been issued.) work at unit #1Details
additional electrical work as follows: underfloor electrical heat mats at master bath, master w.c., guest bath. addition of electrical heat at kitchen via toe kick/baseboard. (building permit for other work as already been issued.) work at unit #1 | $5,000 |