Gleason & Tankard
- Based in
- Berkeley
- On San Francisco permits
- Jul 2004 to Sep 2017
- Last 24 months
- 0 permits filed
45 permits since 2000: 35 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 never finaled. Typically 212 days from filing to permit and 864 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2012 | Never finaled issued Jan 2013, no final | 3660 Clay St | excavation of e garage for new garage space and stair access to residence. garage door to be widened and replaced. new railing at garage deck to match e entry rail. e kitchen to be demo and repalced in kind. replace e entry stair in kind. replace chain link fence with wood latticeDetails
excavation of e garage for new garage space and stair access to residence. garage door to be widened and replaced. new railing at garage deck to match e entry rail. e kitchen to be demo and repalced in kind. replace e entry stair in kind. replace chain link fence with wood lattice | $85,000 |
| Jun 23, 2010 | Completed final sign-off Jun 2013 | 15 18th Av | remove (e) elevator, add deck at 2nd floor, remodel front & rear elevation, add bay to front, renovate kitchen & bed room floors. add decking to roof in front.Details
remove (e) elevator, add deck at 2nd floor, remodel front & rear elevation, add bay to front, renovate kitchen & bed room floors. add decking to roof in front. | $400,000 |