Back to kitchen remodel contractors
Gartan Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Jul 2026
- Last 24 months
- 16 permits filed
34 permits since 2000: 23 completed, 6 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 9 completed, 3 in progress, 1 never finaled. Typically 2 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 43 Alvarado St | remodel kitchen and bathroom in kind. no moving walls. layout to remain the same. kitchen approx. 128 sq ft. bathroom approx. 40 sq ft.Details
remodel kitchen and bathroom in kind. no moving walls. layout to remain the same. kitchen approx. 128 sq ft. bathroom approx. 40 sq ft. | $35,000 |
| Jul 8, 2026 | Completed final sign-off Sep 2026 | 41 Alvarado St | kitchen remodel: demo/replace base cabinets, countertop & add back splash. replace sink & dishwasher in same location. bathroom remodel: demo tile & shower surround; new shower pan. demo floor tile and remove vanity & (e) toilet. replace in same location.Details
kitchen remodel: demo/replace base cabinets, countertop & add back splash. replace sink & dishwasher in same location. bathroom remodel: demo tile & shower surround; new shower pan. demo floor tile and remove vanity & (e) toilet. replace in same location. | $25,000 |
| Jan 28, 2026 | Completed final sign-off Oct 2026 | 32 West Portal Av | revision to pa 202509094918 changes include (n) janitor closet location; (n) wall 2 floral prep & (n) door to floral cooler; (n) pass thru @ kitchen, (n) guardrail detail * no struct. above entry, (n) sneeze guard awningDetails
revision to pa 202509094918 changes include (n) janitor closet location; (n) wall 2 floral prep & (n) door to floral cooler; (n) pass thru @ kitchen, (n) guardrail detail * no struct. above entry, (n) sneeze guard awning | |
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 240 Cervantes Bl | interior remodel of (e) residence. kitchen remodel in kind including demolition of (e) finishes, , and installation of new cabinets and island. remodel of powder room and two bathrooms including replacement of fixtures, shower, tile, and vanities in kind. new arched opening in (e) doorway.Details
interior remodel of (e) residence. kitchen remodel in kind including demolition of (e) finishes, , and installation of new cabinets and island. remodel of powder room and two bathrooms including replacement of fixtures, shower, tile, and vanities in kind. new arched opening in (e) doorway. | $15,000 |
| Dec 5, 2025 | Completed final sign-off Jun 2026 | 240 Cervantes Bl | 1st floor window replacement in kind in existing opening (at rear): demo stucco on the exterior and reflash the window to make water tight. drywall replacement in the interior wall and ceiling around the living room window , approx 320 sq ft., 5/8" type x. kitchen remodel in kind, approx. 100 sq ft.Details
1st floor window replacement in kind in existing opening (at rear): demo stucco on the exterior and reflash the window to make water tight. drywall replacement in the interior wall and ceiling around the living room window , approx 320 sq ft., 5/8" type x. kitchen remodel in kind, approx. 100 sq ft. | $8,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2026 | 32 West Portal Av | change of occupancy and use from retail to a coffee shop. t.i. w/ new windows, millwork, p.o.s. ada bath, kitchen, w/ walk-in cooler, triple sinks & floor sinks. guardrail & sneese guard at 2nd fl, electrical/lighting mech deferredDetails
change of occupancy and use from retail to a coffee shop. t.i. w/ new windows, millwork, p.o.s. ada bath, kitchen, w/ walk-in cooler, triple sinks & floor sinks. guardrail & sneese guard at 2nd fl, electrical/lighting mech deferred | $200,000 |
| Jun 30, 2025 | In progress issued Jun 2025 | 287 Hermann St | new bathroom 2 at existing 2nd floor with kitchen reconfiguration and new partion with door at existing 3rd fl loft.Details
new bathroom 2 at existing 2nd floor with kitchen reconfiguration and new partion with door at existing 3rd fl loft. | $100,000 |
| Feb 5, 2025 | Completed final sign-off Sep 2026 | 765 Market St | interior remodel of (e) living room (e) dining room, (e) kitchen (e) bathrooms, (e) entrance hall, (e) primary bedroom & primary bathroom , and walk-in closet at penthouse 2dDetails
interior remodel of (e) living room (e) dining room, (e) kitchen (e) bathrooms, (e) entrance hall, (e) primary bedroom & primary bathroom , and walk-in closet at penthouse 2d | $479,000 |
| May 14, 2024 | Completed final sign-off Aug 2024 | 227 Upper Tr | kitchen remodel: demo (e) kitchen. cap gas line in the (e) wall and replace gas stovetop. add ducted hood above electric stove. add new water line to refridgerator. sink and dishwasher to remain in (e) location. add new wall sconces adn outlets along kitchen backsplash. add new subpanel in hallway.Details
kitchen remodel: demo (e) kitchen. cap gas line in the (e) wall and replace gas stovetop. add ducted hood above electric stove. add new water line to refridgerator. sink and dishwasher to remain in (e) location. add new wall sconces adn outlets along kitchen backsplash. add new subpanel in hallway. | $40,000 |
| Feb 2, 2024 | In progress issued Feb 2024 | 470 Frederick St | apt#1 - like-kind repair for outdated (circa 1960) bathroom fixtures and finishes. like-kind repair for kitchen, moving one gas pipe to cabinet wall from empty wall.Details
apt#1 - like-kind repair for outdated (circa 1960) bathroom fixtures and finishes. like-kind repair for kitchen, moving one gas pipe to cabinet wall from empty wall. | $5,000 |
| Dec 10, 2021 | Completed final sign-off May 2023 | 650 De Haro St | replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric).Details
replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric). | $50,000 |
| Jan 23, 2020 | Never finaled issued Feb 2020, no final | 33 Buena Vista Tr | remodel of (e) dwelling unit #33 including kitchen remodel replacement of vanity sink & cab, replacement of tile @ bath & w/c, (n) opening @ (e) load bearing wall & replacement windows @ rear of bldgDetails
remodel of (e) dwelling unit #33 including kitchen remodel replacement of vanity sink & cab, replacement of tile @ bath & w/c, (n) opening @ (e) load bearing wall & replacement windows @ rear of bldg | $30,000 |
| Dec 19, 2019 | Completed final sign-off Jul 2020 | 260 Upper Tr | kitchen remodel - convert (e) closet to bar. remove (e) wood buring fireplace & replace w/(n) gas insert. remove & replace (e) skylight. structural upgrade to roof. repair extg windows. replace windows in kind only if required.Details
kitchen remodel - convert (e) closet to bar. remove (e) wood buring fireplace & replace w/(n) gas insert. remove & replace (e) skylight. structural upgrade to roof. repair extg windows. replace windows in kind only if required. | $100,000 |