Back to bathroom remodel contractors
Gartan Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Jul 2026
- Last 24 months
- 16 permits filed
34 permits since 2000: 23 completed, 6 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 7 completed, 4 in progress, 1 never finaled. Typically 2 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 43 Alvarado St | remodel kitchen and bathroom in kind. no moving walls. layout to remain the same. kitchen approx. 128 sq ft. bathroom approx. 40 sq ft.Details
remodel kitchen and bathroom in kind. no moving walls. layout to remain the same. kitchen approx. 128 sq ft. bathroom approx. 40 sq ft. | $35,000 |
| Jul 8, 2026 | Completed final sign-off Sep 2026 | 41 Alvarado St | kitchen remodel: demo/replace base cabinets, countertop & add back splash. replace sink & dishwasher in same location. bathroom remodel: demo tile & shower surround; new shower pan. demo floor tile and remove vanity & (e) toilet. replace in same location.Details
kitchen remodel: demo/replace base cabinets, countertop & add back splash. replace sink & dishwasher in same location. bathroom remodel: demo tile & shower surround; new shower pan. demo floor tile and remove vanity & (e) toilet. replace in same location. | $25,000 |
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 240 Cervantes Bl | interior remodel of (e) residence. kitchen remodel in kind including demolition of (e) finishes, , and installation of new cabinets and island. remodel of powder room and two bathrooms including replacement of fixtures, shower, tile, and vanities in kind. new arched opening in (e) doorway.Details
interior remodel of (e) residence. kitchen remodel in kind including demolition of (e) finishes, , and installation of new cabinets and island. remodel of powder room and two bathrooms including replacement of fixtures, shower, tile, and vanities in kind. new arched opening in (e) doorway. | $15,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2026 | 32 West Portal Av | change of occupancy and use from retail to a coffee shop. t.i. w/ new windows, millwork, p.o.s. ada bath, kitchen, w/ walk-in cooler, triple sinks & floor sinks. guardrail & sneese guard at 2nd fl, electrical/lighting mech deferredDetails
change of occupancy and use from retail to a coffee shop. t.i. w/ new windows, millwork, p.o.s. ada bath, kitchen, w/ walk-in cooler, triple sinks & floor sinks. guardrail & sneese guard at 2nd fl, electrical/lighting mech deferred | $200,000 |
| Sep 8, 2025 | In progress issued Sep 2025 | 2650 Union St | remodel 3 bathrooms in-kind. relocate plumbing for shower. waterproof and retile one bathrub. surround/retile (2) shower walls and floors.Details
remodel 3 bathrooms in-kind. relocate plumbing for shower. waterproof and retile one bathrub. surround/retile (2) shower walls and floors. | $70,000 |
| Jun 30, 2025 | In progress issued Jun 2025 | 287 Hermann St | new bathroom 2 at existing 2nd floor with kitchen reconfiguration and new partion with door at existing 3rd fl loft.Details
new bathroom 2 at existing 2nd floor with kitchen reconfiguration and new partion with door at existing 3rd fl loft. | $100,000 |
| Feb 5, 2025 | Completed final sign-off Sep 2026 | 765 Market St | interior remodel of (e) living room (e) dining room, (e) kitchen (e) bathrooms, (e) entrance hall, (e) primary bedroom & primary bathroom , and walk-in closet at penthouse 2dDetails
interior remodel of (e) living room (e) dining room, (e) kitchen (e) bathrooms, (e) entrance hall, (e) primary bedroom & primary bathroom , and walk-in closet at penthouse 2d | $479,000 |
| Feb 2, 2024 | In progress issued Feb 2024 | 470 Frederick St | apt#1 - like-kind repair for outdated (circa 1960) bathroom fixtures and finishes. like-kind repair for kitchen, moving one gas pipe to cabinet wall from empty wall.Details
apt#1 - like-kind repair for outdated (circa 1960) bathroom fixtures and finishes. like-kind repair for kitchen, moving one gas pipe to cabinet wall from empty wall. | $5,000 |
| Jun 29, 2022 | Completed final sign-off Mar 2023 | 2658 22nd St | addition of two windows at rear, adding 5 skylights, in kind replacement of some doors and windows, addition of bathroom, voluntary partial upgrade of (e) stairs, replacement of drywall, flooring, tile and upgrade of electrical and mechanical systems . no structural modifications.Details
addition of two windows at rear, adding 5 skylights, in kind replacement of some doors and windows, addition of bathroom, voluntary partial upgrade of (e) stairs, replacement of drywall, flooring, tile and upgrade of electrical and mechanical systems . no structural modifications. | $50,000 |
| Dec 10, 2021 | Completed final sign-off May 2023 | 650 De Haro St | replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric).Details
replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric). | $50,000 |
| Jan 23, 2020 | Never finaled issued Feb 2020, no final | 33 Buena Vista Tr | remodel of (e) dwelling unit #33 including kitchen remodel replacement of vanity sink & cab, replacement of tile @ bath & w/c, (n) opening @ (e) load bearing wall & replacement windows @ rear of bldgDetails
remodel of (e) dwelling unit #33 including kitchen remodel replacement of vanity sink & cab, replacement of tile @ bath & w/c, (n) opening @ (e) load bearing wall & replacement windows @ rear of bldg | $30,000 |
| Sep 26, 2019 | Completed final sign-off Jan 2020 | 523 Octavia St | replace plm fixtures on 3 bathrooms. paint all interior and exterior surfaces. replace carpeting throughout 1st & 2nd flr. replace shower pan, tile glass at (e) shower. demo enclosed stair and closet at 1st flr to create hallway connecting entryway to waiting roomDetails
replace plm fixtures on 3 bathrooms. paint all interior and exterior surfaces. replace carpeting throughout 1st & 2nd flr. replace shower pan, tile glass at (e) shower. demo enclosed stair and closet at 1st flr to create hallway connecting entryway to waiting room | $25,000 |