Gartan Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Jul 2026
- Last 24 months
- 16 permits filed
34 permits since 2000: 23 completed, 6 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 2 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2022 | Completed final sign-off Mar 2023 | 2658 22nd St | addition of two windows at rear, adding 5 skylights, in kind replacement of some doors and windows, addition of bathroom, voluntary partial upgrade of (e) stairs, replacement of drywall, flooring, tile and upgrade of electrical and mechanical systems . no structural modifications.Details
addition of two windows at rear, adding 5 skylights, in kind replacement of some doors and windows, addition of bathroom, voluntary partial upgrade of (e) stairs, replacement of drywall, flooring, tile and upgrade of electrical and mechanical systems . no structural modifications. | $50,000 |
| Sep 26, 2019 | Completed final sign-off Jan 2020 | 523 Octavia St | replace plm fixtures on 3 bathrooms. paint all interior and exterior surfaces. replace carpeting throughout 1st & 2nd flr. replace shower pan, tile glass at (e) shower. demo enclosed stair and closet at 1st flr to create hallway connecting entryway to waiting roomDetails
replace plm fixtures on 3 bathrooms. paint all interior and exterior surfaces. replace carpeting throughout 1st & 2nd flr. replace shower pan, tile glass at (e) shower. demo enclosed stair and closet at 1st flr to create hallway connecting entryway to waiting room | $25,000 |