Back to bathroom remodel contractors
G M M Construction Co
- Based in
- San Bruno
- On San Francisco permits
- Aug 2002 to Jun 2026
- Last 24 months
- 16 permits filed
210 permits since 2000: 136 completed, 5 in progress, 52 never finaled, 17 expired or cancelled.
Of the 52 never-finaled permits, 7 are 3 to 5 years old, 26 are 5 to 10 years old, 19 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
97 bathroom remodel permits: 64 completed, 3 in progress, 21 never finaled, 9 expired or cancelled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | Completed final sign-off Aug 2026 | 462 21st Av | remodel 1 (e) bathroom. fixtures in same location. no layout changes or structural work.Details
remodel 1 (e) bathroom. fixtures in same location. no layout changes or structural work. | $12,600 |
| May 19, 2026 | Completed final sign-off Sep 2026 | 1137 Lake St | front: remodel (e) kitchen bathroom. new electrical & plumbing fixtures.Details
front: remodel (e) kitchen bathroom. new electrical & plumbing fixtures. | $35,400 |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 2190 Washington St | apt 204: kitchen renovation: add plugs, new countertops, new sink, bathroom, new vanity top & new tiles, all work in-kind. no structural.Details
apt 204: kitchen renovation: add plugs, new countertops, new sink, bathroom, new vanity top & new tiles, all work in-kind. no structural. | $18,500 |
| Dec 17, 2025 | In progress issued Dec 2025 | 2190 Washington St | apt 707: remodel (e) kitchen - work in-kind with new fixtures.new electrical in kitchen & subpanel. new tile work only in (e) bathroom - new vanity only. no stuctural changes or layout changes.Details
apt 707: remodel (e) kitchen - work in-kind with new fixtures.new electrical in kitchen & subpanel. new tile work only in (e) bathroom - new vanity only. no stuctural changes or layout changes. | $36,500 |
| Oct 6, 2025 | Completed final sign-off Jan 2026 | 440 Arguello Bl | apt 6: remodel kitchen & bathroom. all fixtures in same location. new subpanel & all new electrical. no structural or layout changes. all work in kind. bathroom approx 40 sq ft. kitchen approx. 72 sq ft.Details
apt 6: remodel kitchen & bathroom. all fixtures in same location. new subpanel & all new electrical. no structural or layout changes. all work in kind. bathroom approx 40 sq ft. kitchen approx. 72 sq ft. | $32,500 |
| Aug 6, 2025 | In progress issued Aug 2025 | 2060 Pacific Av | apt 203: remodel apt including kitchen & bathroom. new electrical and plumbing fixtures in (e) locations. no structural work.Details
apt 203: remodel apt including kitchen & bathroom. new electrical and plumbing fixtures in (e) locations. no structural work. | $39,500 |
| Apr 22, 2025 | In progress issued Apr 2025 | 903 Fulton St | remodel bathroom and electrical in unit. fixtures to remain same location.Details
remodel bathroom and electrical in unit. fixtures to remain same location. | $15,200 |
| Apr 22, 2025 | Completed final sign-off Jan 2026 | 440 Arguello Bl | apt 4: remodel kitchen, bathroom and electrical in-unit. no layout changes or structural work.Details
apt 4: remodel kitchen, bathroom and electrical in-unit. no layout changes or structural work. | $25,600 |
| Jul 1, 2024 | Completed final sign-off Jan 2025 | 1234 Taylor St | unit 301: remodel (e) kitchen & 2 bathrooms and new subpanel and electrical in living room & bedroom. no walls changed - no structural work.remodel in-kindDetails
unit 301: remodel (e) kitchen & 2 bathrooms and new subpanel and electrical in living room & bedroom. no walls changed - no structural work.remodel in-kind | $42,700 |
| Feb 7, 2024 | Completed final sign-off Jul 2024 | 405 Clipper St | unit 4: remodel (e) 1 kitchen & 1 bathroom. no layout changes. no structural work. all work in-kind. no removal/mod of walls. new subpanel and new electrical in all apt.Details
unit 4: remodel (e) 1 kitchen & 1 bathroom. no layout changes. no structural work. all work in-kind. no removal/mod of walls. new subpanel and new electrical in all apt. | $41,600 |
| Nov 30, 2023 | Completed final sign-off May 2024 | 701 Parker Av | apt 103: remodel ktichen, bathroom, install washer/dryer & 1 (e) window in bathroom (same size & location). no layout changes or structural work. no wall or framign work/modification.Details
apt 103: remodel ktichen, bathroom, install washer/dryer & 1 (e) window in bathroom (same size & location). no layout changes or structural work. no wall or framign work/modification. | $38,400 |
| Aug 3, 2023 | Completed final sign-off Oct 2024 | 681 Arguello Bl | apt 2: remodel (e) 1 kitchen & 1 bathroom, all fixtures to remain in the same location. rewire apt. no structural work.Details
apt 2: remodel (e) 1 kitchen & 1 bathroom, all fixtures to remain in the same location. rewire apt. no structural work. | $39,600 |
| Feb 8, 2023 | Never finaled issued Feb 2023, no final | 2190 Washington St | apt 104: remodel (e) 1 kitchen and new fixturs all in same location. no structural work or wall/layout modifications. new vanity in bathroom only.Details
apt 104: remodel (e) 1 kitchen and new fixturs all in same location. no structural work or wall/layout modifications. new vanity in bathroom only. | $34,320 |
| Nov 29, 2022 | Completed final sign-off Feb 2023 | 2425 Larkin St | apt 2: partial kitchen: new counter tops, partial bathroom - new fixtures. new subppanel & wiring. all fixtures to remain in same location. no structural work.Details
apt 2: partial kitchen: new counter tops, partial bathroom - new fixtures. new subppanel & wiring. all fixtures to remain in same location. no structural work. | $18,300 |
| Oct 26, 2022 | Completed final sign-off Feb 2023 | 2028 Broderick St | apt a: remodel (e) kitchen & bathroom & laundry room: new tankless water heater, all work in-kind, layout remain same. no structural work. new subpanel & electrical.Details
apt a: remodel (e) kitchen & bathroom & laundry room: new tankless water heater, all work in-kind, layout remain same. no structural work. new subpanel & electrical. | $32,800 |
| Aug 24, 2022 | Completed final sign-off Nov 2022 | 2190 Washington St | apt 403: remodel 1 kitchen and 1 vanity in bathroom. all fixtures in same location. no structural work.Details
apt 403: remodel 1 kitchen and 1 vanity in bathroom. all fixtures in same location. no structural work. | $30,250 |
| Aug 24, 2022 | Completed final sign-off Mar 2023 | 455 07th Av | unit #4: remodel kitchen and bathroom (small) in-kind. rewire apt. no structural work.Details
unit #4: remodel kitchen and bathroom (small) in-kind. rewire apt. no structural work. | $32,000 |
| Jul 25, 2022 | Completed final sign-off Nov 2022 | 1382 05th Av | apt 4: remodel (e) 1 kitchen & 1 bathroom. new receptacles and subpanel.Details
apt 4: remodel (e) 1 kitchen & 1 bathroom. new receptacles and subpanel. | $32,500 |
| Apr 19, 2022 | Never finaled issued Apr 2022, no final | 2190 Washington St | apt 508: remodel 1 kitchen and 2 vanities in bathroom. all fixtures in same location. no structural work.Details
apt 508: remodel 1 kitchen and 2 vanities in bathroom. all fixtures in same location. no structural work. | $31,240 |
| Mar 11, 2022 | Completed final sign-off Sep 2022 | 1048 Union St | apt 2: remodel kitchen, 1 bathroom and partial remodel of the other bathroom.Details
apt 2: remodel kitchen, 1 bathroom and partial remodel of the other bathroom. | $34,100 |
| Mar 11, 2022 | Completed final sign-off Sep 2022 | 1048 Union St | apt 6: remodel kitchen & 1 bathroom.Details
apt 6: remodel kitchen & 1 bathroom. | $34,100 |
| Jan 6, 2022 | Completed final sign-off Mar 2022 | 2060 Pacific Av | apt 301: partial remodel of kitchen: repalce 3 cabinets & countertop; partial remodel bathroom: sink and tiles.Details
apt 301: partial remodel of kitchen: repalce 3 cabinets & countertop; partial remodel bathroom: sink and tiles. | $7,500 |
| Oct 28, 2021 | Completed final sign-off Feb 2022 | 121 Dolores St | apt 204: remodel 1 bathroom & replace kitchen countertop and box. replace 2 non-street facing windows. max u-factor 0.30 or better.Details
apt 204: remodel 1 bathroom & replace kitchen countertop and box. replace 2 non-street facing windows. max u-factor 0.30 or better. | $41,250 |
| May 13, 2021 | Completed final sign-off Jun 2021 | 2190 Washington St | apt 308: remodel kitchen and 2 vanities in bathrooms. all fixtures same location. no structural work.Details
apt 308: remodel kitchen and 2 vanities in bathrooms. all fixtures same location. no structural work. | $30,250 |
| Apr 8, 2021 | Never finaled issued Apr 2021, no final | 1382 05th Av | apt 1: remodel bathroom in-kind. no walls mofidication or layout changes. add receptacles in kitchen.Details
apt 1: remodel bathroom in-kind. no walls mofidication or layout changes. add receptacles in kitchen. | $18,200 |
| Apr 8, 2021 | Never finaled issued Apr 2021, no final | 750 Parnassus Av | apt 2: remodel bathroom in-kind. no walls modification or layout changes. add receptacles in kitchen.Details
apt 2: remodel bathroom in-kind. no walls modification or layout changes. add receptacles in kitchen. | $18,200 |
| Mar 23, 2021 | Completed final sign-off Jun 2021 | 1140 Vallejo St | amend to pa2002101253224 for additonal work: remodel (e) bathroom. existing layout remains unchanged.all work in-kind. no modification/alteration to any walls.Details
amend to pa2002101253224 for additonal work: remodel (e) bathroom. existing layout remains unchanged.all work in-kind. no modification/alteration to any walls. | $10,000 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 750 Parnassus Av | apt 4: remodel bathroom.Details
apt 4: remodel bathroom. | $18,200 |
| Jan 25, 2021 | Never finaled issued Jan 2021, no final | 2190 Washington St | apt 808: remodel kitchen and 2 vanities in bathrooms. all fixtures same location. no framing or structural work.Details
apt 808: remodel kitchen and 2 vanities in bathrooms. all fixtures same location. no framing or structural work. | $30,100 |
| Jan 25, 2021 | Never finaled issued Jan 2021, no final | 2190 Washington St | apt 1203: remodel kitchen and 2 vanities in bathrooms. all fixtures same location. no framing or structural work.Details
apt 1203: remodel kitchen and 2 vanities in bathrooms. all fixtures same location. no framing or structural work. | $32,200 |
| Jan 4, 2021 | Completed final sign-off Jul 2021 | 2060 Pacific Av | apt 202 - remodel bathroom & kitchen counter. fixturs in same location.Details
apt 202 - remodel bathroom & kitchen counter. fixturs in same location. | $26,350 |
| Aug 26, 2020 | Completed final sign-off Dec 2021 | 1221 Greenwich St | apt #2: remodel (e) kitchen & bathroom. new fixtures in same location. all work in-kind.Details
apt #2: remodel (e) kitchen & bathroom. new fixtures in same location. all work in-kind. | $32,700 |
| Aug 26, 2020 | Never finaled issued Aug 2020, no final | 1847 Clay St | apt #2: remodel (e) kitchen & bathroom. new fixtures in same location.Details
apt #2: remodel (e) kitchen & bathroom. new fixtures in same location. | $32,700 |
| Jun 9, 2020 | Completed final sign-off Nov 2020 | 3726 Broderick St | apartment #7: kitchen remodel: replace cabinets and countertops in-kind; bathroom remodel, fixtures to remain in same locationsDetails
apartment #7: kitchen remodel: replace cabinets and countertops in-kind; bathroom remodel, fixtures to remain in same locations | $35,500 |
| Mar 11, 2020 | Completed final sign-off Dec 2021 | 1221 Greenwich St | in unit: remodel (e) kitchen & bathroom in-kind, no layout changes. replace 2 windows on side of building (same size, non-street visible).Details
in unit: remodel (e) kitchen & bathroom in-kind, no layout changes. replace 2 windows on side of building (same size, non-street visible). | $31,000 |
| Dec 31, 2019 | Expired or cancelled expired Mar 2025 | 1048 Union St | apt 8: remodel ktichen & bathroom. new fixtures in same location. maher n/a.Details
apt 8: remodel ktichen & bathroom. new fixtures in same location. maher n/a. | $34,900 |
| Sep 6, 2019 | Completed final sign-off Nov 2019 | 681 Arguello Bl | unit 1: remodel small kitchen and bathroom - all fixtures same location.Details
unit 1: remodel small kitchen and bathroom - all fixtures same location. | $26,500 |
| Aug 1, 2019 | Never finaled issued Nov 2019, no final | 1674 Funston Av | comply w/ n.o.v # 201963441. remove (e) sink and wetbar in garage. legalize bathroom, rumpus room and storage area at ground flrDetails
comply w/ n.o.v # 201963441. remove (e) sink and wetbar in garage. legalize bathroom, rumpus room and storage area at ground flr | $15,000 |
| Jan 17, 2019 | Completed final sign-off Apr 2019 | 2095 Fulton St | remodel bathroom and change kitchen countertops. no wall moved, removed added or infilled. all existing layouts to remain unchanged.Details
remodel bathroom and change kitchen countertops. no wall moved, removed added or infilled. all existing layouts to remain unchanged. | $15,200 |
| Dec 28, 2018 | Never finaled issued Dec 2018, no final | 2095 Jackson St | unit # 201, remodel (6x10) kichen ( 5x7) guest bathroom & ( 5x7)master bathroomDetails
unit # 201, remodel (6x10) kichen ( 5x7) guest bathroom & ( 5x7)master bathroom | $32,500 |
| Nov 27, 2018 | Completed final sign-off Feb 2019 | 1845 Clay St | apt 2: remodel kitchen & bathroom - new fixtures in same locations. replace 3 windows in rear of building, in-kind, same size, max u-factor 0.32 or better.Details
apt 2: remodel kitchen & bathroom - new fixtures in same locations. replace 3 windows in rear of building, in-kind, same size, max u-factor 0.32 or better. | $25,500 |
| Nov 14, 2018 | Completed final sign-off Aug 2019 | 450 Gough St | office #b: new ada bathroom addition in 2nd fl southwest office space.work isonly to office space only. no changes to 3/f residential. maher n/a.Details
office #b: new ada bathroom addition in 2nd fl southwest office space.work isonly to office space only. no changes to 3/f residential. maher n/a. | $20,000 |
| Jul 31, 2018 | Never finaled issued Jul 2018, no final | 1610 Leavenworth St | unit 7: remodel (1) kitchen & (1) bathroomDetails
unit 7: remodel (1) kitchen & (1) bathroom | $38,500 |
| Apr 4, 2018 | Completed final sign-off Aug 2018 | 292 Ivy St | 2 ada bathroom additions on the 2nd floor. maher naDetails
2 ada bathroom additions on the 2nd floor. maher na | $25,000 |
| Feb 8, 2018 | Completed final sign-off Jul 2018 | 750 Parnassus Av | unit # 6 remodel kitchen & bathroom & 1/2 bath in same location no moving of walls or doors, install new furnace in same location new duct work less 40 duct lenght, all new light shall be ledDetails
unit # 6 remodel kitchen & bathroom & 1/2 bath in same location no moving of walls or doors, install new furnace in same location new duct work less 40 duct lenght, all new light shall be led | $60,000 |
| Oct 31, 2017 | Expired or cancelled expired Jan 2021 | 675 Corbett Av | #203 - remodel kitchen & bathroom, fixtures to remian same locations.Details
#203 - remodel kitchen & bathroom, fixtures to remian same locations. | $21,000 |
| May 30, 2017 | Never finaled issued May 2017, no final | 2190 Washington St | apt #1205 - remodel kitchen and two bathrooms; every fixture same location; no framing or structural.Details
apt #1205 - remodel kitchen and two bathrooms; every fixture same location; no framing or structural. | $18,000 |
| May 30, 2017 | Completed final sign-off Dec 2018 | 2095 Fulton St | #4 -remodel kitchen & bathroomDetails
#4 -remodel kitchen & bathroom | $31,500 |
| Mar 22, 2017 | Never finaled issued Mar 2017, no final | 1845 Clay St | unit #5: remodel kitchen & bathroom. fixtures same location. replace (5) windows in back.Details
unit #5: remodel kitchen & bathroom. fixtures same location. replace (5) windows in back. | $26,500 |
| Mar 17, 2017 | Never finaled issued Mar 2017, no final | 701 Parker Av | unit 203: remodel kitchen & bathroom: change (1) window in back, window same size/location, not visble from street, max u-factor 0.32Details
unit 203: remodel kitchen & bathroom: change (1) window in back, window same size/location, not visble from street, max u-factor 0.32 | $25,000 |
| Jan 6, 2017 | Completed final sign-off Mar 2017 | 750 Parnassus Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $32,500 |
| Aug 24, 2016 | Completed final sign-off Oct 2016 | 1610 Leavenworth St | apt 6: remodel kitchen & bathroom. replace two windows not visible to street. no structural. to copmly with complaint #201612421.Details
apt 6: remodel kitchen & bathroom. replace two windows not visible to street. no structural. to copmly with complaint #201612421. | $29,500 |
| May 31, 2016 | Never finaled issued May 2016, no final | 1845 Clay St | #3: remodel kitchen and bathroom. fixtures same locationDetails
#3: remodel kitchen and bathroom. fixtures same location | $22,000 |
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 1129 Stanyan St | unit #5: remodel bathroom and exchange fixtures and one piece of countertop in kitchen. all fixtures remain same location.Details
unit #5: remodel bathroom and exchange fixtures and one piece of countertop in kitchen. all fixtures remain same location. | $21,000 |
| Feb 17, 2016 | Completed final sign-off Apr 2016 | 1129 Stanyan St | apt 6: kitchen: new counter top, appliances and electrical. bathroom remodel: all fixtures remain same location.Details
apt 6: kitchen: new counter top, appliances and electrical. bathroom remodel: all fixtures remain same location. | $16,500 |
| Oct 27, 2015 | Never finaled issued Oct 2015, no final | 1847 Clay St | unit 5: remodel 2 bathrooms, kitchen counter tops, appliances and new wiring. replace two windows in back of building. no alteration of wall and door. u-factor 0.4 max.Details
unit 5: remodel 2 bathrooms, kitchen counter tops, appliances and new wiring. replace two windows in back of building. no alteration of wall and door. u-factor 0.4 max. | $28,200 |
| Sep 3, 2015 | Completed final sign-off Apr 2016 | 1610 Leavenworth St | remodel kitchen & bathroom. fixtures to reamin location. no walls moved, removed added or infilled. all (e) layouts to remain unchanged.Details
remodel kitchen & bathroom. fixtures to reamin location. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. | $15,500 |
| Jul 30, 2015 | Completed final sign-off Oct 2015 | 1845 Clay St | unit 3: kitchen & bathroom remodelDetails
unit 3: kitchen & bathroom remodel | $24,000 |
| Jul 9, 2015 | Expired or cancelled cancelled Feb 2024 | 210 Lake St | add garage to front yard 2 car into sloped property. add bathrooms to all 3 levels in rear yard. add rear deck to 2nd floor rear. ** maher: compliance with ordinancie no# 155-13 required; route to dph **Details
add garage to front yard 2 car into sloped property. add bathrooms to all 3 levels in rear yard. add rear deck to 2nd floor rear. ** maher: compliance with ordinancie no# 155-13 required; route to dph ** | $250,000 |
| Feb 27, 2015 | Completed final sign-off May 2016 | 1380 05th Av | remkodel kitchen & bathroom. one window replacement in kind not visible from street. no walls to be removed, no structural work. all fire resistance assemblies to be maintanedDetails
remkodel kitchen & bathroom. one window replacement in kind not visible from street. no walls to be removed, no structural work. all fire resistance assemblies to be maintaned | $25,000 |
| Feb 3, 2015 | Never finaled issued Feb 2015, no final | 2190 Washington St | unit # 1201: remodel kitchen and (2) bathrooms every fixture same location. no framing or structural (same location)Details
unit # 1201: remodel kitchen and (2) bathrooms every fixture same location. no framing or structural (same location) | $18,000 |
| Dec 16, 2014 | Completed final sign-off Dec 2014 | 279 Country Club Dr | revision of position of bathroom on existing plan appn. #201308225003Details
revision of position of bathroom on existing plan appn. #201308225003 | |
| Jul 22, 2014 | Completed final sign-off Oct 2014 | 701 Parker Av | no 303: remodel kitchen & bathroom all same fixture location, replace 1 window.Details
no 303: remodel kitchen & bathroom all same fixture location, replace 1 window. | $16,500 |
| Jul 22, 2014 | Never finaled issued Jul 2014, no final | 1610 Leavenworth St | unit 11: remodel one bathroom fixtures same location.Details
unit 11: remodel one bathroom fixtures same location. | $5,200 |
| Jul 22, 2014 | Completed final sign-off Oct 2014 | 440 Arguello Bl | unit 1: remodel kitchen & bathroom all same fixture location, replace 4 windows, max u factor 0.4 lighting to conform per code.Details
unit 1: remodel kitchen & bathroom all same fixture location, replace 4 windows, max u factor 0.4 lighting to conform per code. | $16,500 |
| May 13, 2014 | Completed final sign-off Oct 2014 | 440 Arguello Bl | remodel kitchen and bathroom with all same fixture location. replace three windows located in back. not visible from the street. max u-factor 0.4Details
remodel kitchen and bathroom with all same fixture location. replace three windows located in back. not visible from the street. max u-factor 0.4 | $18,277 |
| Mar 20, 2014 | Never finaled issued Mar 2014, no final | 1847 Clay St | unit 2 - kitchen & bath remodel , replace 7 windows u-factor not > .32Details
unit 2 - kitchen & bath remodel , replace 7 windows u-factor not > .32 | $24,000 |
| Nov 21, 2013 | Completed final sign-off Mar 2014 | 125 Dolores St | unit #2: remodel kitchen & bathroom, fixtures to remain same location, replace 3 windows not visible center lightwellsDetails
unit #2: remodel kitchen & bathroom, fixtures to remain same location, replace 3 windows not visible center lightwells | $27,500 |
| May 14, 2013 | Completed final sign-off Oct 2013 | 1135 Lake St | rear building -remodel kitchen & bathroom, change 5 windows. all windows in back. window u-factor 0.40 max. replace duct work.Details
rear building -remodel kitchen & bathroom, change 5 windows. all windows in back. window u-factor 0.40 max. replace duct work. | $18,500 |
| Apr 8, 2013 | Completed final sign-off Jun 2013 | 1519 Masonic Av | remodel kitchen & 1/2 bathroom. all fixtures to remain same position. no lighting change.Details
remodel kitchen & 1/2 bathroom. all fixtures to remain same position. no lighting change. | $15,000 |
| Mar 26, 2013 | Expired or cancelled expired Dec 2015 | 627 Haight St | #2- new sheetrock in bathroom ceiling & kitchen ceiling, room ceiling. new sheetrock some walls. replace 2 outlets and 2 lights. no wall removal & no new walls.Details
#2- new sheetrock in bathroom ceiling & kitchen ceiling, room ceiling. new sheetrock some walls. replace 2 outlets and 2 lights. no wall removal & no new walls. | $4,000 |
| Feb 14, 2013 | Completed final sign-off Apr 2013 | 1845 Clay St | remodel small kitchen & bathroom. all fixtures to remain same position. repalce three windows - back yard.Details
remodel small kitchen & bathroom. all fixtures to remain same position. repalce three windows - back yard. | $15,000 |
| Aug 27, 2012 | Completed final sign-off Dec 2012 | 1135 Lake St | kitchen & 2 bathroom remodel, replace 6 windows on side and back- all windows not visable from street.Details
kitchen & 2 bathroom remodel, replace 6 windows on side and back- all windows not visable from street. | $18,500 |
| Feb 24, 2012 | Completed final sign-off Dec 2012 | 1301 Lake St | remodel one bathroom, replace fixtures in kind, high efficacy or occupancy sensor lightDetails
remodel one bathroom, replace fixtures in kind, high efficacy or occupancy sensor light | $4,200 |
| Jun 20, 2011 | Expired or cancelled expired Jul 2012 | 1610 Leavenworth St | apt #10: remodel kitchen & bathroom, replace 3 windows 2 in the kitchen and 1 bathroom, no structural workDetails
apt #10: remodel kitchen & bathroom, replace 3 windows 2 in the kitchen and 1 bathroom, no structural work | $15,000 |
| Jun 14, 2011 | Completed final sign-off Mar 2012 | 1434 36th Av | remodel existing bathroom, add one new bathroom, relocate kitchen & convert (e) kitchen to study room. all work at second floor & install new skylights.Details
remodel existing bathroom, add one new bathroom, relocate kitchen & convert (e) kitchen to study room. all work at second floor & install new skylights. | $30,000 |
| Jun 14, 2011 | Completed final sign-off Mar 2012 | 1434 36th Av | repair/replace (e) interior stair from second down to ground floor. legalize & remodel (e) family room, bathroom. add new bedroom & storage room at ground floor. remove/replace (e) retaining wall w/new conc. rretaining wall at rear of bldg.Details
repair/replace (e) interior stair from second down to ground floor. legalize & remodel (e) family room, bathroom. add new bedroom & storage room at ground floor. remove/replace (e) retaining wall w/new conc. rretaining wall at rear of bldg. | $42,000 |
| Mar 2, 2011 | Completed final sign-off Oct 2011 | 26 Urbano Dr | 1. remodel one bathroom 2. remodel one kitchen. 3. add 1/2 bathroom, no change to lighting, no change to window, walls and door.Details
1. remodel one bathroom 2. remodel one kitchen. 3. add 1/2 bathroom, no change to lighting, no change to window, walls and door. | $22,500 |
| Mar 26, 2010 | Completed final sign-off Jul 2011 | 2515 Mcallister St | work @ unit# a & b. alteration of (e) 2-unit residential building. lowering of concrete slab @ 1st floor. approx 12". (n) private elevator to 3rd floor unit. alter bath #3 on 1st floor. (n) bath #2 on 2nd floor. remodel kitchen on 2nd floor. new bath on 3rd floor.Details
work @ unit# a & b. alteration of (e) 2-unit residential building. lowering of concrete slab @ 1st floor. approx 12". (n) private elevator to 3rd floor unit. alter bath #3 on 1st floor. (n) bath #2 on 2nd floor. remodel kitchen on 2nd floor. new bath on 3rd floor. | $180,000 |
| Mar 10, 2010 | Completed final sign-off Jul 2011 | 701 Parker Av | interior alterations and window replacement at secondary facades. renovate (e) unit# 106 into 2-bed/bath apartment. strip all wall of plaster & fixtures. (n) replacement windows @ unit #106.Details
interior alterations and window replacement at secondary facades. renovate (e) unit# 106 into 2-bed/bath apartment. strip all wall of plaster & fixtures. (n) replacement windows @ unit #106. | $20,000 |
| Nov 25, 2009 | Completed final sign-off Jan 2010 | 780 Guerrero St | in front change 5 wooden double hung. in kind. 3 new vinyle replacements in back with same. remodel bathroom. all fixtures same positions.Details
in front change 5 wooden double hung. in kind. 3 new vinyle replacements in back with same. remodel bathroom. all fixtures same positions. | $10,000 |
| Nov 5, 2009 | Completed final sign-off Jan 2010 | 3042 Octavia St | work on unit 3046 octavia only)- kitchen & 1/2 bath remodel: all fixtures to remain in same position. replace (2) windows in kitchen with white vinyl windows (u-factor 0.67 max.)facing backyardDetails
work on unit 3046 octavia only)- kitchen & 1/2 bath remodel: all fixtures to remain in same position. replace (2) windows in kitchen with white vinyl windows (u-factor 0.67 max.)facing backyard | $12,400 |
| Nov 5, 2009 | Completed final sign-off Dec 2009 | 2095 Fulton St | apt. # 3: remodel bathroom fixtures to remain in same position. add fan. no moving or add walls.Details
apt. # 3: remodel bathroom fixtures to remain in same position. add fan. no moving or add walls. | $4,200 |
| Mar 10, 2009 | Expired or cancelled expired Dec 2010 | 701 Parker Av | unit #305: install 5 cabinets in (kitchen) new sink and new shower pan (kitchen size: 7'x5' =35') replace shower pan only, no bathroom remodel min 50% light watts must be from fluorescent lightsDetails
unit #305: install 5 cabinets in (kitchen) new sink and new shower pan (kitchen size: 7'x5' =35') replace shower pan only, no bathroom remodel min 50% light watts must be from fluorescent lights | $12,325 |
| Jul 7, 2008 | Completed final sign-off Dec 2008 | 1875 California St | work on unit#2.kitchen remodel, bathroom remodel. no structural work (n) kitchen lighting fluorescent, (n) bath lighting by occ. sensor.Details
work on unit#2.kitchen remodel, bathroom remodel. no structural work (n) kitchen lighting fluorescent, (n) bath lighting by occ. sensor. | $12,500 |
| Mar 27, 2008 | Never finaled issued Mar 2008, no final | 2095 Fulton St | work @ unit# 2 only. bathroom remodel. small kitchen remodel. 3 cabinets only.Details
work @ unit# 2 only. bathroom remodel. small kitchen remodel. 3 cabinets only. | $9,000 |
| Feb 26, 2008 | Completed final sign-off Jun 2008 | 1124 Fulton St | bathroom remodel, no structural work. replace (2) toilets (1) urinal & (2) showers (in kind no structural work. new lighting to be flourescent or on occupant sensorDetails
bathroom remodel, no structural work. replace (2) toilets (1) urinal & (2) showers (in kind no structural work. new lighting to be flourescent or on occupant sensor | $12,500 |
| Dec 4, 2007 | Completed final sign-off Feb 2008 | 780 Guerrero St | replace (3) windows winyl. same size + location not facing street. remodel one bathroom.Details
replace (3) windows winyl. same size + location not facing street. remodel one bathroom. | $7,900 |
| Jul 9, 2007 | Completed final sign-off Oct 2007 | 3048 Octavia St | no structural work. remodel extg bathroom, replace 6 wndws. change kitchen counter tops. dryrot repair under back porch. 50% flouresent.Details
no structural work. remodel extg bathroom, replace 6 wndws. change kitchen counter tops. dryrot repair under back porch. 50% flouresent. | $9,500 |
| May 11, 2007 | Expired or cancelled expired Feb 2008 | 780 Guerrero St | apt. 10 - replace (e) dryrot windows (9) vinyl. same size & location. not facing street. remodel one small kitchen fixtures same location remodel one bathroom.Details
apt. 10 - replace (e) dryrot windows (9) vinyl. same size & location. not facing street. remodel one small kitchen fixtures same location remodel one bathroom. | $12,300 |
| Apr 20, 2007 | Completed final sign-off May 2007 | 1779 08th Av | remodel upstairs one bathroom. lighting to be flourescent or on occupant sensor.Details
remodel upstairs one bathroom. lighting to be flourescent or on occupant sensor. | $6,200 |
| Nov 16, 2006 | Expired or cancelled expired Feb 2008 | 365 30th Av | no structural work. remodel kitchen and 2 1/2 bathrooms. kitchen lighting wattage to be 50% fluorescant. bathroom lighting to be fluorescant or on occupant sensor.Details
no structural work. remodel kitchen and 2 1/2 bathrooms. kitchen lighting wattage to be 50% fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $28,500 |
| Nov 16, 2006 | Completed final sign-off Feb 2007 | 1045 Lake St | unit #7.remodle 1 kitchen and 1 bathroom. no structural work.kitchen lighting 50% of wattage fluorescant bathroom lighting fluorescant or cantrolled by occupant sensor.Details
unit #7.remodle 1 kitchen and 1 bathroom. no structural work.kitchen lighting 50% of wattage fluorescant bathroom lighting fluorescant or cantrolled by occupant sensor. | $15,600 |
| Jul 21, 2004 | Completed final sign-off Jan 2005 | 1045 Lake St | #6- remodel kitchen/bathroom,replace 12 windows,window visible from streetDetails
#6- remodel kitchen/bathroom,replace 12 windows,window visible from street | $25,600 |
| Apr 2, 2004 | Completed final sign-off Jun 2004 | 1045 Lake St | remodel kitchen/bath,replace (e) windows 8 in frontDetails
remodel kitchen/bath,replace (e) windows 8 in front | $14,500 |
| Mar 21, 2003 | Completed final sign-off Jun 2003 | 1045 Lake St | remodel kitchen and bath rm change 12 windows, 34 other windows are visible from streetDetails
remodel kitchen and bath rm change 12 windows, 34 other windows are visible from street | $15,500 |
| Aug 30, 2002 | Expired or cancelled expired Mar 2004 | 46 15th Av | remodel kitchen, add laundry hookup, provide 4" diam smooth duct to exhaust and bathroom no change iDetails
remodel kitchen, add laundry hookup, provide 4" diam smooth duct to exhaust and bathroom no change i | $28,000 |