Block 6555, lot 001
405 Clipper St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 5
- Rooms
- 4 bathrooms
- Building
- 5,106 sq ft
- Lot
- 2,117 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Oct 2026 | 405 Clipper St | G M M Construction Co | remodel apt 1: partial kitchen; bathroom fan. new electrical throughout apt. no layout changes. no structural work. all work in-kind.Details
remodel apt 1: partial kitchen; bathroom fan. new electrical throughout apt. no layout changes. no structural work. all work in-kind. | $36,900 |
| Feb 7, 2024 | Completed final sign-off Jul 2024 | 405 Clipper St | G M M Construction Co | unit 4: remodel (e) 1 kitchen & 1 bathroom. no layout changes. no structural work. all work in-kind. no removal/mod of walls. new subpanel and new electrical in all apt.Details
unit 4: remodel (e) 1 kitchen & 1 bathroom. no layout changes. no structural work. all work in-kind. no removal/mod of walls. new subpanel and new electrical in all apt. | $41,600 |
| Dec 30, 2022 | Completed final sign-off May 2025 | 405 Clipper St | Crime Watch Security Sys Llc | upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1.Details
upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1. | $9,600 |
| Oct 26, 2022 | Expired or cancelled cancelled Jan 2026 | 405 Clipper St | remodel of (e) retail space for the addition of a new ada bathroom & front entry.Details
remodel of (e) retail space for the addition of a new ada bathroom & front entry. | $40,000 | |
| Aug 14, 2014 | Completed final sign-off Nov 2014 | 405 Clipper St | New World General Construction | unit 2: remove kitchen chimney, repair ceiling & wall, replace kitchen cabinets & install floor tile, install 30" wall between the tub & toilet, install tile for bath walls & floor in bath, no structural work. kitchen 12'x10', bath 7'x8'.Details
unit 2: remove kitchen chimney, repair ceiling & wall, replace kitchen cabinets & install floor tile, install 30" wall between the tub & toilet, install tile for bath walls & floor in bath, no structural work. kitchen 12'x10', bath 7'x8'. | $16,000 |
| Jul 27, 2011 | Never finaled issued Jul 2011, no final | 1600 Castro St | street space & sidewalk | ||
| Aug 11, 2003 | Completed final sign-off Aug 2003 | 405 Clipper St | Mr. Roofing, Inc. | tear off fiberglass/add plysheet/new flashing/fiber glass cap sheetDetails
tear off fiberglass/add plysheet/new flashing/fiber glass cap sheet | $10,420 |
| Aug 1, 2001 | Completed final sign-off Sep 2001 | 405 Clipper St | Christopher Wren Construction | add reinforcement to crawl space area in front of new elect. meter as per/plansDetails
add reinforcement to crawl space area in front of new elect. meter as per/plans | $4,000 |
| Jul 3, 2001 | Completed final sign-off Sep 2001 | 405 Clipper St | Christopher Wren Construction | replace kitchen cabinets, sink, countertops, install gypsum in bathroom, install new wc, bathtubDetails
replace kitchen cabinets, sink, countertops, install gypsum in bathroom, install new wc, bathtub | $12,000 |
| Feb 22, 2001 | Completed final sign-off May 2001 | 1600 Castro St | rebuild existing wood stair in kind - no changes.Details
rebuild existing wood stair in kind - no changes. | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Christopher Wren Construction (2), G M M Construction Co (2), Crime Watch Security Sys Llc, Mr. Roofing, Inc., New World General Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.