G M M Construction Co
- Based in
- San Bruno
- On San Francisco permits
- Aug 2002 to Jun 2026
- Last 24 months
- 16 permits filed
210 permits since 2000: 136 completed, 5 in progress, 52 never finaled, 17 expired or cancelled.
Of the 52 never-finaled permits, 7 are 3 to 5 years old, 26 are 5 to 10 years old, 19 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 3 completed, 3 expired or cancelled. Typically 3 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2024 | Completed final sign-off Feb 2025 | 3642 16th St | common area: repair (e) backyard deck, less than 50%.Details
common area: repair (e) backyard deck, less than 50%. | $4,500 |
| Dec 30, 2022 | Completed final sign-off Feb 2023 | 1814 Filbert St | repair dry rot in front staircase, less than 50%, rear stairs less than 20%. no structural work: replace tread/steps and decking and wood hand rails as necessary. no structural work.Details
repair dry rot in front staircase, less than 50%, rear stairs less than 20%. no structural work: replace tread/steps and decking and wood hand rails as necessary. no structural work. | $4,850 |
| Jul 9, 2015 | Expired or cancelled cancelled Feb 2024 | 210 Lake St | add garage to front yard 2 car into sloped property. add bathrooms to all 3 levels in rear yard. add rear deck to 2nd floor rear. ** maher: compliance with ordinancie no# 155-13 required; route to dph **Details
add garage to front yard 2 car into sloped property. add bathrooms to all 3 levels in rear yard. add rear deck to 2nd floor rear. ** maher: compliance with ordinancie no# 155-13 required; route to dph ** | $250,000 |
| Nov 4, 2014 | Expired or cancelled expired Nov 2016 | 1814 Filbert St | move front deck post about 1 ft to provide driveway added space.Details
move front deck post about 1 ft to provide driveway added space. | $1,000 |
| Oct 10, 2008 | Completed final sign-off Jan 2009 | 915 Burnett Av | work on unit#2 & #3.replace 3 aluminum sliding door with vinyl. replace 1 window with vinyl. replace decking on two balconies less than 50% of feck. no structural work. not visible from street. to comply with nov#200874816.Details
work on unit#2 & #3.replace 3 aluminum sliding door with vinyl. replace 1 window with vinyl. replace decking on two balconies less than 50% of feck. no structural work. not visible from street. to comply with nov#200874816. | $5,000 |
| Aug 18, 2005 | Expired or cancelled expired Sep 2006 | 2948 Octavia St | add exterior deck at upper level unit & replace 1window with 1 door at rear elevation.Details
add exterior deck at upper level unit & replace 1window with 1 door at rear elevation. | $3,000 |