Block 1372, lot 045
1135 Lake St
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 2
- Units
- 2
- Rooms
- 4 bathrooms
- Building
- 3,818 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2026 | Completed final sign-off Sep 2026 | 1135 Lake St | G M M Construction Co | new electrical throughout: new wire & fixtures. new sheetrock/insulation/tape. replace toilet & kitchen fixtures.Details
new electrical throughout: new wire & fixtures. new sheetrock/insulation/tape. replace toilet & kitchen fixtures. | $18,600 |
| May 19, 2026 | Completed final sign-off Sep 2026 | 1137 Lake St | G M M Construction Co | front: remodel (e) kitchen bathroom. new electrical & plumbing fixtures.Details
front: remodel (e) kitchen bathroom. new electrical & plumbing fixtures. | $35,400 |
| May 2, 2025 | Completed final sign-off May 2025 | 1135 Lake St | High Quality Roofing Co | administrative permit to correct the location of of the reroofing work under pa#202504174662 from "rear bldg" to "front bldg". no work will be done for rear bldg roof.Details
administrative permit to correct the location of of the reroofing work under pa#202504174662 from "rear bldg" to "front bldg". no work will be done for rear bldg roof. | |
| Apr 17, 2025 | Completed final sign-off May 2025 | 1135 Lake St | High Quality Roofing Co | rear building - reroof, no hot workDetails
rear building - reroof, no hot work | $23,000 |
| May 14, 2013 | Completed final sign-off Oct 2013 | 1135 Lake St | G M M Construction Co | rear building -remodel kitchen & bathroom, change 5 windows. all windows in back. window u-factor 0.40 max. replace duct work.Details
rear building -remodel kitchen & bathroom, change 5 windows. all windows in back. window u-factor 0.40 max. replace duct work. | $18,500 |
| Nov 21, 2012 | Completed final sign-off Dec 2012 | 1135 Lake St | Schmitt Heating Co Inc | replace 2 existing forced air furnaces. with 2 new 80% efficient furnaces and install all new steel ductwork in garage,.Details
replace 2 existing forced air furnaces. with 2 new 80% efficient furnaces and install all new steel ductwork in garage,. | $9,550 |
| Aug 27, 2012 | Completed final sign-off Dec 2012 | 1135 Lake St | G M M Construction Co | kitchen & 2 bathroom remodel, replace 6 windows on side and back- all windows not visable from street.Details
kitchen & 2 bathroom remodel, replace 6 windows on side and back- all windows not visable from street. | $18,500 |
| Mar 23, 2012 | Expired or cancelled cancelled Jan 2026 | 1135 Lake St | partial demolition:remove kitchen sink, water supply sewer drain, countertops and cabinets.Details
partial demolition:remove kitchen sink, water supply sewer drain, countertops and cabinets. | $500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- G M M Construction Co (4), High Quality Roofing Co (2), Schmitt Heating Co Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.