G B U Construction Development

Contractor license
1052737
State license record
Based in
San Francisco
On San Francisco permits
Dec 2014 to Jul 2026
Last 24 months
15 permits filed

101 permits since 2000: 70 completed, 7 in progress, 16 never finaled, 8 expired or cancelled.

Of the 16 never-finaled permits, 9 are 3 to 5 years old, 7 are 5 to 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Roof deck permits

AllRoof deck 7Deck 8Stairs 10Kitchen remodel 26Bathroom remodel 41

7 roof deck permits: 2 completed, 2 in progress, 3 never finaled. Typically 578 days from filing to permit and 384 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 17, 2026In progress
issued Apr 2026
1260 Sacramento Strevision to pa #201801269701: revision of rear exterior stair on 1260 sacramento street from 3rd floor to roof deck. approved spiral stair to be removed. approved staight run stair to be includes in scope.
Details
Permit
202602176062
Status
issued
Filed
Feb 17, 2026
Permit issued
Apr 16, 2026
Address
1260 Sacramento St

revision to pa #201801269701: revision of rear exterior stair on 1260 sacramento street from 3rd floor to roof deck. approved spiral stair to be removed. approved staight run stair to be includes in scope.

Open the permit page

Nov 21, 2023In progress
issued Aug 2024
6 San Pablo Avaltered site permit. revision to bpa#2022-0805-0034 related to variance case 2022-007994var. proposed stairs, landing and roof deck at rear, plus additional interior alterations and additional exterior facade changes.
Details
Permit
202311211249
Status
issued
Filed
Nov 21, 2023
Permit issued
Aug 13, 2024
Declared cost
$5,000
Address
6 San Pablo Av

altered site permit. revision to bpa#2022-0805-0034 related to variance case 2022-007994var. proposed stairs, landing and roof deck at rear, plus additional interior alterations and additional exterior facade changes.

Open the permit page

$5,000
Mar 17, 2022Completed
final sign-off May 2022
1020 Francisco Streplace existing roof top decking like for like. less than 500sf. if over 500sf, wood cannot be used per sfbc section 1510.10.
Details
Permit
202203170206
Status
complete
Filed
Mar 17, 2022
Permit issued
Mar 17, 2022
Final sign-off
May 6, 2022
Declared cost
$20,000
Address
1020 Francisco St

replace existing roof top decking like for like. less than 500sf. if over 500sf, wood cannot be used per sfbc section 1510.10.

Open the permit page

$20,000
Feb 3, 2020Never finaled
issued Jul 2022, no final
2814 Clay Strear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck.
Details
Permit
202002033400
Status
issued
Filed
Feb 3, 2020
Permit issued
Jul 11, 2022
Declared cost
$500,000
Address
2814 Clay St

rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck.

Open the permit page

$500,000
Mar 15, 2019Never finaled
filed Mar 2019, never issued
836 Lyon Ststruct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system.
Details
Permit
201903155433
Status
plancheck
Filed
Mar 15, 2019
Declared cost
$45,000
Address
836 Lyon St

struct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system.

Open the permit page

$45,000
Jan 26, 2018Never finaled
issued Sep 2021, no final
1260 Sacramento Strenovate (e) 2-story single family residence. interior remodel of (e). vertical addition of 3rd flr & roof deck. (n) design-build fire sprinkler system per nfpa-13r under separate permit.
Details
Permit
201801269701
Status
issued
Filed
Jan 26, 2018
Permit issued
Sep 13, 2021
Declared cost
$732,955
Address
1260 Sacramento St

renovate (e) 2-story single family residence. interior remodel of (e). vertical addition of 3rd flr & roof deck. (n) design-build fire sprinkler system per nfpa-13r under separate permit.

Open the permit page

$732,955
Aug 7, 2015Completed
final sign-off Aug 2021
943 York St2 story addition (2nd unit)2800 sf. 3rd level=1380 sf, 4th level 1420 sf. 6 bedrooms. deck & stairs. (200 sf). roof deck 420 sf with 13r sprinkler system throughout entire bldg. new entry and interior stairs.
Details
Permit
201508073719
Status
complete
Filed
Aug 7, 2015
Permit issued
Sep 5, 2019
Final sign-off
Aug 23, 2021
Declared cost
$200,000
Address
943 York St

2 story addition (2nd unit)2800 sf. 3rd level=1380 sf, 4th level 1420 sf. 6 bedrooms. deck & stairs. (200 sf). roof deck 420 sf with 13r sprinkler system throughout entire bldg. new entry and interior stairs.

Open the permit page

$200,000