Permit GraphShortlistSan Francisco building permits since 2000

G B U Construction Development

Contractor license
1052737
State license record
Based in
San Francisco
On San Francisco permits
Dec 2014 to Oct 2026
Last 24 months
16 permits filed

103 permits since 2000: 70 completed, 8 in progress, 17 never finaled, 8 expired or cancelled.

Of the 17 never-finaled permits, 10 are 3 to 5 years old, 7 are 5 to 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Deck permits

AllRoof deck 7Deck 8Stairs 10Kitchen remodel 27Bathroom remodel 41

8 deck permits: 5 completed, 2 never finaled, 1 expired or cancelled. Typically 127 days from filing to permit and 342 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 26, 2024Expired or cancelled
expired Jul 2026
1235 08th Avper ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage.
Details
Permit
202411054420
Permit issued
Apr 14, 2025

per ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage.

Open the permit page

$50,000
Aug 18, 2022Completed
final sign-off Sep 2022
732 Francisco Stback deck repair less than 50%
Details
Permit
202208180789
Permit issued
Aug 18, 2022
Final sign-off
Sep 2, 2022

back deck repair less than 50%

Open the permit page

$15,000
Mar 24, 2022Completed
final sign-off Sep 2022
734 Francisco Strepair deck like for like 49%
Details
Permit
202203240792
Permit issued
Jul 29, 2022
Final sign-off
Sep 2, 2022

repair deck like for like 49%

Open the permit page

$15,000
Feb 4, 2022Completed
final sign-off Dec 2024
1626 31st Av1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen.
Details
Permit
202202047356
Permit issued
Feb 11, 2022
Final sign-off
Dec 13, 2024

1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen.

Open the permit page

$22,000
Feb 4, 2021Never finaled
issued Oct 2022, no final
1558 Shafter Avnew deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall.
Details
Permit
202102044057
Permit issued
Oct 24, 2022

new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall.

Open the permit page

$200,000
Nov 17, 2020Completed
final sign-off Sep 2022
501 Thornton Avconvert lower level to adu. remodel kitchen in main unit. remove walls in main unit. all new windows in main unit. new rear deck.
Details
Permit
202011179019
Permit issued
Jun 16, 2021
Final sign-off
Sep 6, 2022

convert lower level to adu. remodel kitchen in main unit. remove walls in main unit. all new windows in main unit. new rear deck.

Open the permit page

$180,000
Sep 23, 2019Completed
final sign-off Oct 2020
22 Gaviota Wykitchen complete rmeodel, removing a wall, rewire the entire houseupgrade 100 to 200amp panel box main and sub. replacing sliding door in backyard like for like. deck repair like for like, less than 50%. remodel laundry room.
Details
Permit
201909232348
Permit issued
Oct 31, 2019
Final sign-off
Oct 7, 2020

kitchen complete rmeodel, removing a wall, rewire the entire houseupgrade 100 to 200amp panel box main and sub. replacing sliding door in backyard like for like. deck repair like for like, less than 50%. remodel laundry room.

Open the permit page

$20,000
Mar 15, 2019Never finaled
filed Mar 2019, never issued
836 Lyon Ststruct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system.
Details
Permit
201903155433

struct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system.

Open the permit page

$45,000