Back to kitchen remodel contractors
G B U Construction Development
- Based in
- San Francisco
- On San Francisco permits
- Dec 2014 to Jul 2026
- Last 24 months
- 15 permits filed
101 permits since 2000: 70 completed, 7 in progress, 16 never finaled, 8 expired or cancelled.
Of the 16 never-finaled permits, 9 are 3 to 5 years old, 7 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 18 completed, 1 in progress, 6 never finaled, 1 expired or cancelled. Typically 13 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 457 12th Av | kitchen & bathroom remodel, like for like.Details
kitchen & bathroom remodel, like for like. | $40,000 |
| Jul 9, 2025 | Completed final sign-off Dec 2025 | 1758 32nd Av | kitchen remodel with load bearing wall removal. bathroom remodelDetails
kitchen remodel with load bearing wall removal. bathroom remodel | $70,000 |
| Nov 26, 2024 | Expired or cancelled expired Jul 2026 | 1235 08th Av | per ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage.Details
per ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage. | $50,000 |
| Jul 25, 2024 | Completed final sign-off Nov 2024 | 90 Mountain Spring Av | one kitchen remodel and 2 bathroom remodel. non-structural, sub and main panel upgradeDetails
one kitchen remodel and 2 bathroom remodel. non-structural, sub and main panel upgrade | $40,000 |
| Apr 18, 2024 | Completed final sign-off Jul 2024 | 30 Otsego Av | opening kitchen wall (b/t kitchen and living room) keeping existing beamDetails
opening kitchen wall (b/t kitchen and living room) keeping existing beam | $10,000 |
| Mar 7, 2023 | Completed final sign-off Jan 2024 | 2200 Sacramento St | one kitchen remodel like for like. one bathroom remodel like for like, no shower pan. one bathroom remodel like for like, shower pan. one laundry room like for like. no walls or layout change.Details
one kitchen remodel like for like. one bathroom remodel like for like, no shower pan. one bathroom remodel like for like, shower pan. one laundry room like for like. no walls or layout change. | $50,000 |
| Jan 5, 2023 | Completed final sign-off May 2024 | 1741 16th Av | remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work.Details
remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work. | $25,000 |
| May 13, 2022 | Never finaled issued Jul 2022, no final | 1927 Ulloa St | relocate kitchen, closes two windows (interior) in the bathrooms. flip stairs in the same location and enclose this area. add a laundry room upstairs. add a skylight in kitchen and stairs.Details
relocate kitchen, closes two windows (interior) in the bathrooms. flip stairs in the same location and enclose this area. add a laundry room upstairs. add a skylight in kitchen and stairs. | $80,000 |
| Feb 4, 2022 | Completed final sign-off Dec 2024 | 1626 31st Av | 1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen.Details
1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen. | $22,000 |
| Dec 28, 2021 | Completed final sign-off Oct 2022 | 1670 31st Av | remodel (e) bathroom/closet into 2 bathrooms, (e) kitchen, provide egress hall and storage at (e) ground level. remove interior stair.Details
remodel (e) bathroom/closet into 2 bathrooms, (e) kitchen, provide egress hall and storage at (e) ground level. remove interior stair. | $50,000 |
| Oct 14, 2021 | Completed final sign-off Oct 2024 | 47 Chenery St | remodel kitchen & 1 bathroom.all appliances & plumbing fixtures locations will not change.Details
remodel kitchen & 1 bathroom.all appliances & plumbing fixtures locations will not change. | $12,800 |
| Sep 3, 2021 | Completed final sign-off Sep 2022 | 68 Richardson Av | revision to bpa#201803052884. remodel kitchen & (1) bathroom, add (1) window @ 2/f, (1) window @ 3/f, revise skylight hatch @ roof, & front security gate.Details
revision to bpa#201803052884. remodel kitchen & (1) bathroom, add (1) window @ 2/f, (1) window @ 3/f, revise skylight hatch @ roof, & front security gate. | $5,000 |
| Jul 1, 2021 | Completed final sign-off Feb 2023 | 489 Harrison St | unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower)Details
unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower) | $45,000 |
| Jun 25, 2021 | Completed final sign-off Jan 2022 | 355 Buena Vista East Av | unit 308w: 1 kitchen remodel like for like. no layout change. 1 bathroom remodel like for like rewire and sub panel (same location)Details
unit 308w: 1 kitchen remodel like for like. no layout change. 1 bathroom remodel like for like rewire and sub panel (same location) | $35,000 |
| Jun 25, 2021 | Never finaled issued Jun 2021, no final | 75 Folsom St | 1 complete kitchen remodel like for like. 1 complete bathroom remodel like for like. no layout or wall changes.Details
1 complete kitchen remodel like for like. 1 complete bathroom remodel like for like. no layout or wall changes. | $25,000 |
| Apr 20, 2021 | Completed final sign-off Jan 2023 | 230 Faxon Av | 2nd fl work only: remodel extg kitchen and extg bathroom. construct new half bath. remove wall between dining room and kitchen. new lighting and elect. no structural work.Details
2nd fl work only: remodel extg kitchen and extg bathroom. construct new half bath. remove wall between dining room and kitchen. new lighting and elect. no structural work. | $80,000 |
| Feb 4, 2021 | Never finaled issued Oct 2022, no final | 1558 Shafter Av | new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall.Details
new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall. | $200,000 |
| Nov 17, 2020 | Completed final sign-off Sep 2022 | 501 Thornton Av | convert lower level to adu. remodel kitchen in main unit. remove walls in main unit. all new windows in main unit. new rear deck.Details
convert lower level to adu. remodel kitchen in main unit. remove walls in main unit. all new windows in main unit. new rear deck. | $180,000 |
| Oct 13, 2020 | Completed final sign-off Apr 2021 | 188 Landers St | 2 complete bath remodel, like for like. tub to tub. kitchen remodel complete, subpanel. no walls/layout changeDetails
2 complete bath remodel, like for like. tub to tub. kitchen remodel complete, subpanel. no walls/layout change | $45,000 |
| Sep 19, 2020 | Never finaled issued Aug 2021, no final | 1237 08th Av | interior remodel: removal of non-structural walls, construction of new walls, kitchen remode -new cabinets, appliances, plumbing fixtures and finishes. new electrical. new footing & walls. enclose lightwell.Details
interior remodel: removal of non-structural walls, construction of new walls, kitchen remode -new cabinets, appliances, plumbing fixtures and finishes. new electrical. new footing & walls. enclose lightwell. | $15,000 |
| Feb 3, 2020 | Never finaled issued Jul 2022, no final | 2814 Clay St | rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck.Details
rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck. | $500,000 |
| Oct 3, 2019 | Completed final sign-off Mar 2020 | 585 Crestlake Dr | kitchen rmeodel, like for like. 156 sq ft. main and subpanel replaceDetails
kitchen rmeodel, like for like. 156 sq ft. main and subpanel replace | $7,000 |
| Sep 25, 2019 | Completed final sign-off Aug 2020 | 849 Mason St | unit 2. kitchen, kid's bathroom 8x7, guest bathroom remodel 5x7, like for like.Details
unit 2. kitchen, kid's bathroom 8x7, guest bathroom remodel 5x7, like for like. | $12,000 |
| Sep 23, 2019 | Completed final sign-off Oct 2020 | 22 Gaviota Wy | kitchen complete rmeodel, removing a wall, rewire the entire houseupgrade 100 to 200amp panel box main and sub. replacing sliding door in backyard like for like. deck repair like for like, less than 50%. remodel laundry room.Details
kitchen complete rmeodel, removing a wall, rewire the entire houseupgrade 100 to 200amp panel box main and sub. replacing sliding door in backyard like for like. deck repair like for like, less than 50%. remodel laundry room. | $20,000 |
| Jul 2, 2019 | Completed final sign-off Jan 2020 | 608 Haight St | kitchen remodel, like for like, rebrasting the fridge, sink and washer dryer. decrease kitchen window sizeDetails
kitchen remodel, like for like, rebrasting the fridge, sink and washer dryer. decrease kitchen window size | $15,000 |
| Mar 15, 2018 | Never finaled issued Aug 2023, no final | 2450 20th Av | comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14.Details
comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14. | $93,850 |