Back to bathroom remodel contractors
G B U Construction Development
- Based in
- San Francisco
- On San Francisco permits
- Dec 2014 to Jul 2026
- Last 24 months
- 15 permits filed
101 permits since 2000: 70 completed, 7 in progress, 16 never finaled, 8 expired or cancelled.
Of the 16 never-finaled permits, 9 are 3 to 5 years old, 7 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 31 completed, 1 in progress, 7 never finaled, 2 expired or cancelled. Typically 1 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 457 12th Av | kitchen & bathroom remodel, like for like.Details
kitchen & bathroom remodel, like for like. | $40,000 |
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 30 Lapidge St | bathroom remodel like for like. no wall alterations.Details
bathroom remodel like for like. no wall alterations. | $10,000 |
| Jul 9, 2025 | Completed final sign-off Dec 2025 | 1758 32nd Av | kitchen remodel with load bearing wall removal. bathroom remodelDetails
kitchen remodel with load bearing wall removal. bathroom remodel | $70,000 |
| Jul 8, 2025 | Completed final sign-off Sep 2025 | 346 01st St | unit#101: bathroom remodel in kind.Details
unit#101: bathroom remodel in kind. | $10,000 |
| Nov 26, 2024 | Expired or cancelled expired Jul 2026 | 1235 08th Av | per ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage.Details
per ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage. | $50,000 |
| Jul 25, 2024 | Completed final sign-off Nov 2024 | 90 Mountain Spring Av | one kitchen remodel and 2 bathroom remodel. non-structural, sub and main panel upgradeDetails
one kitchen remodel and 2 bathroom remodel. non-structural, sub and main panel upgrade | $40,000 |
| May 15, 2023 | Completed final sign-off Aug 2023 | 3665 Wawona St | 1 bedroom & 1 bathroom remodel in-kind.Details
1 bedroom & 1 bathroom remodel in-kind. | $30,000 |
| Mar 7, 2023 | Completed final sign-off Jan 2024 | 2200 Sacramento St | one kitchen remodel like for like. one bathroom remodel like for like, no shower pan. one bathroom remodel like for like, shower pan. one laundry room like for like. no walls or layout change.Details
one kitchen remodel like for like. one bathroom remodel like for like, no shower pan. one bathroom remodel like for like, shower pan. one laundry room like for like. no walls or layout change. | $50,000 |
| Jan 5, 2023 | Completed final sign-off May 2024 | 1741 16th Av | remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work.Details
remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work. | $25,000 |
| Oct 19, 2022 | Completed final sign-off Apr 2023 | 1211 Egbert Av | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $53,000 |
| Sep 1, 2022 | Completed final sign-off Sep 2022 | 2225 23rd St | 1 bathroom remodel- convert tub to shower, shower pan.Details
1 bathroom remodel- convert tub to shower, shower pan. | $15,000 |
| May 27, 2022 | Completed final sign-off Sep 2022 | 2225 23rd St | unit #304: 1 complete bathroom remodel. no walls or layout change. shower pan.Details
unit #304: 1 complete bathroom remodel. no walls or layout change. shower pan. | $20,000 |
| May 18, 2022 | Expired or cancelled cancelled Jul 2022 | 2225 23rd St | unit# 315. 1 bathroom remodel. convert tub to walk in shower.Details
unit# 315. 1 bathroom remodel. convert tub to walk in shower. | $15,000 |
| May 13, 2022 | Never finaled issued Jul 2022, no final | 1927 Ulloa St | relocate kitchen, closes two windows (interior) in the bathrooms. flip stairs in the same location and enclose this area. add a laundry room upstairs. add a skylight in kitchen and stairs.Details
relocate kitchen, closes two windows (interior) in the bathrooms. flip stairs in the same location and enclose this area. add a laundry room upstairs. add a skylight in kitchen and stairs. | $80,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2022 | 1338 28th Av | interior remodel. add a full bath 1st flDetails
interior remodel. add a full bath 1st fl | $15,000 |
| Feb 4, 2022 | Completed final sign-off Dec 2024 | 1626 31st Av | 1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen.Details
1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen. | $22,000 |
| Dec 28, 2021 | Completed final sign-off Oct 2022 | 1670 31st Av | remodel (e) bathroom/closet into 2 bathrooms, (e) kitchen, provide egress hall and storage at (e) ground level. remove interior stair.Details
remodel (e) bathroom/closet into 2 bathrooms, (e) kitchen, provide egress hall and storage at (e) ground level. remove interior stair. | $50,000 |
| Dec 15, 2021 | Completed final sign-off Jul 2024 | 127 Scott St | remodel of (e) units, expansion of lower residential unit to unused portion of 1/f, replacement of (e0 alum windows at street front with double pane wood windows. replacement of other single pane window with double pane vinyl windows, remodel of 2 (e) full bath, replacement of 2.25 bathrooms with 2Details
remodel of (e) units, expansion of lower residential unit to unused portion of 1/f, replacement of (e0 alum windows at street front with double pane wood windows. replacement of other single pane window with double pane vinyl windows, remodel of 2 (e) full bath, replacement of 2.25 bathrooms with 2 | $142,500 |
| Dec 13, 2021 | Completed final sign-off Sep 2022 | 1900 Monterey Bl | complete family bathroom remodel & half bathroom remodel; like for like, no walls or layout change.Details
complete family bathroom remodel & half bathroom remodel; like for like, no walls or layout change. | $35,000 |
| Oct 14, 2021 | Completed final sign-off Oct 2024 | 47 Chenery St | remodel kitchen & 1 bathroom.all appliances & plumbing fixtures locations will not change.Details
remodel kitchen & 1 bathroom.all appliances & plumbing fixtures locations will not change. | $12,800 |
| Sep 3, 2021 | Completed final sign-off Sep 2022 | 68 Richardson Av | revision to bpa#201803052884. remodel kitchen & (1) bathroom, add (1) window @ 2/f, (1) window @ 3/f, revise skylight hatch @ roof, & front security gate.Details
revision to bpa#201803052884. remodel kitchen & (1) bathroom, add (1) window @ 2/f, (1) window @ 3/f, revise skylight hatch @ roof, & front security gate. | $5,000 |
| Sep 1, 2021 | Completed final sign-off Nov 2021 | 7 Roscoe St | bathroom tub like for like. h.e. lighting and vacancy sensor. non structuarl.Details
bathroom tub like for like. h.e. lighting and vacancy sensor. non structuarl. | $10,000 |
| Aug 20, 2021 | Completed final sign-off Oct 2021 | 836 Brussels St | 1 bathroom remodel: tub like for like. no walls or layout change. lights per cenc 150.0(k)Details
1 bathroom remodel: tub like for like. no walls or layout change. lights per cenc 150.0(k) | $15,000 |
| Jul 16, 2021 | Completed final sign-off Oct 2024 | 556 Congo St | convert (e) attic space into living space including one bedroom,one bath & a den. total area is 437 sq ft.install one(n) dormer to the south side of (e) roof.install 4 new skylights to the north side of (e) roof.Details
convert (e) attic space into living space including one bedroom,one bath & a den. total area is 437 sq ft.install one(n) dormer to the south side of (e) roof.install 4 new skylights to the north side of (e) roof. | $50,000 |
| Jul 1, 2021 | Completed final sign-off Feb 2023 | 489 Harrison St | unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower)Details
unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower) | $45,000 |
| Jun 25, 2021 | Completed final sign-off Jan 2022 | 355 Buena Vista East Av | unit 308w: 1 kitchen remodel like for like. no layout change. 1 bathroom remodel like for like rewire and sub panel (same location)Details
unit 308w: 1 kitchen remodel like for like. no layout change. 1 bathroom remodel like for like rewire and sub panel (same location) | $35,000 |
| Jun 25, 2021 | Never finaled issued Jun 2021, no final | 75 Folsom St | 1 complete kitchen remodel like for like. 1 complete bathroom remodel like for like. no layout or wall changes.Details
1 complete kitchen remodel like for like. 1 complete bathroom remodel like for like. no layout or wall changes. | $25,000 |
| Jun 18, 2021 | Never finaled issued Aug 2022, no final | 2814 Clay St | unit legalization. interior remodel to convert (e) 966 sf, 1 bedroom 1 bath "unauthorized dwelling unit" into (n) residential unit (legal nonconforming third unit). lower the (e) concrete slab and add site steps in hallway to accommodate code compliant head height. ordinance 43-14Details
unit legalization. interior remodel to convert (e) 966 sf, 1 bedroom 1 bath "unauthorized dwelling unit" into (n) residential unit (legal nonconforming third unit). lower the (e) concrete slab and add site steps in hallway to accommodate code compliant head height. ordinance 43-14 | $50,000 |
| Apr 20, 2021 | Completed final sign-off Jan 2023 | 230 Faxon Av | 2nd fl work only: remodel extg kitchen and extg bathroom. construct new half bath. remove wall between dining room and kitchen. new lighting and elect. no structural work.Details
2nd fl work only: remodel extg kitchen and extg bathroom. construct new half bath. remove wall between dining room and kitchen. new lighting and elect. no structural work. | $80,000 |
| Feb 2, 2021 | Never finaled issued May 2021, no final | 943 York St | revision to pa# 2015-0807-3719: change windows unseen from street to vinyl,change doors and windows on south side, remove room and change bath and closet on 1st fl. 2nd fl: add interior door, window at bath, washer and dryer, 3rd fl. change and move doors, 4th fl. change ceiling heights, bath sizeDetails
revision to pa# 2015-0807-3719: change windows unseen from street to vinyl,change doors and windows on south side, remove room and change bath and closet on 1st fl. 2nd fl: add interior door, window at bath, washer and dryer, 3rd fl. change and move doors, 4th fl. change ceiling heights, bath size | $4,200 |
| Dec 16, 2020 | Completed final sign-off Aug 2021 | 855 Folsom St | bathroom remodel remove tub add roll in shower.Details
bathroom remodel remove tub add roll in shower. | $20,000 |
| Oct 19, 2020 | Completed final sign-off May 2022 | 92 28th St | bathroom remodel like for like. lower floor unit, no layout change or wall change. 40sqftDetails
bathroom remodel like for like. lower floor unit, no layout change or wall change. 40sqft | $15,000 |
| Oct 13, 2020 | Completed final sign-off Apr 2021 | 188 Landers St | 2 complete bath remodel, like for like. tub to tub. kitchen remodel complete, subpanel. no walls/layout changeDetails
2 complete bath remodel, like for like. tub to tub. kitchen remodel complete, subpanel. no walls/layout change | $45,000 |
| Feb 3, 2020 | Never finaled issued Jul 2022, no final | 2814 Clay St | rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck.Details
rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck. | $500,000 |
| Nov 5, 2019 | Completed final sign-off Dec 2020 | 46 Pond St | garage conversion 2 bedroom 2 bathroom & laundry roomDetails
garage conversion 2 bedroom 2 bathroom & laundry room | $150,000 |
| Oct 2, 2019 | Completed final sign-off Aug 2020 | 849 Mason St | unit 2. master bathroom/closet remodel - remove closet wall to make closet bigger. relocating toilet, vanity, shower tubDetails
unit 2. master bathroom/closet remodel - remove closet wall to make closet bigger. relocating toilet, vanity, shower tub | $5,000 |
| Sep 25, 2019 | Completed final sign-off Aug 2020 | 849 Mason St | unit 2. kitchen, kid's bathroom 8x7, guest bathroom remodel 5x7, like for like.Details
unit 2. kitchen, kid's bathroom 8x7, guest bathroom remodel 5x7, like for like. | $12,000 |
| Aug 21, 2019 | Completed final sign-off Oct 2020 | 22 Gaviota Wy | remodel 2 bathrooms, like for like. relocate the toilet at hallway bath. no alteration of walls. bath # 1 50 sq ft, bath # 2 46 sq ftDetails
remodel 2 bathrooms, like for like. relocate the toilet at hallway bath. no alteration of walls. bath # 1 50 sq ft, bath # 2 46 sq ft | $20,000 |
| Mar 15, 2018 | Never finaled issued Aug 2023, no final | 2450 20th Av | comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14.Details
comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14. | $93,850 |
| Jan 26, 2018 | Never finaled issued Sep 2021, no final | 61 Pleasant St | vertical addition of 1-story over (e) garage into a (1) bedroom, (1) bathroom unit. remodel of (e) garage. new design-build fire sprinkler system per nfpa-13r under separate permit.Details
vertical addition of 1-story over (e) garage into a (1) bedroom, (1) bathroom unit. remodel of (e) garage. new design-build fire sprinkler system per nfpa-13r under separate permit. | $89,195 |
| Dec 30, 2014 | Completed final sign-off Sep 2022 | 68 Richardson Av | addition to single family residence consisting of new 3rd floor (includes new bathroom).Details
addition to single family residence consisting of new 3rd floor (includes new bathroom). | $175,000 |