Frank Lok Yu Company
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Sep 2026
- Last 24 months
- 3 permits filed
73 permits since 2000: 44 completed, 3 in progress, 12 never finaled, 14 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 5 completed, 1 in progress, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 54 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2025 | In progress issued Nov 2025 | 69 Princeton St | repair or replace handrail at exterior stairway to the unit. to comply with nov #202540971 (802(c), 1001 (b), (13) (hc) #3Details
repair or replace handrail at exterior stairway to the unit. to comply with nov #202540971 (802(c), 1001 (b), (13) (hc) #3 | $480 |
| Jun 8, 2023 | Expired or cancelled suspend Jul 2023 | 5324 Anza St | revision to pa #201708033764: to comply w/ nov #201476151 & #201568133 only. note: front stair replacement is shown on pa #201708033764 hence no plans required.Details
revision to pa #201708033764: to comply w/ nov #201476151 & #201568133 only. note: front stair replacement is shown on pa #201708033764 hence no plans required. | |
| Apr 19, 2022 | Never finaled issued Apr 2022, no final | 2129 Wawona St | additional step to be added to the interior stairs. post moved 8" ne to make width of stairs 36". revision pa #202104229177 & pa #201503160915.Details
additional step to be added to the interior stairs. post moved 8" ne to make width of stairs 36". revision pa #202104229177 & pa #201503160915. | $1,000 |
| Feb 13, 2020 | Completed final sign-off Oct 2021 | 534 46th Av | construct 2 bedroom, 1 full bath & family rm at ground fl. remodel (e) kitchen, relocate (e) powder room, & replace (e) sheetrock w/new at 2nd fl. upgrade (e) bedroms, remodel (e) bathroom & add 1 new bathroom at 3rd fl. construct new dect at rear of bldg w/new staircase. replace partial foundation.Details
construct 2 bedroom, 1 full bath & family rm at ground fl. remodel (e) kitchen, relocate (e) powder room, & replace (e) sheetrock w/new at 2nd fl. upgrade (e) bedroms, remodel (e) bathroom & add 1 new bathroom at 3rd fl. construct new dect at rear of bldg w/new staircase. replace partial foundation. | $160,000 |
| Aug 3, 2017 | Never finaled issued Sep 2017, no final | 5324 Anza St | comply with nov 201568133 & address complaint #201781511 item 2 & 4, revision to pa#201603111866, replace window, rebuild rear stair & retaining wall, relocate (e) bathroom, add (n) bathroom, (n) storage room & (n) bedroom on 1/f. repair building siding.Details
comply with nov 201568133 & address complaint #201781511 item 2 & 4, revision to pa#201603111866, replace window, rebuild rear stair & retaining wall, relocate (e) bathroom, add (n) bathroom, (n) storage room & (n) bedroom on 1/f. repair building siding. | $25,000 |
| Aug 3, 2017 | Completed final sign-off Sep 2017 | 1367 San Bruno Av | replace 3 steps in staircase.Details
replace 3 steps in staircase. | $700 |
| Mar 11, 2016 | Expired or cancelled expired Sep 2016 | 5324 Anza St | to comply with nov #201568133. repair stairs. selective structural repair at the front right side. remove non-bearing walls. remodel existing bedroom on 1st floor. remodel extg bathroom on the 1st floor.Details
to comply with nov #201568133. repair stairs. selective structural repair at the front right side. remove non-bearing walls. remodel existing bedroom on 1st floor. remodel extg bathroom on the 1st floor. | $100,000 |
| Jan 29, 2014 | Completed final sign-off Aug 2014 | 1391 Natoma St | repair back stairs, replace railing (less than 50 percent) . comply with complaint# 201342311Details
repair back stairs, replace railing (less than 50 percent) . comply with complaint# 201342311 | $800 |
| Feb 21, 2013 | Expired or cancelled expired Sep 2016 | 5324 Anza St | add two more electric meter. remodel kitchen/bathroom fix back stairway (less 50%) add one gas meter.Details
add two more electric meter. remodel kitchen/bathroom fix back stairway (less 50%) add one gas meter. | $15,000 |
| Jun 11, 2012 | Expired or cancelled withdrawn Mar 2016 | 5324 Anza St | remodel kitchen, bath, remove wall, lathe, electrical wire and water pipe. fix back stairway, front stairway, under 50%. gr fl remodel kitchen, bath, remove wall, add 2nd bedroomDetails
remodel kitchen, bath, remove wall, lathe, electrical wire and water pipe. fix back stairway, front stairway, under 50%. gr fl remodel kitchen, bath, remove wall, add 2nd bedroom | $25,000 |
| Sep 4, 2007 | Completed final sign-off Sep 2007 | 1443 Funston Av | comply with complaint# 200715651. repair the stairway & provide handrails on the stairs. repair in kind. under 50%.Details
comply with complaint# 200715651. repair the stairway & provide handrails on the stairs. repair in kind. under 50%. | $450 |
| Apr 4, 2007 | Completed final sign-off May 2007 | 2832 Anza St | repair back stair steps, less than 50% of structureDetails
repair back stair steps, less than 50% of structure | $650 |