Back to bathroom remodel contractors
Frank Lok Yu Company
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Sep 2026
- Last 24 months
- 3 permits filed
73 permits since 2000: 44 completed, 3 in progress, 12 never finaled, 14 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 12 completed, 4 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2022 | Completed final sign-off Apr 2025 | 26 Southwood Dr | g/f: 2 (n) bed, bathroom and 1 laundry with media room with bar. 2/f: remodel kitchen and dining, renovate (e) bedroom and 2 new bathrooms.Details
g/f: 2 (n) bed, bathroom and 1 laundry with media room with bar. 2/f: remodel kitchen and dining, renovate (e) bedroom and 2 new bathrooms. | $110,000 |
| May 11, 2021 | Never finaled issued May 2021, no final | 49 San Jacinto Wy | replace (e) bathroom cabinets & flooring in 2/f bathroomDetails
replace (e) bathroom cabinets & flooring in 2/f bathroom | $5,000 |
| Feb 13, 2020 | Completed final sign-off Oct 2021 | 534 46th Av | construct 2 bedroom, 1 full bath & family rm at ground fl. remodel (e) kitchen, relocate (e) powder room, & replace (e) sheetrock w/new at 2nd fl. upgrade (e) bedroms, remodel (e) bathroom & add 1 new bathroom at 3rd fl. construct new dect at rear of bldg w/new staircase. replace partial foundation.Details
construct 2 bedroom, 1 full bath & family rm at ground fl. remodel (e) kitchen, relocate (e) powder room, & replace (e) sheetrock w/new at 2nd fl. upgrade (e) bedroms, remodel (e) bathroom & add 1 new bathroom at 3rd fl. construct new dect at rear of bldg w/new staircase. replace partial foundation. | $160,000 |
| Jul 27, 2018 | Completed final sign-off Oct 2018 | 3232 Taraval St | to comply w/ nov#201650521 unit#8. replace bath tub, tile, toilet & sink. replace double pane glass windows (4 windows) at back side.Details
to comply w/ nov#201650521 unit#8. replace bath tub, tile, toilet & sink. replace double pane glass windows (4 windows) at back side. | $8,500 |
| Sep 20, 2017 | Completed final sign-off Dec 2018 | 704 42nd Av | to comply with complaint 201794981, 201795691 201795021: legalize the remodel of 2 ktichens & 8 bathrooms. (#4047 units 2/3/4) & (#4041 units b & c). (#4045 shower installation). install of water heater (common area fpr 704 & 706). repair damaged joist members.Details
to comply with complaint 201794981, 201795691 201795021: legalize the remodel of 2 ktichens & 8 bathrooms. (#4047 units 2/3/4) & (#4041 units b & c). (#4045 shower installation). install of water heater (common area fpr 704 & 706). repair damaged joist members. | $48,000 |
| Aug 3, 2017 | Never finaled issued Sep 2017, no final | 5324 Anza St | comply with nov 201568133 & address complaint #201781511 item 2 & 4, revision to pa#201603111866, replace window, rebuild rear stair & retaining wall, relocate (e) bathroom, add (n) bathroom, (n) storage room & (n) bedroom on 1/f. repair building siding.Details
comply with nov 201568133 & address complaint #201781511 item 2 & 4, revision to pa#201603111866, replace window, rebuild rear stair & retaining wall, relocate (e) bathroom, add (n) bathroom, (n) storage room & (n) bedroom on 1/f. repair building siding. | $25,000 |
| Feb 6, 2017 | Completed final sign-off Jun 2017 | 2723 22nd St | remodel one bathroom, one kitchen, replace back side windows, replace heater, replace one bedroom wall texture.Details
remodel one bathroom, one kitchen, replace back side windows, replace heater, replace one bedroom wall texture. | $34,000 |
| Aug 12, 2016 | Never finaled issued Aug 2016, no final | 5324 Anza St | 1) remodel 2nd floors extg bathroom and convert utility closet into new bathroom. remodel extg kitchen on 2nd floor. 2) replace entire 2nd floors drywall in kind.Details
1) remodel 2nd floors extg bathroom and convert utility closet into new bathroom. remodel extg kitchen on 2nd floor. 2) replace entire 2nd floors drywall in kind. | $40,000 |
| Jun 9, 2016 | Completed final sign-off Jun 2017 | 193 Del Monte St | upstair- replace bath tub, tile, sink, toilet.Details
upstair- replace bath tub, tile, sink, toilet. | $5,500 |
| Mar 11, 2016 | Expired or cancelled expired Sep 2016 | 5324 Anza St | to comply with nov #201568133. repair stairs. selective structural repair at the front right side. remove non-bearing walls. remodel existing bedroom on 1st floor. remodel extg bathroom on the 1st floor.Details
to comply with nov #201568133. repair stairs. selective structural repair at the front right side. remove non-bearing walls. remodel existing bedroom on 1st floor. remodel extg bathroom on the 1st floor. | $100,000 |
| Jan 9, 2014 | Never finaled issued Jan 2014, no final | 1200 Monterey Bl | revision to permit application # 2013022106597. add work to remodel bathroom and replace one window at rear of house. u-factor <.4Details
revision to permit application # 2013022106597. add work to remodel bathroom and replace one window at rear of house. u-factor <.4 | $1,800 |
| Jan 9, 2014 | Completed final sign-off Jul 2014 | 226 Parnassus Av | unit #1: replace cabinet in kitchen, replace sink, refinish kitchen floor, replace tile in bathroom, replace cabinet with sink, replace toilet, refinish tile floor.Details
unit #1: replace cabinet in kitchen, replace sink, refinish kitchen floor, replace tile in bathroom, replace cabinet with sink, replace toilet, refinish tile floor. | $15,000 |
| Feb 21, 2013 | Expired or cancelled expired Sep 2016 | 5324 Anza St | add two more electric meter. remodel kitchen/bathroom fix back stairway (less 50%) add one gas meter.Details
add two more electric meter. remodel kitchen/bathroom fix back stairway (less 50%) add one gas meter. | $15,000 |
| Jun 11, 2012 | Expired or cancelled withdrawn Mar 2016 | 5324 Anza St | remodel kitchen, bath, remove wall, lathe, electrical wire and water pipe. fix back stairway, front stairway, under 50%. gr fl remodel kitchen, bath, remove wall, add 2nd bedroomDetails
remodel kitchen, bath, remove wall, lathe, electrical wire and water pipe. fix back stairway, front stairway, under 50%. gr fl remodel kitchen, bath, remove wall, add 2nd bedroom | $25,000 |
| Jul 1, 2011 | Completed final sign-off Nov 2012 | 42 Fernwood Dr | remodel three full bathroom,remodel kitchen. replace extg latch plaster walls and ceiling become sheetrock. replace electric wire replace stucco & backing in ground floor. repair exterior walls. replace windows, replace in front driveway cement,cut & trim tree in drive area change heater.Details
remodel three full bathroom,remodel kitchen. replace extg latch plaster walls and ceiling become sheetrock. replace electric wire replace stucco & backing in ground floor. repair exterior walls. replace windows, replace in front driveway cement,cut & trim tree in drive area change heater. | $7,500 |
| May 13, 2009 | Completed final sign-off Oct 2009 | 170 Capistrano Av | ground floor in rear part, add 1 full bathroom (tub, toilet & sink), 1 laundry room, 1 bedroom and 1 storage room.Details
ground floor in rear part, add 1 full bathroom (tub, toilet & sink), 1 laundry room, 1 bedroom and 1 storage room. | $20,000 |
| Mar 19, 2009 | Completed final sign-off Oct 2012 | 704 42nd Av | replace tile in bathroom, replace cabinet, replace cabinet in kitchen and floor, add outlet electric light fixture on wall, bedrooms and kitchen; replace light fixture and sub panel and sheetrockDetails
replace tile in bathroom, replace cabinet, replace cabinet in kitchen and floor, add outlet electric light fixture on wall, bedrooms and kitchen; replace light fixture and sub panel and sheetrock | $14,000 |
| Jul 24, 2008 | Completed final sign-off Jan 2009 | 800 35th Av | put dividing wall in existing garage to create separate parking with storage area. add laundry room and full bath.Details
put dividing wall in existing garage to create separate parking with storage area. add laundry room and full bath. | $12,000 |
| Apr 6, 2007 | Completed final sign-off Apr 2007 | 2533 24th Av | nov#200797479: abate non-conforming conditions on g/f consisting of removal of 2nd kitchen and conversion to l aundry room & document existing:vinyl windows on main floor, vinyl siding on south side elevation & kitchen & bath. cosmetic finishes & fixtures. remodel on main floor.Details
nov#200797479: abate non-conforming conditions on g/f consisting of removal of 2nd kitchen and conversion to l aundry room & document existing:vinyl windows on main floor, vinyl siding on south side elevation & kitchen & bath. cosmetic finishes & fixtures. remodel on main floor. | $25,000 |
| Apr 4, 2007 | Expired or cancelled cancelled Jan 2019 | 1570 27th Av | add in ground floor one full bathroom, one laundry room, one family room, one storage room.Details
add in ground floor one full bathroom, one laundry room, one family room, one storage room. | $28,000 |