Back to kitchen remodel contractors
Flanagan Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2025
- Last 24 months
- 1 permit filed
52 permits since 2000: 43 completed, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 263 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2021 | Completed final sign-off Aug 2022 | 2920 Gough St | unit #2922: remodel kitchen, bathroom, half bathroom, extg layout remains as is. unit#2920: plumbing and electrical work only for installation on new washer/dryer in kitchen.Details
unit #2922: remodel kitchen, bathroom, half bathroom, extg layout remains as is. unit#2920: plumbing and electrical work only for installation on new washer/dryer in kitchen. | $110,000 |
| Jan 30, 2013 | Completed final sign-off May 2013 | 1259 Guerrero St | install new cabinets, laminated flooring in existing kitchen, no structural work or walls moved,install shower in place of existing bathtub, new tile cabinets etc. no structural work .Details
install new cabinets, laminated flooring in existing kitchen, no structural work or walls moved,install shower in place of existing bathtub, new tile cabinets etc. no structural work . | $20,000 |
| Oct 21, 2009 | Completed final sign-off Aug 2010 | 1261 Guerrero St | renovation of lower flat & expansion into(e)grd fl.area.1st floor reconfigures to include master bedroom, suite with bath, 2nd bedroom & bath,laundry & family rm. kitchen renovation @ 2nd fl. conversion of bathroom to powder rm.new int. stairs connecting 1st & 2nd fl. add 2 property line windows.Details
renovation of lower flat & expansion into(e)grd fl.area.1st floor reconfigures to include master bedroom, suite with bath, 2nd bedroom & bath,laundry & family rm. kitchen renovation @ 2nd fl. conversion of bathroom to powder rm.new int. stairs connecting 1st & 2nd fl. add 2 property line windows. | $125,000 |
| Aug 16, 2005 | Completed final sign-off Apr 2006 | 2000 Vallejo St | bathroom & kitchen re-model (unit# 16) some partition walls to be demolished & moved / re-built.Details
bathroom & kitchen re-model (unit# 16) some partition walls to be demolished & moved / re-built. | $60,000 |
| Sep 26, 2003 | Completed final sign-off Jun 2004 | 235 Christopher Dr | remodel kitchen/bathroom includes patch sheet-rock after plum/elec work, new cabinets, new windows,Details
remodel kitchen/bathroom includes patch sheet-rock after plum/elec work, new cabinets, new windows, | $10,000 |
| May 28, 2002 | Expired or cancelled expired Feb 2003 | 1940 Mcallister St | second flr kitchen: remove internal stairs to dining rm & reframe to match w/ existing flr. installDetails
second flr kitchen: remove internal stairs to dining rm & reframe to match w/ existing flr. install | $12,000 |
| Mar 8, 2002 | Completed final sign-off Jun 2002 | 2412 44th Av | remove & replace 3 windows on side of bldg. with similar vinyl window, sheetrock portion of kitchenDetails
remove & replace 3 windows on side of bldg. with similar vinyl window, sheetrock portion of kitchen | $2,500 |