Flanagan Construction

Contractor license
716383
State license record
Based in
San Francisco
On San Francisco permits
Jan 2000 to Nov 2025
Last 24 months
1 permit filed

52 permits since 2000: 43 completed, 2 never finaled, 7 expired or cancelled.

Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 2Stairs 11Kitchen remodel 7Bathroom remodel 14

2 deck permits: 2 completed. Typically 65 days from filing to permit and 102 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 30, 2009Completed
final sign-off Aug 2010
1261 Guerrero Strev. to pa# 2009.10.21.9512. for renovations to the lower flat to include a wet bar at the 1st floor, and adding a new rear deck and stair at the 2nd floor to replace (e) enclosed porch and stair and new window at rear elevation at 2nd floor and storage doors at 1st floor rear elevation
Details
Permit
200911302231
Status
complete
Filed
Nov 30, 2009
Permit issued
Apr 9, 2010
Final sign-off
Aug 19, 2010
Declared cost
$9,000
Address
1261 Guerrero St

rev. to pa# 2009.10.21.9512. for renovations to the lower flat to include a wet bar at the 1st floor, and adding a new rear deck and stair at the 2nd floor to replace (e) enclosed porch and stair and new window at rear elevation at 2nd floor and storage doors at 1st floor rear elevation

Open the permit page

$9,000
Jul 21, 2004Completed
final sign-off Sep 2004
300 Mangels Avcantilevered joists supporting 4x10 ft deck/landing infected with dryrot,to be replaced, deck/lnding
Details
Permit
200407219359
Status
complete
Filed
Jul 21, 2004
Permit issued
Jul 21, 2004
Final sign-off
Sep 30, 2004
Declared cost
$3,300
Address
300 Mangels Av

cantilevered joists supporting 4x10 ft deck/landing infected with dryrot,to be replaced, deck/lnding

Open the permit page

$3,300