Back to bathroom remodel contractors
Flanagan Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2025
- Last 24 months
- 1 permit filed
52 permits since 2000: 43 completed, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 11 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2021 | Completed final sign-off Aug 2022 | 2920 Gough St | unit #2922: remodel kitchen, bathroom, half bathroom, extg layout remains as is. unit#2920: plumbing and electrical work only for installation on new washer/dryer in kitchen.Details
unit #2922: remodel kitchen, bathroom, half bathroom, extg layout remains as is. unit#2920: plumbing and electrical work only for installation on new washer/dryer in kitchen. | $110,000 |
| Jun 26, 2020 | Completed final sign-off Feb 2021 | 54 Upper Tr | bathroom remodel, layout remains as is, no framing, plumbing fixtures going back in same place. bathroom dimensions are 70 inches wide x 93 inches long x 100 inches height bathroom layout remains the sameDetails
bathroom remodel, layout remains as is, no framing, plumbing fixtures going back in same place. bathroom dimensions are 70 inches wide x 93 inches long x 100 inches height bathroom layout remains the same | $20,000 |
| Jul 3, 2018 | Expired or cancelled cancelled Jan 2021 | 2033 Baker St | remodel bathroom, remove (e) clawfoot tub and replace with (n) shower. replace (e) window with (n) window to fit wi/in (e) opening & only visible within lightwell. no modification or infills to walls, exisitng layout remains unchanged.Details
remodel bathroom, remove (e) clawfoot tub and replace with (n) shower. replace (e) window with (n) window to fit wi/in (e) opening & only visible within lightwell. no modification or infills to walls, exisitng layout remains unchanged. | $15,000 |
| Aug 27, 2012 | Completed final sign-off Apr 2013 | 1253 Guerrero St | renovation of existing baths on the 1st, 2nd and 3rd floors. 2nd fl bath converted to 1/2 bath, 1st fl 1/2 bath to full bath, new bath at 3rd fl by convertting study to master bath, renovate other 3rd fl bath. work to also include dry rot repair of front exterior wood stairDetails
renovation of existing baths on the 1st, 2nd and 3rd floors. 2nd fl bath converted to 1/2 bath, 1st fl 1/2 bath to full bath, new bath at 3rd fl by convertting study to master bath, renovate other 3rd fl bath. work to also include dry rot repair of front exterior wood stair | $50,000 |
| Apr 25, 2012 | Never finaled issued Apr 2012, no final | 601 04th St | revision / as builts for pa# 201202013372. eliminates new dropped ceiling, sprinkler work under separte permit bathroom ceiling and new electrical fixture.Details
revision / as builts for pa# 201202013372. eliminates new dropped ceiling, sprinkler work under separte permit bathroom ceiling and new electrical fixture. | |
| Feb 1, 2012 | Expired or cancelled expired Apr 2014 | 601 04th St | 3rd floor/unit #322-remodel of bathroom & laundry room, add doors to wall in laundry room that are bearing wall (s); fire sprinklers as needed.Details
3rd floor/unit #322-remodel of bathroom & laundry room, add doors to wall in laundry room that are bearing wall (s); fire sprinklers as needed. | $40,000 |
| Jan 19, 2010 | Completed final sign-off Mar 2010 | 2000 Vallejo St | mildew problem in one bathroom wall. open-up wall remove damaged plaster & sheetrock (apt.#4).Details
mildew problem in one bathroom wall. open-up wall remove damaged plaster & sheetrock (apt.#4). | $2,000 |
| Oct 21, 2009 | Completed final sign-off Aug 2010 | 1261 Guerrero St | renovation of lower flat & expansion into(e)grd fl.area.1st floor reconfigures to include master bedroom, suite with bath, 2nd bedroom & bath,laundry & family rm. kitchen renovation @ 2nd fl. conversion of bathroom to powder rm.new int. stairs connecting 1st & 2nd fl. add 2 property line windows.Details
renovation of lower flat & expansion into(e)grd fl.area.1st floor reconfigures to include master bedroom, suite with bath, 2nd bedroom & bath,laundry & family rm. kitchen renovation @ 2nd fl. conversion of bathroom to powder rm.new int. stairs connecting 1st & 2nd fl. add 2 property line windows. | $125,000 |
| Aug 16, 2005 | Completed final sign-off Apr 2006 | 2000 Vallejo St | bathroom & kitchen re-model (unit# 16) some partition walls to be demolished & moved / re-built.Details
bathroom & kitchen re-model (unit# 16) some partition walls to be demolished & moved / re-built. | $60,000 |
| Feb 6, 2004 | Completed final sign-off Mar 2004 | 1634 Fulton St | bathrm remodel,bathroom to be stripped to studs and sub floor new sheetrock insulation floor to beDetails
bathrm remodel,bathroom to be stripped to studs and sub floor new sheetrock insulation floor to be | $11,500 |
| Dec 3, 2003 | Completed final sign-off Jun 2004 | 235 Christopher Dr | remodel main bathroom,install new bath,new window,install 2 replacement window @front of house & 1 @Details
remodel main bathroom,install new bath,new window,install 2 replacement window @front of house & 1 @ | $10,000 |
| Sep 26, 2003 | Completed final sign-off Jun 2004 | 235 Christopher Dr | remodel kitchen/bathroom includes patch sheet-rock after plum/elec work, new cabinets, new windows,Details
remodel kitchen/bathroom includes patch sheet-rock after plum/elec work, new cabinets, new windows, | $10,000 |
| Sep 27, 2000 | Completed final sign-off Mar 2001 | 2406 44th Av | renewal of applciation 20000120493, 4 more bathrooms to remodel, stucco on front of bldg replace w/Details
renewal of applciation 20000120493, 4 more bathrooms to remodel, stucco on front of bldg replace w/ | $20,000 |
| Jan 20, 2000 | Completed final sign-off Mar 2001 | 2406 44th Av | 6 bathrooms, remove existing sheetrock/plaster, strip bathrooms down to studs.etcDetails
6 bathrooms, remove existing sheetrock/plaster, strip bathrooms down to studs.etc | $10,000 |