Back to kitchen remodel contractors
Finbarr Collins Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Jun 2026
- Last 24 months
- 8 permits filed
86 permits since 2000: 41 completed, 8 in progress, 28 never finaled, 9 expired or cancelled.
Of the 28 never-finaled permits, 6 are 3 to 5 years old, 9 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 7 completed, 2 in progress, 6 never finaled. Typically 40 days from filing to permit and 405 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2026 | In progress issued Apr 2026 | 1990 Green St | remodel of 2 bathrooms(e) & remodel of kitchen(e)Details
remodel of 2 bathrooms(e) & remodel of kitchen(e) | $50,000 |
| Jan 30, 2024 | In progress issued Oct 2024 | 295 Sanchez St | kitchen & bathroom renovation/remodel, selective window replacement, replace roof-guardrail glass.Details
kitchen & bathroom renovation/remodel, selective window replacement, replace roof-guardrail glass. | $200,000 |
| Mar 1, 2021 | Never finaled issued Mar 2021, no final | 622 Haight St | change fixtures in 2 bathrooms. change kitchen cabinets & appliance.Details
change fixtures in 2 bathrooms. change kitchen cabinets & appliance. | $45,000 |
| May 12, 2020 | Completed final sign-off Apr 2021 | 136 Los Palmos Dr | 1) kitchen: remove & upgrade all appliances, cabinets & tile flooring. 2) 2 bathrooms: remove & upgrade fixtures, leaking pipes & replace tiling. all kitchen & bathroom appliances & fixtures to match existing locations. electrical to be upgraded & plumbing as needed in separate permits. all in-kind.Details
1) kitchen: remove & upgrade all appliances, cabinets & tile flooring. 2) 2 bathrooms: remove & upgrade fixtures, leaking pipes & replace tiling. all kitchen & bathroom appliances & fixtures to match existing locations. electrical to be upgraded & plumbing as needed in separate permits. all in-kind. | $33,000 |
| Dec 8, 2016 | Never finaled issued Feb 2017, no final | 4440 24th St | partial interior renovation, gr fl storage rooms. renovate kitchen and 2 bathrooms, new windows at rear of home and new skylights. repair deck stair in kind. new above gr lap pool. no more than 3' above gradeDetails
partial interior renovation, gr fl storage rooms. renovate kitchen and 2 bathrooms, new windows at rear of home and new skylights. repair deck stair in kind. new above gr lap pool. no more than 3' above grade | $120,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Jan 28, 2016 | Never finaled issued Jan 2016, no final | 169 11th St | demo pony walls and remove kitchen per ab-017Details
demo pony walls and remove kitchen per ab-017 | $3,500 |
| Sep 1, 2015 | Completed final sign-off Aug 2017 | 4249 24th St | renovation of (e) single family home, rear yard addition at 1st flr.renovate kitchen & 2 baths add bath & new skylights. n/a for maher ordinance no.155-13.Details
renovation of (e) single family home, rear yard addition at 1st flr.renovate kitchen & 2 baths add bath & new skylights. n/a for maher ordinance no.155-13. | $150,000 |
| Aug 12, 2015 | Never finaled issued Sep 2015, no final | 2227 Polk St | install north elevation windows, to comply with nov# 201538572. install (n) walk in unit. no interior remodel, bar or kitchen work performed.Details
install north elevation windows, to comply with nov# 201538572. install (n) walk in unit. no interior remodel, bar or kitchen work performed. | $2,000 |
| Jul 10, 2015 | Completed final sign-off Jan 2016 | 252 Divisadero St | interior t.i. inclues new seating, new kitchen and new uni-sex restroom. mep and life safety shall be under separate permit.Details
interior t.i. inclues new seating, new kitchen and new uni-sex restroom. mep and life safety shall be under separate permit. | $20,000 |
| Dec 23, 2013 | Never finaled issued Jul 2014, no final | 1280 10th Av | residdential unit: convert 1 to 2 units. new exterior roof deck under ab-057 (10 day notification). no 311 required. add 1 bath & kitchen. add 1 bathroom & 1 kitchen. renovate facade at south & west locations facing street.Details
residdential unit: convert 1 to 2 units. new exterior roof deck under ab-057 (10 day notification). no 311 required. add 1 bath & kitchen. add 1 bathroom & 1 kitchen. renovate facade at south & west locations facing street. | $80,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 1280 10th Av | residential: kitchen remodel, retail: foundation work & accessibility improvements, no exterior work, structural upgrade per plan.Details
residential: kitchen remodel, retail: foundation work & accessibility improvements, no exterior work, structural upgrade per plan. | $75,000 |
| Oct 25, 2010 | Completed final sign-off Jan 2011 | 1755 Alabama St | revision to appl #200711017018: enlarge bedrom #1 @ 1st floor, modification of 2nd floor plan to enlarge kitchen, living & dining by eliminating one bedroom & one bathroom. minor floor plan modification @ 3rd floor. convert (e) unoccupied roof w/(e) parapet to roof deck @ front fo 3rd floor.Details
revision to appl #200711017018: enlarge bedrom #1 @ 1st floor, modification of 2nd floor plan to enlarge kitchen, living & dining by eliminating one bedroom & one bathroom. minor floor plan modification @ 3rd floor. convert (e) unoccupied roof w/(e) parapet to roof deck @ front fo 3rd floor. | |
| Mar 4, 2010 | Completed final sign-off Jun 2011 | 600 Wisconsin St | retile 2 bathrooms. replace existing interior & dry rot. change kitchen cabinet doors. patch all open areas. replace furnace in same location with furnace. upgrade electrical panel.Details
retile 2 bathrooms. replace existing interior & dry rot. change kitchen cabinet doors. patch all open areas. replace furnace in same location with furnace. upgrade electrical panel. | $16,500 |
| Nov 1, 2007 | Completed final sign-off Jan 2011 | 1755 Alabama St | horizontal & vertical addition: 1st flr remodel w/conversion of 1 car garage to 2 car garage & removal of existing deck & storage to accomodate new rear patio. 2nd floor: remodel with relocation of kitchen & bath & extension of (e) deck.add 3rd story to accomodate addtnal living sp w/bath & deck.Details
horizontal & vertical addition: 1st flr remodel w/conversion of 1 car garage to 2 car garage & removal of existing deck & storage to accomodate new rear patio. 2nd floor: remodel with relocation of kitchen & bath & extension of (e) deck.add 3rd story to accomodate addtnal living sp w/bath & deck. | $150,000 |