Back to bathroom remodel contractors
Finbarr Collins Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Jun 2026
- Last 24 months
- 8 permits filed
86 permits since 2000: 41 completed, 8 in progress, 28 never finaled, 9 expired or cancelled.
Of the 28 never-finaled permits, 6 are 3 to 5 years old, 9 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 9 completed, 2 in progress, 4 never finaled, 3 expired or cancelled. Typically 122 days from filing to permit and 470 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2026 | In progress issued Apr 2026 | 1990 Green St | remodel of 2 bathrooms(e) & remodel of kitchen(e)Details
remodel of 2 bathrooms(e) & remodel of kitchen(e) | $50,000 |
| Jan 30, 2024 | In progress issued Oct 2024 | 295 Sanchez St | kitchen & bathroom renovation/remodel, selective window replacement, replace roof-guardrail glass.Details
kitchen & bathroom renovation/remodel, selective window replacement, replace roof-guardrail glass. | $200,000 |
| Mar 1, 2021 | Never finaled issued Mar 2021, no final | 622 Haight St | change fixtures in 2 bathrooms. change kitchen cabinets & appliance.Details
change fixtures in 2 bathrooms. change kitchen cabinets & appliance. | $45,000 |
| Jan 23, 2021 | Never finaled issued Feb 2022, no final | 1922 09th Av | convert portion of 1st fl to habitable space; remodel converted space & (e) habitable space for use as 1-bedrm,1-bath,fitness,laundry; remodel int'r staircase. demolish int'r raised fl & wall framing & finish; reinforce foundation; wood framing int'r & ext'r walls/ceiling/floor assemblies, ext'rDetails
convert portion of 1st fl to habitable space; remodel converted space & (e) habitable space for use as 1-bedrm,1-bath,fitness,laundry; remodel int'r staircase. demolish int'r raised fl & wall framing & finish; reinforce foundation; wood framing int'r & ext'r walls/ceiling/floor assemblies, ext'r | $200,000 |
| May 12, 2020 | Completed final sign-off Apr 2021 | 136 Los Palmos Dr | 1) kitchen: remove & upgrade all appliances, cabinets & tile flooring. 2) 2 bathrooms: remove & upgrade fixtures, leaking pipes & replace tiling. all kitchen & bathroom appliances & fixtures to match existing locations. electrical to be upgraded & plumbing as needed in separate permits. all in-kind.Details
1) kitchen: remove & upgrade all appliances, cabinets & tile flooring. 2) 2 bathrooms: remove & upgrade fixtures, leaking pipes & replace tiling. all kitchen & bathroom appliances & fixtures to match existing locations. electrical to be upgraded & plumbing as needed in separate permits. all in-kind. | $33,000 |
| Nov 30, 2018 | Expired or cancelled expired Feb 2025 | 742 Myra Wy | rear yard addition. new bathroom at ground level below existing detail.Details
rear yard addition. new bathroom at ground level below existing detail. | $30,000 |
| Dec 21, 2017 | Completed final sign-off Aug 2024 | 50 Fair Oaks St | horizontal & vertical addition & renovation of (e) 2 units residence. new foundation work. horizontal addition of rear of 1st floor & vertical addition of new 3rd floor (net add of 644 sf). add 2.5 bathrooms to upper unit.Details
horizontal & vertical addition & renovation of (e) 2 units residence. new foundation work. horizontal addition of rear of 1st floor & vertical addition of new 3rd floor (net add of 644 sf). add 2.5 bathrooms to upper unit. | $510,000 |
| Jul 19, 2017 | Completed final sign-off Sep 2018 | 2469 14th Av | interior remodel @ main lvl to create new master suite (new master bath & existing bedroom converted to new master closet), interior remodel @ existing guest bath, new conditioned area added at lower lvl in existing garage space to create new media room. some windows replaced in kind &Details
interior remodel @ main lvl to create new master suite (new master bath & existing bedroom converted to new master closet), interior remodel @ existing guest bath, new conditioned area added at lower lvl in existing garage space to create new media room. some windows replaced in kind & | $150,000 |
| Dec 8, 2016 | Never finaled issued Feb 2017, no final | 4440 24th St | partial interior renovation, gr fl storage rooms. renovate kitchen and 2 bathrooms, new windows at rear of home and new skylights. repair deck stair in kind. new above gr lap pool. no more than 3' above gradeDetails
partial interior renovation, gr fl storage rooms. renovate kitchen and 2 bathrooms, new windows at rear of home and new skylights. repair deck stair in kind. new above gr lap pool. no more than 3' above grade | $120,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Sep 1, 2015 | Completed final sign-off Aug 2017 | 4249 24th St | renovation of (e) single family home, rear yard addition at 1st flr.renovate kitchen & 2 baths add bath & new skylights. n/a for maher ordinance no.155-13.Details
renovation of (e) single family home, rear yard addition at 1st flr.renovate kitchen & 2 baths add bath & new skylights. n/a for maher ordinance no.155-13. | $150,000 |
| Jul 7, 2015 | Completed final sign-off Mar 2019 | 409 Clipper St | partial interior renovation. convert 3rd fl attic to living space, three bedrooms + two baths. rebuild front stair & move forward toward front property line 3'-0". lower (e) basement flr approx. 3'-0".Details
partial interior renovation. convert 3rd fl attic to living space, three bedrooms + two baths. rebuild front stair & move forward toward front property line 3'-0". lower (e) basement flr approx. 3'-0". | $175,357 |
| Dec 23, 2013 | Never finaled issued Jul 2014, no final | 1280 10th Av | residdential unit: convert 1 to 2 units. new exterior roof deck under ab-057 (10 day notification). no 311 required. add 1 bath & kitchen. add 1 bathroom & 1 kitchen. renovate facade at south & west locations facing street.Details
residdential unit: convert 1 to 2 units. new exterior roof deck under ab-057 (10 day notification). no 311 required. add 1 bath & kitchen. add 1 bathroom & 1 kitchen. renovate facade at south & west locations facing street. | $80,000 |
| Oct 25, 2010 | Completed final sign-off Jan 2011 | 1755 Alabama St | revision to appl #200711017018: enlarge bedrom #1 @ 1st floor, modification of 2nd floor plan to enlarge kitchen, living & dining by eliminating one bedroom & one bathroom. minor floor plan modification @ 3rd floor. convert (e) unoccupied roof w/(e) parapet to roof deck @ front fo 3rd floor.Details
revision to appl #200711017018: enlarge bedrom #1 @ 1st floor, modification of 2nd floor plan to enlarge kitchen, living & dining by eliminating one bedroom & one bathroom. minor floor plan modification @ 3rd floor. convert (e) unoccupied roof w/(e) parapet to roof deck @ front fo 3rd floor. | |
| Mar 4, 2010 | Completed final sign-off Jun 2011 | 600 Wisconsin St | retile 2 bathrooms. replace existing interior & dry rot. change kitchen cabinet doors. patch all open areas. replace furnace in same location with furnace. upgrade electrical panel.Details
retile 2 bathrooms. replace existing interior & dry rot. change kitchen cabinet doors. patch all open areas. replace furnace in same location with furnace. upgrade electrical panel. | $16,500 |
| Dec 16, 2009 | Expired or cancelled expired Jan 2013 | 4050 24th St | upgrade existing unisex bathroom. install 68 feet long of underpinning at right side property lineDetails
upgrade existing unisex bathroom. install 68 feet long of underpinning at right side property line | $12,000 |
| Dec 7, 2009 | Expired or cancelled expired Mar 2012 | 4040 24th St | rehang 1st flr bathroom door, add rails to stairs 1st-2nd flr. underpin 39 linear feet of left side footing per plan.Details
rehang 1st flr bathroom door, add rails to stairs 1st-2nd flr. underpin 39 linear feet of left side footing per plan. | $8,000 |
| Nov 1, 2007 | Completed final sign-off Jan 2011 | 1755 Alabama St | horizontal & vertical addition: 1st flr remodel w/conversion of 1 car garage to 2 car garage & removal of existing deck & storage to accomodate new rear patio. 2nd floor: remodel with relocation of kitchen & bath & extension of (e) deck.add 3rd story to accomodate addtnal living sp w/bath & deck.Details
horizontal & vertical addition: 1st flr remodel w/conversion of 1 car garage to 2 car garage & removal of existing deck & storage to accomodate new rear patio. 2nd floor: remodel with relocation of kitchen & bath & extension of (e) deck.add 3rd story to accomodate addtnal living sp w/bath & deck. | $150,000 |