Finbarr Collins Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Jun 2026
- Last 24 months
- 8 permits filed
86 permits since 2000: 41 completed, 8 in progress, 28 never finaled, 9 expired or cancelled.
Of the 28 never-finaled permits, 6 are 3 to 5 years old, 9 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 5 completed, 1 in progress, 5 never finaled, 1 expired or cancelled. Typically 154 days from filing to permit and 686 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 295 Sanchez St | add new sunshade and replace glass guardrail with solid parapet on existing level 2 deck. reconfigure exterior egress stair be6tween g/f and 2/f.Details
add new sunshade and replace glass guardrail with solid parapet on existing level 2 deck. reconfigure exterior egress stair be6tween g/f and 2/f. | $20,000 |
| Jan 23, 2021 | Never finaled issued Feb 2022, no final | 1922 09th Av | convert portion of 1st fl to habitable space; remodel converted space & (e) habitable space for use as 1-bedrm,1-bath,fitness,laundry; remodel int'r staircase. demolish int'r raised fl & wall framing & finish; reinforce foundation; wood framing int'r & ext'r walls/ceiling/floor assemblies, ext'rDetails
convert portion of 1st fl to habitable space; remodel converted space & (e) habitable space for use as 1-bedrm,1-bath,fitness,laundry; remodel int'r staircase. demolish int'r raised fl & wall framing & finish; reinforce foundation; wood framing int'r & ext'r walls/ceiling/floor assemblies, ext'r | $200,000 |
| Sep 24, 2020 | Never finaled issued Apr 2021, no final | 780 Elizabeth St | (n) roof deck w/ handrail. (n) stairs to meet roof deck. (n) water tampered outlet and plubming for a hose bib at roof deck.Details
(n) roof deck w/ handrail. (n) stairs to meet roof deck. (n) water tampered outlet and plubming for a hose bib at roof deck. | $25,000 |
| Jun 12, 2020 | Completed final sign-off Jul 2024 | 537 Pennsylvania Av | renovation to third story existing stairwell, new rooftop stair enclosure, new parapet wall and new plumbing fixtures. remodel existing roof patio.Details
renovation to third story existing stairwell, new rooftop stair enclosure, new parapet wall and new plumbing fixtures. remodel existing roof patio. | $50,000 |
| Oct 3, 2019 | Completed final sign-off Mar 2021 | 3545 Pierce St | revision to app# 201712287578 to include a new step to be added at the bottom of the extg walkup stairs at the front of the property due to leveling of the extg bldg floors at the front. n/a for maherDetails
revision to app# 201712287578 to include a new step to be added at the bottom of the extg walkup stairs at the front of the property due to leveling of the extg bldg floors at the front. n/a for maher | |
| Oct 3, 2019 | Completed final sign-off Mar 2021 | 3543 Pierce St | revision to app#201712287576 to include a new step to be added at the bottom of the extg walkup stairs at the front of the property due to leveling of the extg bldg floors at the front. n/a for maherDetails
revision to app#201712287576 to include a new step to be added at the bottom of the extg walkup stairs at the front of the property due to leveling of the extg bldg floors at the front. n/a for maher | |
| Jan 28, 2019 | Never finaled issued Dec 2019, no final | 780 Elizabeth St | interior remodel: structural upgrade, (n) doors & windows back of house, remodel interior stairs, increase habitable space @ basement, expansion habitable space roof line 2/3 back of house. legalize ground floor unit.Details
interior remodel: structural upgrade, (n) doors & windows back of house, remodel interior stairs, increase habitable space @ basement, expansion habitable space roof line 2/3 back of house. legalize ground floor unit. | $800,000 |
| Dec 8, 2016 | Never finaled issued Feb 2017, no final | 4440 24th St | partial interior renovation, gr fl storage rooms. renovate kitchen and 2 bathrooms, new windows at rear of home and new skylights. repair deck stair in kind. new above gr lap pool. no more than 3' above gradeDetails
partial interior renovation, gr fl storage rooms. renovate kitchen and 2 bathrooms, new windows at rear of home and new skylights. repair deck stair in kind. new above gr lap pool. no more than 3' above grade | $120,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Jul 7, 2015 | Completed final sign-off Mar 2019 | 409 Clipper St | partial interior renovation. convert 3rd fl attic to living space, three bedrooms + two baths. rebuild front stair & move forward toward front property line 3'-0". lower (e) basement flr approx. 3'-0".Details
partial interior renovation. convert 3rd fl attic to living space, three bedrooms + two baths. rebuild front stair & move forward toward front property line 3'-0". lower (e) basement flr approx. 3'-0". | $175,357 |
| Jun 16, 2015 | Never finaled issued Jul 2015, no final | 1548 California St | change of occupancy from b to a-2. install new stair handrail, panic hardware, exit signs. n/a for maher ordinance. for planning code purpose no chamge of use, no change in sq. ft. no exterior changes beyond door replacement in kind.Details
change of occupancy from b to a-2. install new stair handrail, panic hardware, exit signs. n/a for maher ordinance. for planning code purpose no chamge of use, no change in sq. ft. no exterior changes beyond door replacement in kind. | |
| Dec 7, 2009 | Expired or cancelled expired Mar 2012 | 4040 24th St | rehang 1st flr bathroom door, add rails to stairs 1st-2nd flr. underpin 39 linear feet of left side footing per plan.Details
rehang 1st flr bathroom door, add rails to stairs 1st-2nd flr. underpin 39 linear feet of left side footing per plan. | $8,000 |