Back to kitchen remodel contractors
Express Project Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jul 2022
- Last 24 months
- 0 permits filed
39 permits since 2000: 37 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 12 completed. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2022 | Completed final sign-off Oct 2022 | 1690 31st Av | one kitchen remodel. replace cabinets, faucet, sink. replace 2 windows and 1 sliding door at central patio area. same size and same in kind.Details
one kitchen remodel. replace cabinets, faucet, sink. replace 2 windows and 1 sliding door at central patio area. same size and same in kind. | $18,000 |
| Jul 21, 2022 | Completed final sign-off Jan 2023 | 658 Spruce St | one kitchen and 2 bathroom remodel change 1 existing bathtub to shower space- install ceiling recesses lightsDetails
one kitchen and 2 bathroom remodel change 1 existing bathtub to shower space- install ceiling recesses lights | $40,000 |
| Jul 1, 2021 | Completed final sign-off Sep 2021 | 140 Shrader St | one kitchen and one bathroom remodel. replace 2 windows and 1 door in kitchen area (rear of the building)Details
one kitchen and one bathroom remodel. replace 2 windows and 1 door in kitchen area (rear of the building) | $30,000 |
| Jan 31, 2020 | Completed final sign-off Aug 2020 | 1357 Oak St | kitchen remodel - install all new appliances. washer and dryer. bathroom remodel - close-out (e) shower unit to install new vanity sink. change (e) bathtub to shower space, replace 1 window in bathroom. upgrade (e) electrical subpanel and install recess lights and switchesDetails
kitchen remodel - install all new appliances. washer and dryer. bathroom remodel - close-out (e) shower unit to install new vanity sink. change (e) bathtub to shower space, replace 1 window in bathroom. upgrade (e) electrical subpanel and install recess lights and switches | $50,000 |
| Apr 5, 2017 | Completed final sign-off Aug 2017 | 133 Varennes St | kitchen & bath renovation: new walls, insulation, new plumbing & gas, new electric, all new fixtures, cabinets, appliances, replace 4 rear windows (no size change), new lighting (led), add washer/dryer laundry, new furnace.Details
kitchen & bath renovation: new walls, insulation, new plumbing & gas, new electric, all new fixtures, cabinets, appliances, replace 4 rear windows (no size change), new lighting (led), add washer/dryer laundry, new furnace. | $55,000 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 1454 28th Av | remodel kitchen, replace 1 window at kitchen area , install ceiling lighting, replace dry rot at lightwell area, replace furnace. window not visible from street. contact bldng. imnsp. for pre-construction meeting.Details
remodel kitchen, replace 1 window at kitchen area , install ceiling lighting, replace dry rot at lightwell area, replace furnace. window not visible from street. contact bldng. imnsp. for pre-construction meeting. | $25,000 |
| Mar 26, 2012 | Completed final sign-off Jun 2012 | 139 Varennes St | new wall and framing for bath and kitchen on 2nd & 3rd floors apartment. revision to app #201201242790.Details
new wall and framing for bath and kitchen on 2nd & 3rd floors apartment. revision to app #201201242790. | $3,000 |
| Jan 24, 2012 | Completed final sign-off Jun 2012 | 139 Varennes St | remodel existing kitchen and bathrm on apt #139 and 139a, relocate plumbing, gas electrical work, repl shower pan, faucet, toilet, vanity wall and floor tile, replace kitchn cabinets, sink faucet, range hood, appliances, washer and dryer wall gas heater, dryer exhaust thru roof for top flr unitDetails
remodel existing kitchen and bathrm on apt #139 and 139a, relocate plumbing, gas electrical work, repl shower pan, faucet, toilet, vanity wall and floor tile, replace kitchn cabinets, sink faucet, range hood, appliances, washer and dryer wall gas heater, dryer exhaust thru roof for top flr unit | $50,000 |
| Aug 27, 2008 | Completed final sign-off Dec 2008 | 683 41st Av | remodel (e) kitchen with new cabinets. counter top. sink appliances. revoke (e) stucco & replace dry & corrior rot on front of the house. re-stucco @ corner of bldg. ground level only.Details
remodel (e) kitchen with new cabinets. counter top. sink appliances. revoke (e) stucco & replace dry & corrior rot on front of the house. re-stucco @ corner of bldg. ground level only. | |
| May 1, 2002 | Completed final sign-off Jul 2002 | 114 Porter St | replace damage floor joists.kitchen & bathrm subfloor & passage way concrete.Details
replace damage floor joists.kitchen & bathrm subfloor & passage way concrete. | $8,000 |
| Aug 17, 2001 | Completed final sign-off Sep 2001 | 1527 Moraga St | bathroom remodeling. install pocket door & sink in toilet room. install tile on kitchen floor.Details
bathroom remodeling. install pocket door & sink in toilet room. install tile on kitchen floor. | $8,000 |
| Jul 19, 2001 | Completed final sign-off Oct 2001 | 1309 Cabrillo St | install kitchen cabinet, kitchen sink & faucent only on 1309-1311 cabrillo st.Details
install kitchen cabinet, kitchen sink & faucent only on 1309-1311 cabrillo st. | $1,700 |