Block 0104, lot 044
133 Varennes St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,530 sq ft
- Lot
- 1,799 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 5, 2017 | Completed final sign-off Aug 2017 | 133 Varennes St | Express Project Construction Co | kitchen & bath renovation: new walls, insulation, new plumbing & gas, new electric, all new fixtures, cabinets, appliances, replace 4 rear windows (no size change), new lighting (led), add washer/dryer laundry, new furnace.Details
kitchen & bath renovation: new walls, insulation, new plumbing & gas, new electric, all new fixtures, cabinets, appliances, replace 4 rear windows (no size change), new lighting (led), add washer/dryer laundry, new furnace. | $55,000 |
| Jul 8, 2015 | Completed final sign-off Nov 2015 | 133 Varennes St | Nabi Construction & Engineering Inc | soft story retrofit per sfbc 34b. engineering criteria used 2012 iebc appendix a-4.Details
soft story retrofit per sfbc 34b. engineering criteria used 2012 iebc appendix a-4. | $75,000 |
| Oct 14, 2014 | Completed final sign-off Dec 2014 | 137 Varennes St | Baires Construction Inc | kitchen and bath renovation - new walls, insulation, new plumbing and gas, new electric, all new fixtures, cabinets, appliances, 3 replaced windows (no size change)flooring in kind. non load bearing walls, new led lighting.Details
kitchen and bath renovation - new walls, insulation, new plumbing and gas, new electric, all new fixtures, cabinets, appliances, 3 replaced windows (no size change)flooring in kind. non load bearing walls, new led lighting. | $55,000 |
| Mar 26, 2012 | Completed final sign-off Jun 2012 | 139 Varennes St | Express Project Construction Co | new wall and framing for bath and kitchen on 2nd & 3rd floors apartment. revision to app #201201242790.Details
new wall and framing for bath and kitchen on 2nd & 3rd floors apartment. revision to app #201201242790. | $3,000 |
| Jan 25, 2012 | Never finaled issued Jan 2012, no final | 139 Varennes St | add additional address to 6 units apartment as: 139a, 139b vareenes streetDetails
add additional address to 6 units apartment as: 139a, 139b vareenes street | ||
| Jan 24, 2012 | Completed final sign-off Jun 2012 | 139 Varennes St | Express Project Construction Co | remodel existing kitchen and bathrm on apt #139 and 139a, relocate plumbing, gas electrical work, repl shower pan, faucet, toilet, vanity wall and floor tile, replace kitchn cabinets, sink faucet, range hood, appliances, washer and dryer wall gas heater, dryer exhaust thru roof for top flr unitDetails
remodel existing kitchen and bathrm on apt #139 and 139a, relocate plumbing, gas electrical work, repl shower pan, faucet, toilet, vanity wall and floor tile, replace kitchn cabinets, sink faucet, range hood, appliances, washer and dryer wall gas heater, dryer exhaust thru roof for top flr unit | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Express Project Construction Co (3), Baires Construction Inc, Nabi Construction & Engineering Inc
- Engineers
- Emmanuel Pun, Javed J. Tharavi
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.