Block 1826, lot 031
1454 28th Ave
- City’s use
- Single Family Residential
- Built
- 1951
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,600 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2016 | Completed final sign-off Sep 2016 | 1454 28th Av | High Quality Roofing | reroofingDetails
reroofing | $6,000 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 1454 28th Av | Express Project Construction Co | remodel kitchen, replace 1 window at kitchen area , install ceiling lighting, replace dry rot at lightwell area, replace furnace. window not visible from street. contact bldng. imnsp. for pre-construction meeting.Details
remodel kitchen, replace 1 window at kitchen area , install ceiling lighting, replace dry rot at lightwell area, replace furnace. window not visible from street. contact bldng. imnsp. for pre-construction meeting. | $25,000 |
| Sep 9, 2010 | Completed final sign-off Oct 2010 | 1454 28th Av | Express Project Construction Co | increase job cost by 500 for sheetrock in bedroom at 2nd flDetails
increase job cost by 500 for sheetrock in bedroom at 2nd fl | $500 |
| Jul 8, 2010 | Completed final sign-off Oct 2010 | 1454 28th Av | Express Project Construction Co | remodel existing bathroom with new bathtub, shower, vanity, faucet, toilet, fan and light. wall and floor tiles.Details
remodel existing bathroom with new bathtub, shower, vanity, faucet, toilet, fan and light. wall and floor tiles. | $7,500 |
| Nov 23, 2009 | Completed final sign-off Dec 2009 | 1454 28th Av | Express Project Construction Co | ground floor partial strengthening. add metal straps on existing floor joists to every wall stud, existing beams to post, typical, on existing post to concrete footing. simpson strong tieDetails
ground floor partial strengthening. add metal straps on existing floor joists to every wall stud, existing beams to post, typical, on existing post to concrete footing. simpson strong tie | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Express Project Construction Co (4), High Quality Roofing
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.