Back to bathroom remodel contractors
Express Project Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jul 2022
- Last 24 months
- 0 permits filed
39 permits since 2000: 37 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 16 completed, 1 never finaled. Typically 0 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2022 | Completed final sign-off Jan 2023 | 658 Spruce St | one kitchen and 2 bathroom remodel change 1 existing bathtub to shower space- install ceiling recesses lightsDetails
one kitchen and 2 bathroom remodel change 1 existing bathtub to shower space- install ceiling recesses lights | $40,000 |
| Jul 1, 2021 | Completed final sign-off Sep 2021 | 140 Shrader St | one kitchen and one bathroom remodel. replace 2 windows and 1 door in kitchen area (rear of the building)Details
one kitchen and one bathroom remodel. replace 2 windows and 1 door in kitchen area (rear of the building) | $30,000 |
| Jan 31, 2020 | Completed final sign-off Aug 2020 | 1357 Oak St | kitchen remodel - install all new appliances. washer and dryer. bathroom remodel - close-out (e) shower unit to install new vanity sink. change (e) bathtub to shower space, replace 1 window in bathroom. upgrade (e) electrical subpanel and install recess lights and switchesDetails
kitchen remodel - install all new appliances. washer and dryer. bathroom remodel - close-out (e) shower unit to install new vanity sink. change (e) bathtub to shower space, replace 1 window in bathroom. upgrade (e) electrical subpanel and install recess lights and switches | $50,000 |
| May 21, 2019 | Completed final sign-off Sep 2019 | 48 San Jacinto Wy | remodel (e) bathroom. replace new bathtub, faucets, vanity, exhaust fan, toilet, lights, tiles.Details
remodel (e) bathroom. replace new bathtub, faucets, vanity, exhaust fan, toilet, lights, tiles. | $8,500 |
| Feb 5, 2018 | Completed final sign-off Mar 2018 | 2563 42nd Av | bathroom remodel - convert existing bathtub to shower pan. convert existing shower space to new vanity location. repalce toilet, vanity, light fixture, install exhaust fan. no alteration of wall, window and door.Details
bathroom remodel - convert existing bathtub to shower pan. convert existing shower space to new vanity location. repalce toilet, vanity, light fixture, install exhaust fan. no alteration of wall, window and door. | $8,500 |
| Feb 5, 2018 | Completed final sign-off Apr 2018 | 658 Spruce St | (1) bathroom remodel - replace shower pan (tile finish), toilet, vanity, cabinets, sink and faucets, light fixture, exhaust fan. no alteration of wall, window and door.Details
(1) bathroom remodel - replace shower pan (tile finish), toilet, vanity, cabinets, sink and faucets, light fixture, exhaust fan. no alteration of wall, window and door. | $8,500 |
| Dec 6, 2017 | Completed final sign-off Mar 2019 | 1534 19th Av | legalize (1/4) bath on 2nd fl.Details
legalize (1/4) bath on 2nd fl. | |
| Apr 5, 2017 | Completed final sign-off Aug 2017 | 133 Varennes St | kitchen & bath renovation: new walls, insulation, new plumbing & gas, new electric, all new fixtures, cabinets, appliances, replace 4 rear windows (no size change), new lighting (led), add washer/dryer laundry, new furnace.Details
kitchen & bath renovation: new walls, insulation, new plumbing & gas, new electric, all new fixtures, cabinets, appliances, replace 4 rear windows (no size change), new lighting (led), add washer/dryer laundry, new furnace. | $55,000 |
| Apr 20, 2016 | Never finaled issued Apr 2016, no final | 312 Monticello St | add media room, playroom and one bath on 1st floor, replace extg water heater with new tankless exterior water heater and relocate furnace, & remove illegal backroom on 2nd floor. replace 1 window on 2nd flr, not visible from streetDetails
add media room, playroom and one bath on 1st floor, replace extg water heater with new tankless exterior water heater and relocate furnace, & remove illegal backroom on 2nd floor. replace 1 window on 2nd flr, not visible from street | $40,000 |
| Jun 28, 2012 | Completed final sign-off Oct 2013 | 240 Pope St | add 1 playroom, 1 study room, 1 half bathroom. add laundry & storage on (e) ground floor per planDetails
add 1 playroom, 1 study room, 1 half bathroom. add laundry & storage on (e) ground floor per plan | $35,000 |
| Mar 26, 2012 | Completed final sign-off Jun 2012 | 139 Varennes St | new wall and framing for bath and kitchen on 2nd & 3rd floors apartment. revision to app #201201242790.Details
new wall and framing for bath and kitchen on 2nd & 3rd floors apartment. revision to app #201201242790. | $3,000 |
| Aug 29, 2011 | Completed final sign-off Jan 2012 | 1683 44th Av | to add two bedroom, one full bathroom & laundry area on existing grond floor.Details
to add two bedroom, one full bathroom & laundry area on existing grond floor. | $30,000 |
| Jul 8, 2010 | Completed final sign-off Oct 2010 | 1454 28th Av | remodel existing bathroom with new bathtub, shower, vanity, faucet, toilet, fan and light. wall and floor tiles.Details
remodel existing bathroom with new bathtub, shower, vanity, faucet, toilet, fan and light. wall and floor tiles. | $7,500 |
| Aug 20, 2009 | Completed final sign-off Oct 2009 | 166 Judson Av | remodel (e) bathroom with new bathtub, vanity, faucets, toilet, fan, wall & floor tile. replace dry rot under bathtub and toilet area. replace 1 window. not visible from street.Details
remodel (e) bathroom with new bathtub, vanity, faucets, toilet, fan, wall & floor tile. replace dry rot under bathtub and toilet area. replace 1 window. not visible from street. | $7,700 |
| Jun 14, 2005 | Completed final sign-off Jun 2007 | 350 Dorantes Av | convert existing closet into bathroom, relocate door frames, relocate wall partition and section ofDetails
convert existing closet into bathroom, relocate door frames, relocate wall partition and section of | $5,500 |
| Mar 22, 2005 | Completed final sign-off May 2005 | 915 Vienna St | bathroom remodel. replace bathtub and faucet, lavatory, toilet, ceiling, and wall light fixture.Details
bathroom remodel. replace bathtub and faucet, lavatory, toilet, ceiling, and wall light fixture. | $6,700 |
| Aug 17, 2001 | Completed final sign-off Sep 2001 | 1527 Moraga St | bathroom remodeling. install pocket door & sink in toilet room. install tile on kitchen floor.Details
bathroom remodeling. install pocket door & sink in toilet room. install tile on kitchen floor. | $8,000 |