Back to kitchen remodel contractors
Evan Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Feb 2021
- Last 24 months
- 0 permits filed
25 permits since 2000: 8 completed, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
9 kitchen remodel permits: 5 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2021 | Never finaled issued Feb 2021, no final | 915 Franklin St | unit 304: replace kitchen cabinets. remodel kitdchen and one bathroom. no change to layout of walls and openings. maintain 1 hr separation between units at area of work.Details
unit 304: replace kitchen cabinets. remodel kitdchen and one bathroom. no change to layout of walls and openings. maintain 1 hr separation between units at area of work. | $18,000 |
| Dec 15, 2020 | Never finaled issued Dec 2020, no final | 915 Franklin St | renovate kitchen, replace bathroom vanity, plumbing and electrical as needed in units# 401 and 2012. no layout change.Details
renovate kitchen, replace bathroom vanity, plumbing and electrical as needed in units# 401 and 2012. no layout change. | $24,000 |
| Jan 7, 2020 | Expired or cancelled expired Feb 2021 | 915 Franklin St | units 305 and 405. renovate 2 kitchens and 2 bathrooms. upgrade electrical and plumbing as neededDetails
units 305 and 405. renovate 2 kitchens and 2 bathrooms. upgrade electrical and plumbing as needed | $32,000 |
| Sep 26, 2016 | Expired or cancelled expired Mar 2018 | 21 Dalewood Wy | porposed remodeling (e) kitchen, bath room, dining room and living room at 2nd floor. installing new bedroom and bathroom at 1st floor. rebuild (e) interior stairs. new electrical for whole buildingDetails
porposed remodeling (e) kitchen, bath room, dining room and living room at 2nd floor. installing new bedroom and bathroom at 1st floor. rebuild (e) interior stairs. new electrical for whole building | $88,000 |
| Oct 18, 2011 | Never finaled issued Oct 2011, no final | 2009 Vallejo St | apt#1 new kitcen cabinets, countertops, flooring, new bathroom tile, sink, flooring, paint. unit #4 new kitchen, cabinets, counter tops, flooring, new bathroom tile, sink, flooring, paint unit. no structural work.Details
apt#1 new kitcen cabinets, countertops, flooring, new bathroom tile, sink, flooring, paint. unit #4 new kitchen, cabinets, counter tops, flooring, new bathroom tile, sink, flooring, paint unit. no structural work. | $28,000 |
| Feb 24, 2009 | Never finaled issued Feb 2009, no final | 137 Idora Av | proposed remodeling extg bath room, kitchen, dining room & living room at 2nd floor. install new bath room, family rm, play rm, laundry rm, and computer room at 1st floor. rebuild extg interior and exterior stairs. structural change to extg bldg. new skylight at kchn area.Details
proposed remodeling extg bath room, kitchen, dining room & living room at 2nd floor. install new bath room, family rm, play rm, laundry rm, and computer room at 1st floor. rebuild extg interior and exterior stairs. structural change to extg bldg. new skylight at kchn area. | $55,000 |
| Jul 17, 2008 | Expired or cancelled expired Apr 2012 | 137 Idora Av | remodel kitchen & bathroom, no exterior changes, no layout change & no opening changes; kitchen is located on the middle level and bathroom is on top levelDetails
remodel kitchen & bathroom, no exterior changes, no layout change & no opening changes; kitchen is located on the middle level and bathroom is on top level | $15,000 |
| Apr 24, 2007 | Expired or cancelled expired Jun 2008 | 360 Valdez Av | replace kitchen cabinets & counter tops, paint, on the main floor.Details
replace kitchen cabinets & counter tops, paint, on the main floor. | $8,000 |
| Dec 12, 2005 | Never finaled issued Dec 2005, no final | 1020 Bush St | remodel r baths, enew fistures, toilet, tub, tile for apts 3, 5, 10, 11. 4 vacant units. remove a kitchen and acap off gas.Details
remodel r baths, enew fistures, toilet, tub, tile for apts 3, 5, 10, 11. 4 vacant units. remove a kitchen and acap off gas. | $18,000 |