Block 0276, lot 010
1020 Bush St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 13
- Rooms
- 12 bathrooms
- Building
- 6,900 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2025 | Completed final sign-off Oct 2025 | 1020 Bush St | Byington Electric Corp | change of as builts & panel location and add additional devices ref pa 202503273129Details
change of as builts & panel location and add additional devices ref pa 202503273129 | |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 1020 Bush St | Byington Electric Corp | replace the fire alarm system to the sf/ca fire marshal code interpretation 1103.6.7.1 and add the lf horns inside of the units & wireless monitoringDetails
replace the fire alarm system to the sf/ca fire marshal code interpretation 1103.6.7.1 and add the lf horns inside of the units & wireless monitoring | $30,000 |
| Nov 29, 2021 | Completed final sign-off Jan 2022 | 1020 Bush St | Pro Roofing Maintenance Inc Dba Issaac R | re-roofingDetails
re-roofing | $20,000 |
| Mar 24, 2016 | Completed final sign-off May 2016 | 1020 Bush St | complying with nov 201699901 item #2,#3 and #4 corrections for (e) garbage room.Details
complying with nov 201699901 item #2,#3 and #4 corrections for (e) garbage room. | $2,500 | |
| Dec 6, 2011 | Never finaled issued Dec 2011, no final | 1020 Bush St | patch & ceiling where needed in main lobby common area.Details
patch & ceiling where needed in main lobby common area. | $400 | |
| Jul 12, 2010 | Never finaled issued Jul 2010, no final | 1018 Bush St | street spaceDetails
street space | ||
| Jun 1, 2010 | Never finaled issued Jun 2010, no final | 1018 Bush St | street spaceDetails
street space | ||
| May 11, 2010 | Completed final sign-off Sep 2010 | 1018 Bush St | Evan Construction | proposed a office at (e) ground floor, change of use "m" to "b" over 12 units of residential.Details
proposed a office at (e) ground floor, change of use "m" to "b" over 12 units of residential. | $8,000 |
| May 7, 2010 | Completed final sign-off Aug 2010 | 1020 Bush St | to obtain final inspection for work approved under pa 200511288959; all work is completeDetails
to obtain final inspection for work approved under pa 200511288959; all work is complete | ||
| May 7, 2010 | Never finaled issued May 2010, no final | 1020 Bush St | to obtain final inspection for work approved under pa 200308142125; all work is completeDetails
to obtain final inspection for work approved under pa 200308142125; all work is complete | ||
| Mar 11, 2009 | Completed final sign-off Mar 2009 | 1020 Bush St | Evan Construction | replace missing plaster ceiling with 5/8" firerated sheetrock in utility room. 10x12.Details
replace missing plaster ceiling with 5/8" firerated sheetrock in utility room. 10x12. | $800 |
| Feb 28, 2008 | Expired or cancelled cancelled Jan 2026 | 1018 Bush St | repair any dryrot, patch on replace lath and plaster with 5/8 sheet rock, replace 2 wndws on trade side of bldg.no exterior work except 2 wndw where replacing glazingDetails
repair any dryrot, patch on replace lath and plaster with 5/8 sheet rock, replace 2 wndws on trade side of bldg.no exterior work except 2 wndw where replacing glazing | $8,000 | |
| Dec 14, 2007 | Expired or cancelled expired Apr 2008 | 1020 Bush St | Delta Builders Inc. | renew pa 200607146554 for final inspection.Details
renew pa 200607146554 for final inspection. | |
| Jul 14, 2006 | Expired or cancelled expired Nov 2006 | 1020 Bush St | Delta Builders Inc. | renew pa#200511288959. for final inspection.Details
renew pa#200511288959. for final inspection. | |
| Jun 15, 2006 | Never finaled issued Jun 2006, no final | 1020 Bush St | streetspaceDetails
streetspace | ||
| Mar 14, 2006 | Never finaled issued Mar 2006, no final | 1020 Bush St | street space permitDetails
street space permit | ||
| Dec 12, 2005 | Never finaled issued Dec 2005, no final | 1020 Bush St | Evan Construction | remodel r baths, enew fistures, toilet, tub, tile for apts 3, 5, 10, 11. 4 vacant units. remove a kitchen and acap off gas.Details
remodel r baths, enew fistures, toilet, tub, tile for apts 3, 5, 10, 11. 4 vacant units. remove a kitchen and acap off gas. | $18,000 |
| Nov 28, 2005 | Completed final sign-off Aug 2010 | 1020 Bush St | Delta Builders Inc. | umb retrofit, revision to pa no 200308142125-see plans for revisionDetails
umb retrofit, revision to pa no 200308142125-see plans for revision | |
| Aug 14, 2003 | Completed final sign-off Aug 2010 | 1020 Bush St | umb retrofitDetails
umb retrofit | $40,000 | |
| Oct 24, 2002 | Expired or cancelled expired Mar 2004 | 1020 Bush St | Hai's Roofing Company | reroofingDetails
reroofing | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Delta Builders Inc. (3), Evan Construction (3), Byington Electric Corp (2), Hai's Roofing Company, Pro Roofing Maintenance Inc Dba Issaac R
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.