25 permits since 2000: 8 completed, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2018 | Completed final sign-off Apr 2018 | 915 Franklin St | replace garage door leading to back stairs. replace boiler room door, both are to be fire-rated in response to notice #201725171 1-hour door.Details
replace garage door leading to back stairs. replace boiler room door, both are to be fire-rated in response to notice #201725171 1-hour door. | $1,800 |
| Sep 26, 2016 | Expired or cancelled expired Mar 2018 | 21 Dalewood Wy | porposed remodeling (e) kitchen, bath room, dining room and living room at 2nd floor. installing new bedroom and bathroom at 1st floor. rebuild (e) interior stairs. new electrical for whole buildingDetails
porposed remodeling (e) kitchen, bath room, dining room and living room at 2nd floor. installing new bedroom and bathroom at 1st floor. rebuild (e) interior stairs. new electrical for whole building | $88,000 |
| Feb 24, 2009 | Never finaled issued Feb 2009, no final | 137 Idora Av | proposed remodeling extg bath room, kitchen, dining room & living room at 2nd floor. install new bath room, family rm, play rm, laundry rm, and computer room at 1st floor. rebuild extg interior and exterior stairs. structural change to extg bldg. new skylight at kchn area.Details
proposed remodeling extg bath room, kitchen, dining room & living room at 2nd floor. install new bath room, family rm, play rm, laundry rm, and computer room at 1st floor. rebuild extg interior and exterior stairs. structural change to extg bldg. new skylight at kchn area. | $55,000 |
| May 15, 2008 | Completed final sign-off Jan 2009 | 360 Valdez Av | 2 (n) bedrooms, storage room, family room, utility room @ ground floor. reduced (e) bathroom, and rebuild (e) stairs. install new windows @ ground floor. install new beam @ ground floor.Details
2 (n) bedrooms, storage room, family room, utility room @ ground floor. reduced (e) bathroom, and rebuild (e) stairs. install new windows @ ground floor. install new beam @ ground floor. | $35,000 |
| Apr 23, 2007 | Completed final sign-off Jan 2008 | 337 Molimo Dr | revisions to 200605161732. widen family room, remove stairs at backDetails
revisions to 200605161732. widen family room, remove stairs at back | |
| Jul 17, 2003 | Completed final sign-off Apr 2004 | 429 39th Av | convert (e) bsmt into family room, new stairs fm bsmt to 1/f, widen (e)stairs, relocate washer/dryerDetails
convert (e) bsmt into family room, new stairs fm bsmt to 1/f, widen (e)stairs, relocate washer/dryer | $24,000 |