Evan Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Feb 2021
- Last 24 months
- 0 permits filed
25 permits since 2000: 8 completed, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 449 Bella Vista Wy | replace 2x6 floor decking & handrail on exterior deck (8'x29') with similar 2x6 redwood decking not visible to the street (replace less than 50% of total deck elements.)Details
replace 2x6 floor decking & handrail on exterior deck (8'x29') with similar 2x6 redwood decking not visible to the street (replace less than 50% of total deck elements.) | $4,500 |