Back to kitchen remodel contractors
Eric Wong
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Mar 2026
- Last 24 months
- 4 permits filed
64 permits since 2000: 56 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 18 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2026 | Completed final sign-off Jul 2026 | 3017 Washington St | remodel ground level kitchen and bathroom; remove non-load bearing walls; add new venteless dryer/washer adj to bathroom.Details
remodel ground level kitchen and bathroom; remove non-load bearing walls; add new venteless dryer/washer adj to bathroom. | $47,000 |
| Aug 2, 2022 | Completed final sign-off Jun 2023 | 56 Sotelo Av | interior kitchen remodel with new configurations. no other changes, exterior changes, or occupancy.Details
interior kitchen remodel with new configurations. no other changes, exterior changes, or occupancy. | $30,000 |
| Nov 19, 2021 | Completed final sign-off Mar 2022 | 2655 Bush St | install new cabinets in kitchen and vanity and toilet in bathrooms: new countertop in kitchen, reinstall sinks and faucets and appliances. all of the above work due to fire sprinkler malfunction restore to original condition.Details
install new cabinets in kitchen and vanity and toilet in bathrooms: new countertop in kitchen, reinstall sinks and faucets and appliances. all of the above work due to fire sprinkler malfunction restore to original condition. | $60,000 |
| Dec 1, 2020 | Completed final sign-off Apr 2021 | 3017 Washington St | main floor: kitchen remodel on main level, new lighting, replace cabinetry & countertops, no structural workDetails
main floor: kitchen remodel on main level, new lighting, replace cabinetry & countertops, no structural work | $29,000 |
| Oct 29, 2019 | Completed final sign-off Jun 2020 | 347 28th Av | remove load bearing wall on 2nd and 3rd floor kitchen. remove 2 post and move sliding door.Details
remove load bearing wall on 2nd and 3rd floor kitchen. remove 2 post and move sliding door. | $15,000 |
| Nov 16, 2016 | Completed final sign-off Jun 2018 | 70 Iris Av | interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck.Details
interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck. | $75,000 |
| Sep 26, 2016 | Expired or cancelled cancelled Aug 2017 | 70 Iris Av | kitchen & 2 bathroom remodel. non-structural work.Details
kitchen & 2 bathroom remodel. non-structural work. | $18,000 |
| Feb 4, 2015 | Completed final sign-off Apr 2015 | 2047 Green St | permit is to supplement pa #2014.1230.4689. new door opening at kitchen at 2nd floor. infill 2 door openings at hallwayDetails
permit is to supplement pa #2014.1230.4689. new door opening at kitchen at 2nd floor. infill 2 door openings at hallway | $5,000 |
| Dec 30, 2014 | Completed final sign-off Apr 2015 | 2047 Green St | remodel kitchen & master bathroomDetails
remodel kitchen & master bathroom | $18,000 |
| Sep 8, 2014 | Completed final sign-off Nov 2014 | 383 Lombard St | unit 304: remodel kitchen and 2 bathrooms; to comply with cec150.0(k)3 & 5Details
unit 304: remodel kitchen and 2 bathrooms; to comply with cec150.0(k)3 & 5 | $20,000 |
| May 9, 2013 | Completed final sign-off Mar 2014 | 55 Santa Ana Av | horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr.Details
horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr. | $80,000 |
| Jul 5, 2011 | Completed final sign-off Dec 2011 | 1912 Steiner St | remodel kitchen and relocate master bath. reconfigure partitions. legalize existing hall bath per 3r issuesDetails
remodel kitchen and relocate master bath. reconfigure partitions. legalize existing hall bath per 3r issues | $50,000 |
| Feb 16, 2011 | Completed final sign-off Nov 2011 | 1060 Greenwich St | enclose portion of lightwell on third floor. new skylight in (e) third floor kitchen.Details
enclose portion of lightwell on third floor. new skylight in (e) third floor kitchen. | $10,000 |
| Oct 14, 2010 | Completed final sign-off Nov 2010 | 1062 Greenwich St | route new 3/4" gas line from proposed new meter to (e) range in kitchen; install new step light at staircase landing - high efficacy light v.i.f.; draywall repairs for above work.Details
route new 3/4" gas line from proposed new meter to (e) range in kitchen; install new step light at staircase landing - high efficacy light v.i.f.; draywall repairs for above work. | $1,200 |
| Oct 14, 2010 | Expired or cancelled expired Mar 2012 | 900 Lombard St | kitchen remodel, replace cabinets, countertop, flooring (complete); replace (2) french doors and (1) window @ rear in size in kind; relocate laundry layoutDetails
kitchen remodel, replace cabinets, countertop, flooring (complete); replace (2) french doors and (1) window @ rear in size in kind; relocate laundry layout | $10,000 |
| Aug 14, 2009 | Completed final sign-off Sep 2009 | 143 Riverton Dr | remove partition wall in kitchen and relocate a door to closet.Details
remove partition wall in kitchen and relocate a door to closet. | $1,500 |
| Apr 10, 2009 | Completed final sign-off Jul 2009 | 2311 44th Av | convert extg bath and hallway to new bedroom, relocate extg bath, remodel extg kitchen, remove extg fire place, all on 2nd floor. remodel extg bedroom and entertainment room and toilet on ground floor.Details
convert extg bath and hallway to new bedroom, relocate extg bath, remodel extg kitchen, remove extg fire place, all on 2nd floor. remodel extg bedroom and entertainment room and toilet on ground floor. | $20,000 |
| Oct 10, 2008 | Completed final sign-off Nov 2008 | 1740 Bryant St | remodel kitchen & full bath, new cabinets, countertop & fixtures tanoughout kitchen floor area 12x12Details
remodel kitchen & full bath, new cabinets, countertop & fixtures tanoughout kitchen floor area 12x12 | $29,240 |
| Oct 3, 2008 | Completed final sign-off Jan 2009 | 1632 Pacheco St | remodel extg bath and kitchen and add one new bath. one new interior stair to ground floor on 2nd floor.add 3 new bedrooms, 2 new bath, one new storage and new laundry on ground floor. all work to be with in extg interior space of the bldgDetails
remodel extg bath and kitchen and add one new bath. one new interior stair to ground floor on 2nd floor.add 3 new bedrooms, 2 new bath, one new storage and new laundry on ground floor. all work to be with in extg interior space of the bldg | $45,000 |
| May 6, 2008 | Completed final sign-off Sep 2008 | 1731 28th Av | relocate kitchen, remodel (e) bathroom & add one toilet room. convert (e) kitchen to new storage. all work at 2nd floor. construct two bedroom, one full bathroom & laundry room, all work at ground floor.Details
relocate kitchen, remodel (e) bathroom & add one toilet room. convert (e) kitchen to new storage. all work at 2nd floor. construct two bedroom, one full bathroom & laundry room, all work at ground floor. | $48,000 |