Eric Wong
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Mar 2026
- Last 24 months
- 4 permits filed
64 permits since 2000: 56 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 15 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2010 | Completed final sign-off Sep 2011 | 1085 Greenwich St | reduce roof deck size and replace redwood decking with trex decking or equivalent exterior decking. replace wind screen w/ new tempered glass panel.Details
reduce roof deck size and replace redwood decking with trex decking or equivalent exterior decking. replace wind screen w/ new tempered glass panel. | $10,000 |