Back to bathroom remodel contractors
Eric Wong
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Mar 2026
- Last 24 months
- 4 permits filed
64 permits since 2000: 56 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 28 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2026 | Completed final sign-off Jun 2026 | 2711 Union St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $6,000 |
| Jan 23, 2026 | Completed final sign-off Jul 2026 | 3017 Washington St | remodel ground level kitchen and bathroom; remove non-load bearing walls; add new venteless dryer/washer adj to bathroom.Details
remodel ground level kitchen and bathroom; remove non-load bearing walls; add new venteless dryer/washer adj to bathroom. | $47,000 |
| Jun 16, 2025 | Completed final sign-off Sep 2025 | 175 29th Av | remodel first floor bathroom. moving water closet, removing shower to create a 1/2 bathDetails
remodel first floor bathroom. moving water closet, removing shower to create a 1/2 bath | $9,000 |
| Jan 31, 2025 | Completed final sign-off Apr 2025 | 175 29th Av | remodel 2 full baths in kind on 3rd fl at rear. no structural work.Details
remodel 2 full baths in kind on 3rd fl at rear. no structural work. | $30,000 |
| Jul 2, 2024 | Completed final sign-off Feb 2025 | 175 29th Av | remove and cap off (e) plumbing at hall bath on 3/f, infill door openings to conect to primary closet. primary bath on 3/f, combine (e) primary closet to enlarge (e) primary bathroom, remove one non-load bearing wall.Details
remove and cap off (e) plumbing at hall bath on 3/f, infill door openings to conect to primary closet. primary bath on 3/f, combine (e) primary closet to enlarge (e) primary bathroom, remove one non-load bearing wall. | $26,000 |
| Nov 22, 2021 | Completed final sign-off Oct 2022 | 3017 Washington St | primary bathroom remodel: closet remodel, new washer/dryer, closet (existing closet), remodel of non structural walls to reconfigure space, skylight infill. all work is non structural only.Details
primary bathroom remodel: closet remodel, new washer/dryer, closet (existing closet), remodel of non structural walls to reconfigure space, skylight infill. all work is non structural only. | $28,000 |
| Nov 19, 2021 | Completed final sign-off Mar 2022 | 2655 Bush St | install new cabinets in kitchen and vanity and toilet in bathrooms: new countertop in kitchen, reinstall sinks and faucets and appliances. all of the above work due to fire sprinkler malfunction restore to original condition.Details
install new cabinets in kitchen and vanity and toilet in bathrooms: new countertop in kitchen, reinstall sinks and faucets and appliances. all of the above work due to fire sprinkler malfunction restore to original condition. | $60,000 |
| Oct 16, 2019 | Completed final sign-off Dec 2019 | 2834 Jackson St | 4/f full bath remodel, replace toilet/vanity sink, remove tub for new shower stall, replace floor tiles, no structural work. (plans provided to verify 4/f is habitable, ref pa# 201612275925)Details
4/f full bath remodel, replace toilet/vanity sink, remove tub for new shower stall, replace floor tiles, no structural work. (plans provided to verify 4/f is habitable, ref pa# 201612275925) | $11,000 |
| Nov 16, 2016 | Completed final sign-off Jun 2018 | 70 Iris Av | interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck.Details
interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck. | $75,000 |
| Nov 8, 2016 | Completed final sign-off Feb 2017 | 2047 Green St | bathroom remodel, no structural workDetails
bathroom remodel, no structural work | $8,000 |
| Sep 26, 2016 | Expired or cancelled cancelled Aug 2017 | 70 Iris Av | kitchen & 2 bathroom remodel. non-structural work.Details
kitchen & 2 bathroom remodel. non-structural work. | $18,000 |
| Apr 12, 2016 | Never finaled issued Apr 2017, no final | 3015 Washington St | foundation wall fill in on rear deck, rear addition bedroom, electrical , plumbing for bathroom.Details
foundation wall fill in on rear deck, rear addition bedroom, electrical , plumbing for bathroom. | $18,000 |
| Dec 30, 2014 | Completed final sign-off Apr 2015 | 2047 Green St | remodel kitchen & master bathroomDetails
remodel kitchen & master bathroom | $18,000 |
| Sep 8, 2014 | Completed final sign-off Nov 2014 | 383 Lombard St | unit 304: remodel kitchen and 2 bathrooms; to comply with cec150.0(k)3 & 5Details
unit 304: remodel kitchen and 2 bathrooms; to comply with cec150.0(k)3 & 5 | $20,000 |
| Apr 11, 2014 | Completed final sign-off Jun 2014 | 55 Santa Ana Av | 2/f: full bath remodel - no structural work, no walls to be removed.Details
2/f: full bath remodel - no structural work, no walls to be removed. | $6,800 |
| May 9, 2013 | Completed final sign-off Mar 2014 | 55 Santa Ana Av | horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr.Details
horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr. | $80,000 |
| Feb 27, 2013 | Completed final sign-off Aug 2013 | 77 Pixley St | 1)interior remodel, 2)new half bath at 2nd floor, 3) new stairway down to garage level from 2nd floor. 4)new master bedroom, bath and closet at 3rd floor. new laudry room at 3rd floor. remove 3rd floor deck.Details
1)interior remodel, 2)new half bath at 2nd floor, 3) new stairway down to garage level from 2nd floor. 4)new master bedroom, bath and closet at 3rd floor. new laudry room at 3rd floor. remove 3rd floor deck. | $50,000 |
| Jun 26, 2012 | Completed final sign-off Oct 2012 | 1955 22nd Av | remodel ground floor - add bedroom, family room, laundry, full bath & storage room. interior renovation only.Details
remodel ground floor - add bedroom, family room, laundry, full bath & storage room. interior renovation only. | $40,000 |
| Jul 5, 2011 | Completed final sign-off Dec 2011 | 1912 Steiner St | remodel kitchen and relocate master bath. reconfigure partitions. legalize existing hall bath per 3r issuesDetails
remodel kitchen and relocate master bath. reconfigure partitions. legalize existing hall bath per 3r issues | $50,000 |
| Feb 17, 2011 | Completed final sign-off Feb 2012 | 286 Ramsell St | ground floor remodel. 1) rearrange extg play room to construct one new guest room with bathroom.2)rearrange extg exercise room to construction one new bathroom.Details
ground floor remodel. 1) rearrange extg play room to construct one new guest room with bathroom.2)rearrange extg exercise room to construction one new bathroom. | $30,000 |
| Oct 28, 2009 | Completed final sign-off Mar 2010 | 1719 Broderick St | revision to 200908144860, remove bath tub at 3rd fl bathroom, remove deck repair from scope, reduce opening to 6'6" from proposed 7', replace 2x5 windowDetails
revision to 200908144860, remove bath tub at 3rd fl bathroom, remove deck repair from scope, reduce opening to 6'6" from proposed 7', replace 2x5 window | |
| Aug 14, 2009 | Completed final sign-off Mar 2010 | 1719 Broderick St | new half bathroom at second floor. relocate second floor bathroom to third floor enlarge opening and remove closet in dining room. remove stairs at rear yard. repair deck at rear as in-kind (less than 50%)Details
new half bathroom at second floor. relocate second floor bathroom to third floor enlarge opening and remove closet in dining room. remove stairs at rear yard. repair deck at rear as in-kind (less than 50%) | $30,000 |
| Apr 10, 2009 | Completed final sign-off Jul 2009 | 2311 44th Av | convert extg bath and hallway to new bedroom, relocate extg bath, remodel extg kitchen, remove extg fire place, all on 2nd floor. remodel extg bedroom and entertainment room and toilet on ground floor.Details
convert extg bath and hallway to new bedroom, relocate extg bath, remodel extg kitchen, remove extg fire place, all on 2nd floor. remodel extg bedroom and entertainment room and toilet on ground floor. | $20,000 |
| Oct 10, 2008 | Completed final sign-off Nov 2008 | 1740 Bryant St | remodel kitchen & full bath, new cabinets, countertop & fixtures tanoughout kitchen floor area 12x12Details
remodel kitchen & full bath, new cabinets, countertop & fixtures tanoughout kitchen floor area 12x12 | $29,240 |
| Oct 3, 2008 | Completed final sign-off Jan 2009 | 1632 Pacheco St | remodel extg bath and kitchen and add one new bath. one new interior stair to ground floor on 2nd floor.add 3 new bedrooms, 2 new bath, one new storage and new laundry on ground floor. all work to be with in extg interior space of the bldgDetails
remodel extg bath and kitchen and add one new bath. one new interior stair to ground floor on 2nd floor.add 3 new bedrooms, 2 new bath, one new storage and new laundry on ground floor. all work to be with in extg interior space of the bldg | $45,000 |
| May 6, 2008 | Completed final sign-off Sep 2008 | 1731 28th Av | relocate kitchen, remodel (e) bathroom & add one toilet room. convert (e) kitchen to new storage. all work at 2nd floor. construct two bedroom, one full bathroom & laundry room, all work at ground floor.Details
relocate kitchen, remodel (e) bathroom & add one toilet room. convert (e) kitchen to new storage. all work at 2nd floor. construct two bedroom, one full bathroom & laundry room, all work at ground floor. | $48,000 |
| May 17, 2007 | Completed final sign-off Mar 2008 | 1015 Plymouth Av | add and remodel rooms at ground floor: study room, bedroom, 1/2 bath and family room.Details
add and remodel rooms at ground floor: study room, bedroom, 1/2 bath and family room. | $25,000 |
| Jul 7, 2006 | Completed final sign-off Aug 2006 | 116 Corbett Av | complete bath remodel including new bath fixtures, tiling (5'9"x6'10") no other work. work in unit #116 only.Details
complete bath remodel including new bath fixtures, tiling (5'9"x6'10") no other work. work in unit #116 only. | $6,000 |
| Apr 27, 2006 | Completed final sign-off May 2006 | 265 Broad St | all work @ one room. insulate ground lever 1 rear room. (approx 15' x 22') including ceilings & exterior walls, install drywall on ceiling & exterior walls at opened areas ( including removal of existing drywall). rewire receptacles, & switches & lights in above room. replace ground bath (vanity &Details
all work @ one room. insulate ground lever 1 rear room. (approx 15' x 22') including ceilings & exterior walls, install drywall on ceiling & exterior walls at opened areas ( including removal of existing drywall). rewire receptacles, & switches & lights in above room. replace ground bath (vanity & | $4,000 |
| Aug 8, 2005 | Completed final sign-off Oct 2005 | 2115 Baker St | remodel (e) second level split bath, flourescent lighting.Details
remodel (e) second level split bath, flourescent lighting. | $7,000 |