Block 1043, lot 019
70 Iris Ave
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2018 | Completed final sign-off Oct 2018 | 70 Iris Av | replace existing concrete driveway with driveway that ensures that the site complies with planning code sec.132(g), e.g., front setback area has at least 50-percent permeable surface and at least 20-percent landscaping. ref no. 201611162889bpa.Details
replace existing concrete driveway with driveway that ensures that the site complies with planning code sec.132(g), e.g., front setback area has at least 50-percent permeable surface and at least 20-percent landscaping. ref no. 201611162889bpa. | $3,000 | |
| Jul 2, 2018 | Completed final sign-off Jul 2018 | 70 Iris Av | to comply with physical inspection report #cc-8303Details
to comply with physical inspection report #cc-8303 | ||
| Jul 18, 2017 | Completed final sign-off Jun 2018 | 70 Iris Av | Eric Wong | replace cracked stucco and repair dryrot at front and side of house, new stucco in-kind. repair existing exterior entry stairs and waterproof, repair dryrot and install tiled stairs in kind. revisions to application no. 201611162889.Details
replace cracked stucco and repair dryrot at front and side of house, new stucco in-kind. repair existing exterior entry stairs and waterproof, repair dryrot and install tiled stairs in kind. revisions to application no. 201611162889. | $23,000 |
| Nov 16, 2016 | Completed final sign-off Jun 2018 | 70 Iris Av | Eric Wong | interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck.Details
interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck. | $75,000 |
| Sep 26, 2016 | Expired or cancelled cancelled Aug 2017 | 70 Iris Av | Eric Wong | kitchen & 2 bathroom remodel. non-structural work.Details
kitchen & 2 bathroom remodel. non-structural work. | $18,000 |
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 70 Iris Av | Jemico Llc Dba Renewal By Andersen Of Sf | replace 7 windows like for like with anderson wood clad- 4 visible from street. u factor<.40, bedrooms to comply with egress, windows to be fiber glass wood clad.Details
replace 7 windows like for like with anderson wood clad- 4 visible from street. u factor<.40, bedrooms to comply with egress, windows to be fiber glass wood clad. | $20,869 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Eric Wong (3), Jemico Llc Dba Renewal By Andersen Of Sf
- Engineers
- Jeffrey Haw
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.