Back to kitchen remodel contractors
Eps Remodel Inc
- Based in
- Sacramento
- On San Francisco permits
- Oct 2018 to Aug 2023
- Last 24 months
- 0 permits filed
27 permits since 2000: 20 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2021 | Completed final sign-off Apr 2022 | 649 Fillmore St | to comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartmentDetails
to comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartment | $20,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 23 Hoff St | bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added.Details
bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added. | $78,780 |
| Mar 30, 2021 | Completed final sign-off Oct 2023 | 436 21st Av | kitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range.Details
kitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range. | $36,000 |
| Dec 12, 2019 | Completed final sign-off Oct 2020 | 25 Beideman St | upper unit only -new laundy on the kitchen area.Details
upper unit only -new laundy on the kitchen area. | $3,000 |
| Aug 26, 2019 | Completed final sign-off Oct 2020 | 25 Beideman St | 1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit.Details
1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit. | $60,000 |
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 563 Belvedere St | cosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'.Details
cosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'. | $16,000 |
| Jan 22, 2019 | Completed final sign-off Jan 2020 | 766 20th Av | new electrical panel and rewire the entire unit. new kitchen caibnets and counters, paintinteior and new appliances, fix some drywall cracks (kitchen rmeodel is like for like).Details
new electrical panel and rewire the entire unit. new kitchen caibnets and counters, paintinteior and new appliances, fix some drywall cracks (kitchen rmeodel is like for like). | $38,000 |