Permit GraphShortlistSan Francisco building permits since 2000

Eps Remodel Inc

Contractor license
1014569
State license record
Based in
Sacramento
On San Francisco permits
Oct 2018 to Aug 2023
Last 24 months
0 permits filed

27 permits since 2000: 20 completed, 5 never finaled, 2 expired or cancelled.

Of the 5 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Kitchen remodel permits

AllDeck 2Stairs 2Kitchen remodel 7Bathroom remodel 12

7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 330 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 27, 2021Completed
final sign-off Apr 2022
649 Fillmore Stto comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartment
Details
Permit
202107275137
Status
complete
Filed
Jul 27, 2021
Permit issued
Jul 27, 2021
Final sign-off
Apr 5, 2022
Declared cost
$20,000
Address
649 Fillmore St

to comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartment

Open the permit page

$20,000
Jun 22, 2021Completed
final sign-off Nov 2021
23 Hoff Stbathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added.
Details
Permit
202106222939
Status
complete
Filed
Jun 22, 2021
Permit issued
Jun 22, 2021
Final sign-off
Nov 19, 2021
Declared cost
$78,780
Address
23 Hoff St

bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added.

Open the permit page

$78,780
Mar 30, 2021Completed
final sign-off Oct 2023
436 21st Avkitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range.
Details
Permit
202103307528
Status
complete
Filed
Mar 30, 2021
Permit issued
Mar 30, 2021
Final sign-off
Oct 24, 2023
Declared cost
$36,000
Address
436 21st Av

kitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range.

Open the permit page

$36,000
Dec 12, 2019Completed
final sign-off Oct 2020
25 Beideman Stupper unit only -new laundy on the kitchen area.
Details
Permit
201912129453
Status
complete
Filed
Dec 12, 2019
Permit issued
Dec 12, 2019
Final sign-off
Oct 14, 2020
Declared cost
$3,000
Address
25 Beideman St

upper unit only -new laundy on the kitchen area.

Open the permit page

$3,000
Aug 26, 2019Completed
final sign-off Oct 2020
25 Beideman St1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit.
Details
Permit
201908269891
Status
complete
Filed
Aug 26, 2019
Permit issued
Aug 27, 2019
Final sign-off
Oct 22, 2020
Declared cost
$60,000
Address
25 Beideman St

1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit.

Open the permit page

$60,000
Apr 17, 2019Never finaled
issued Apr 2019, no final
563 Belvedere Stcosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'.
Details
Permit
201904178215
Status
issued
Filed
Apr 17, 2019
Permit issued
Apr 17, 2019
Declared cost
$16,000
Address
563 Belvedere St

cosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'.

Open the permit page

$16,000
Jan 22, 2019Completed
final sign-off Jan 2020
766 20th Avnew electrical panel and rewire the entire unit. new kitchen caibnets and counters, paintinteior and new appliances, fix some drywall cracks (kitchen rmeodel is like for like).
Details
Permit
201901220900
Status
complete
Filed
Jan 22, 2019
Permit issued
Jan 22, 2019
Final sign-off
Jan 10, 2020
Declared cost
$38,000
Address
766 20th Av

new electrical panel and rewire the entire unit. new kitchen caibnets and counters, paintinteior and new appliances, fix some drywall cracks (kitchen rmeodel is like for like).

Open the permit page

$38,000