Back to bathroom remodel contractors
Eps Remodel Inc
- Based in
- Sacramento
- On San Francisco permits
- Oct 2018 to Aug 2023
- Last 24 months
- 0 permits filed
27 permits since 2000: 20 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 8 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2023 | Never finaled issued Aug 2023, no final | 2240 15th St | (2) full bathroom and (2) half bathroom remodels. replace dwv (drain, waste, and vent) and fixtures. framing dry rot repair drywall installation like for like. 2 studs and about 4x4 piece of plywood.Details
(2) full bathroom and (2) half bathroom remodels. replace dwv (drain, waste, and vent) and fixtures. framing dry rot repair drywall installation like for like. 2 studs and about 4x4 piece of plywood. | $25,000 |
| Aug 14, 2023 | Never finaled issued Aug 2023, no final | 2240 15th Av | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $21,122 |
| Jun 1, 2023 | Completed final sign-off Jul 2023 | 404 Vallejo St | one bathroom remodel- like for like: replace tile, tub shower, valve vanity, sink faucet. drywall taping painting. non structural.Details
one bathroom remodel- like for like: replace tile, tub shower, valve vanity, sink faucet. drywall taping painting. non structural. | $13,697 |
| Dec 1, 2022 | Expired or cancelled cancelled Apr 2025 | 1250 Jones St | replace flooring in the salon & powder room and replace light fixtures throughout. paint throughout and install carpet, install wainscot tile in the bathrooms and replace plumbing fixtures like sink and toilets.Details
replace flooring in the salon & powder room and replace light fixtures throughout. paint throughout and install carpet, install wainscot tile in the bathrooms and replace plumbing fixtures like sink and toilets. | $230,000 |
| Jul 27, 2021 | Completed final sign-off Apr 2022 | 649 Fillmore St | to comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartmentDetails
to comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartment | $20,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 23 Hoff St | bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added.Details
bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added. | $78,780 |
| May 28, 2021 | Completed final sign-off Jul 2021 | 54 Stanford Heights Av | bathroom remodel, like for like, no layout changes.Details
bathroom remodel, like for like, no layout changes. | $7,000 |
| Mar 30, 2021 | Completed final sign-off Oct 2023 | 436 21st Av | kitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range.Details
kitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range. | $36,000 |
| Aug 26, 2019 | Completed final sign-off Oct 2020 | 25 Beideman St | 1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit.Details
1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit. | $60,000 |
| May 28, 2019 | Completed final sign-off Jul 2020 | 1122 Wayland St | one bathroom remodel: install new plumbing and electrical fixtures, new tiles, new facuets & vanity. all fixtures are located at same location. no new wall & no exist'g wall relocation. all new lighting shall comply with cec 150.0(k)5.Details
one bathroom remodel: install new plumbing and electrical fixtures, new tiles, new facuets & vanity. all fixtures are located at same location. no new wall & no exist'g wall relocation. all new lighting shall comply with cec 150.0(k)5. | $10,000 |
| May 7, 2019 | Completed final sign-off Sep 2019 | 563 Belvedere St | remove water closet from bathroom and relocate it to (e) closet. relocate laundry from one closet to another.Details
remove water closet from bathroom and relocate it to (e) closet. relocate laundry from one closet to another. | $5,000 |
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 563 Belvedere St | cosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'.Details
cosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'. | $16,000 |